Search Forum
Filters:
Blog Posts by zbtt is strictly for operational convinience
Page# 457 Blog Entries next>>
Mar 16 2021 (23:19) 06352/Nagercoil - Mumbai CSMT Festival Special (Via Renigunta) | TU/Tadipatri (3 PFs)
Boxerbhai_432~
Boxerbhai_432~ 12109 blog posts8 Public Posts - Tue Mar 16, 2021
4 Public Posts - Wed Mar 17, 2021
ardha raatri 1:30 2:30 halts... em parledu peekanivandi...
patronage lenapudu peekalsindee.
aina ilaa peekina prati halt ki speed up ante elaaga. kasanta opika patandi.. 55 kms doubling aye varku
patronage lenapudu peekalsindee.
aina ilaa peekina prati halt ki speed up ante elaaga. kasanta opika patandi.. 55 kms doubling aye varku
Mar 15 2021 (19:34) 02277/Tirupati - Jammu Tawi Humsafar Special | TPTY/Tirupati (6 PFs)
MeghaSyam^~
MeghaSyam^~ 152068 blog posts11 Public Posts - Mon Mar 15, 2021
3 Public Posts - Tue Mar 16, 2021
1 Public Posts - Sat Mar 20, 2021
Mar 13 2021 (10:39) 07615XX/Kacheguda - Madurai Weekly Special | KCG/Kacheguda (5 PFs)
MeghaSyam^~
MeghaSyam^~ 152068 blog posts18 Public Posts - Sat Mar 13, 2021
2 Public Posts - Sun Mar 14, 2021
100% agree wth u. 4 am dep frm tpty towards dmm is bound to go empty. instead post 6:00 am dep frm tpty is desirabl.. and it wld be convinient fr tpty bound pax frm ns bvrt bza too...
if new slot frm bza to tpty is a prblm, atleast they can readily swap the slots of seshadri and Ns Dmm.
if new slot frm bza to tpty is a prblm, atleast they can readily swap the slots of seshadri and Ns Dmm.
7 Public Posts - Tue Mar 16, 2021
3 Public Posts - Wed Mar 17, 2021
Mar 14 2021 (23:51) 07225xc/Vijayawada - SSS Hubballi Amaravati Special Fare Special
AmaravatiExpress~
AmaravatiExpress~ 1074 blog postsOne more Halt removed... Donakonda it is !
During the review of train timings which are running as special trains, the following stoppages for Special trains running over SCR was erroneously included in Passenger Reservation System (PRS).
Accordingly,...
more...
During the review of train timings which are running as special trains, the following stoppages for Special trains running over SCR was erroneously included in Passenger Reservation System (PRS).
Accordingly,...
more...
1 Public Posts - Mon Mar 15, 2021
Donakonda halt has been removed for all pivotal trains running in this section in zbtt. like kondaveedu prasanti and now amaravati.. diguvumetta too has been removed for all above said trains.. definetely same will be followed fr vsg exp...
Indeed good to see d daring step of halt removals.. wish more should follow where midnight halts with very low bookings fr a given train should be removed.
Indeed good to see d daring step of halt removals.. wish more should follow where midnight halts with very low bookings fr a given train should be removed.
Narsaraopet-Vinukonda doubling.It is my observation during journey in prasanthi exp at night time. The land levelling started from narsaraopet outer and completed almost till vinukonda. Only a little portion is not levelled in between vellalacheruvu and savalyapuram. Major bridges b/w savalyapuram and VNk, vellalacheruvu-savalyapuram is completed. A new station building is constructed at santamaguliru.land levelling works completed almost till vinukonda outer except a very small strip . It is also observed that works are also going in night time. If they really take-up work, satuluru-vinukonda can be completed this year. Huge ballast procured at savalyapuram station. Only two major bridges pending and also pillars are laid for bridge. Only slab works are pending for both the bridges
any idea about work progress in vinukonda - digguvametu section ?