Search Forum
Filters:
Page# 24 Blog Entries next>>
Apr 25 (17:18) 16590/Rani Chennamma Express (PT) | MRJ/Miraj Junction (6 PFs)
lukmanf049651
Deccan_railway~ 310 blog posts🍁🥳🍁 Alas! Achieved.
Ksr Bengaluru - Miraj, Rani chennamma Express finally got it's old Nameboard back.
The RSA still continues....
Thanks to @Gajendr82753975 for the tireless efforts.
...
more...
Ksr Bengaluru - Miraj, Rani chennamma Express finally got it's old Nameboard back.
The RSA still continues....
Thanks to @Gajendr82753975 for the tireless efforts.
...
more...
Full video of Electrification CRS between Solapur - Mohol - Solapur and Speed Trial.
click here
CRS Special with Gooty WDP-4D departed Solapur at 11:00 and reached Mohol at 15:15. CRS inspected Bale...
more...
click here
CRS Special with Gooty WDP-4D departed Solapur at 11:00 and reached Mohol at 15:15. CRS inspected Bale...
more...
2 Public Posts - Sat Mar 26, 2022
1 Public Posts - Sun Mar 27, 2022
#BangaloreMetro
TBM Vamika (S-1260) deployed by Afcons Infrastructure recorded its first breakthrough this evening by entering Dairy Circle station on Gottigere-Nagwara line of the Bangalore Metro Rail project. AFCONS is constructing this portion of 13.89km UG corridor.
Source- MetroRailToday
TBM Vamika (S-1260) deployed by Afcons Infrastructure recorded its first breakthrough this evening by entering Dairy Circle station on Gottigere-Nagwara line of the Bangalore Metro Rail project. AFCONS is constructing this portion of 13.89km UG corridor.
Source- MetroRailToday
5 Public Posts - Wed Jan 26, 2022
2 Public Posts - Thu Jan 27, 2022
#Bangalore Metro's TBM Varada has been recommissioned by Afcons for her 2nd & final tunneling assignment.
After finishing up-line's work in Nov, will now build 596m down-line tunnel from Rashtriya Military School → Langford Town. Details: click here
After finishing up-line's work in Nov, will now build 596m down-line tunnel from Rashtriya Military School → Langford Town. Details: click here
2 Public Posts - Fri Jan 28, 2022
1 Public Posts - Mon Jan 31, 2022
#Bangalore Metro: NCC has started test piling for all 3 packages of the 37 km Airport Line (Blue Line).
On Package-2, they've so far bored 4 x 1m dia piles with depths of up to 30m.
On Package-2, they've so far bored 4 x 1m dia piles with depths of up to 30m.
6 Public Posts - Mon Feb 14, 2022
1 Public Posts - Thu Feb 17, 2022
Dec 09 2021 (18:26) 16589/Rani Chennamma Express (PT) | LWR/Alnavar Junction (3 PFs)
lukmanf049651
Deccan_railway~ 310 blog posts💠🚦💠 Rani Chennamma Express Video.
#Alnavar to #Londa Doubling & Electrification update.
#Bangalore #Miraj #Ranichenammaexpress
#Alnavar to #Londa Doubling & Electrification update.
#Bangalore #Miraj #Ranichenammaexpress