Gangavathi railway station update: after 14months ..I visited this station very less progress happened ...
1.there r 3 pfs + 1 extra track load point for goods train total 4 tracks
2. track laying up to pf end (karatagi side end ) completed successfully..but after pf end some track alignment need to be done specially for loco reverse for about 200-300mts ...about 1km single line from ggvt track laid without proper alignment..
3.Fob...
more...
1.there r 3 pfs + 1 extra track load point for goods train total 4 tracks
2. track laying up to pf end (karatagi side end ) completed successfully..but after pf end some track alignment need to be done specially for loco reverse for about 200-300mts ...about 1km single line from ggvt track laid without proper alignment..
3.Fob...
more...
8 Public Posts - Tue Oct 16, 2018
Thanks for the update eagerly to waiting to see the train run till ggvt
I hope we get Gangavathi Yeswanthpur SF express via koppal, hospet, chitradurga.
Departing Gangavathi around 7.30pm to reach YPR at 5am.
If there are platform constraints, let this be maintained at MYS, as Gangavathi Mysuru express, by this it will connect hyderabad karnataka region with southern core.
SWR has to take steps for introduction of this train
Departing Gangavathi around 7.30pm to reach YPR at 5am.
If there are platform constraints, let this be maintained at MYS, as Gangavathi Mysuru express, by this it will connect hyderabad karnataka region with southern core.
SWR has to take steps for introduction of this train
1 Public Posts - Fri Sep 28, 2018
Good news :) if this train extend to mysore it would be useful for commuters
Waste of time if this train go and come to koppal ..,... instead of going Koppal should be take loco reversal in ginigera