Search Forum
Blog Entry# 994672
Posted: Feb 13 2014 (19:49)
8 Responses
Last Response: Feb 13 2014 (21:38)
8 Responses
Last Response: Feb 13 2014 (21:38)
Feb 13 2014 (19:49) 82107/Mumbai CSMT - Lucknow Suvidha Special
Rang De Basanti^
Rang De Basanti^ 59734 blog posts3 Posts
Not sure for what purpose electrification was done :P
Even after so many days NCR management is yet to assign electric locos to trains for JHS-LJN stretch...
Even after so many days NCR management is yet to assign electric locos to trains for JHS-LJN stretch...
asal mein JHS aur LKO dono hi diesel engines rakhein hue hai...
ab electric coaches LKO ko bhi milne chahiye...
ab electric coaches LKO ko bhi milne chahiye...
NCR officials would be able to give a better reason, But this train can easily continue with E loco upto LJN since it has a very low TAT @LJN and there is no question of loco rotation
Even Pushpak, LJN SF etc can continue with same links in both directions...
Even Pushpak, LJN SF etc can continue with same links in both directions...