Search Forum
Filters:
Blog Posts by ravi2sankar
Page# 49 Blog Entries next>>
very disappoint with this Modi Govt, Even after so many complain about Ashwini Vaishnav, Modi Again give Railway Portfolio to Him. Worst decision.
Now i feel he Behaving like Dictator.
Now i feel he Behaving like Dictator.
14 Public Posts - Tue Jun 11, 2024
Ashwani Vaishnav is a big failure for Indian railways for last 24 months. (1) Let him at least introduce 300 trains for general public all SF trains and 50 percent SL and 50 percent 3E class and with no tatkal in next 12 months. (2) introduce 100 Amrit Bharat Push Pull trains between 12 Indian cities. (3) I have already highlighted 200 pairs of VB sleeper train routes. If he can do these three things in next 24 months, he can wipe out waitlists. This RM will be replaced in 24 months as he will fail in meeting basic needs of no wait list by 2025.
Give him a deadline of 2025 end for achieving Zero wait list and all reservations honoured by IR from January 1, 2026
1 Public Posts - Tue Jun 11, 2024
2 Public Posts - Wed Jun 12, 2024
It's very disappointing from an ex beauracract listening to other Beauracrats for the inefficiency in not able to give a berth to Indian passengers. The Railways has upgraded ICF coaches for at least 3000 rakes till date to LHB. Consider some of them or 50 percent of them are.scrapped. what happened to remaining 1500 rakes. Why IR could not introduce one new train in last 10 years under BJP / NDA rule. Because of the politicians like Suresh Prabhu, CA like piyush Goyal, and Bureaucrats like Ashwani Vaishnavji are successfully fooled by IR beaurucracy. Why not one new train introduced till date by NDA government other than so called VBs
What...
more...
What...
more...
Jun 11 (07:00) 20957/Indore - New Delhi SF Express (Via Ratlam) (PT) | INDB/Indore Junction (6 PFs)
Western~
Western~ 44 blog posts3 Public Posts - Tue Jun 11, 2024
1 Public Posts - Tue Jun 11, 2024
This train should get halt in panipat and karnal as will boost the occupancy
1 Public Posts - Thu May 02, 2024
1 Public Posts - Sun Jun 02, 2024
1 Public Posts - Mon Jun 03, 2024
1 Public Posts - Tue Jun 11, 2024
1 Public Posts - Yesterday
As the CSMT station has extended the platforms 10 and 11 with successful interlocking completed on June 2, 2024, the much required and long pending expansion of the rakes of CSMT - Hyderbad Deccan SF express 22731 and 22732, and CSMT Hyd Hussain Sagar express 12701 /12702 to 24 coaches trains from current 16 coach rakes. Since these two trains have rake sharing and can be expanded by adding 3E and SL coaches (four each) to improve the availability of the berths on daily basis. This is as good as adding one new train of 16 coaches. Also, the running time of 13 hours 57 minutes is too long for a distance of 770 kms. All other intercity trains say between Mumbai - Nagpur, Delhi - Varanasi, Jaipur - Bandra SF completes similar distances within 12 hours. We request the authorities at both SCR and CR to increase speed of...
more...
more...
CR/SWR should think of running daily one Night SF train from either CSMT/LTT/DR to Bengaluru.
Timings must be within 14/15 hours. Route SMVT/DMM/GTL/KLBG/SUR/PUNE/KALYAN
Timings:- CSMT/LTT 21:30 SMVT:- 11.30/12.00
I...
more...
Timings must be within 14/15 hours. Route SMVT/DMM/GTL/KLBG/SUR/PUNE/KALYAN
Timings:- CSMT/LTT 21:30 SMVT:- 11.30/12.00
I...
more...
1 Public Posts - Mon Feb 19, 2024
Udyan Express can be made as SF and cut down the intermediate stops to around 10 and run this train with 18 hour transit time
1 Public Posts - Wed May 15, 2024
Page# 49 Blog Entries next>>