Search Forum
Filters:
Page# 23 Blog Entries next>>
Mumbai Railway Vikas Corporation work stops Western Railway in tracks! Due to Mrvc Ltd piling work at Virar platform north end, approx 12 core signalling cables are damaged leading to point and signal non-functional at north side of Virar station. Restoration is under progress. Two points have been restored and at other work in progress.
#Wrupdate #Late
#Wrupdate #Late
NEW LHB RAKE AT GAYA JUNCTION PF 6.
Wish 22357 Gaya Banaswadi Gaya 22358 to be Reality Soon.
.
Total coaches : 10 SL, 2AC=2, 3AC = 3, 4 EOGs.
.
CC...
more...
Wish 22357 Gaya Banaswadi Gaya 22358 to be Reality Soon.
.
Total coaches : 10 SL, 2AC=2, 3AC = 3, 4 EOGs.
.
CC...
more...
I spotted after Deboarding 13243 Patna Bhabua Intercity Express on PF 5 at 8:30 pm.
.
12366 Ranchi Patna Jan Shatabdi was Standing on PF 4. Hauled by WAP7.
.
63315/Jhajha - Gaya...
more...
.
12366 Ranchi Patna Jan Shatabdi was Standing on PF 4. Hauled by WAP7.
.
63315/Jhajha - Gaya...
more...
13 Public Posts - Sat Oct 12, 2019
1 Public Posts - Mon Oct 14, 2019
1 Public Posts - Tue Apr 11, 2023
Apr 12 2018 (20:01) 03636/Anand Vihar Terminal - Gaya Special Fare SF Summer Special
Bodhgaya^~
Bodhgaya^~ 3038 blog postsBooking Status (just before Charting @ 2:30 pm) :-
▪ 250+ WaitList in Sleeper ,
▪ 50+ in 3ac (with 4 coaches of 3ac)
▪RAC 11 in 2ac as well ( with 2 coaches of 2ac )
Few...
more...
▪ 250+ WaitList in Sleeper ,
▪ 50+ in 3ac (with 4 coaches of 3ac)
▪RAC 11 in 2ac as well ( with 2 coaches of 2ac )
Few...
more...
7 Public Posts - Thu Apr 12, 2018
▪ Crossed MNR / Makkhanpur @ 22:56 (1h #Late). 225 km ahead of Anand Vihar.
▪ Crossed etw / etawah at 23:35. And was showing Right Time Expected Arrival at kanpur.
.
▪ Crossed subedarGanj (4 km before Ald) at 6 am(2 hours #Late). And took 1 hour for this 4 km. Still 40 minutes stopped at Ald.
....
more...
▪ Crossed etw / etawah at 23:35. And was showing Right Time Expected Arrival at kanpur.
.
▪ Crossed subedarGanj (4 km before Ald) at 6 am(2 hours #Late). And took 1 hour for this 4 km. Still 40 minutes stopped at Ald.
....
more...
Feb 25 2018 (19:59) 12311/Netaji Express (PT) | GAYA/Gaya Junction (10 PFs) | VGLJ/WAG-7/24673
Bodhgaya^~
Bodhgaya^~ 3038 blog posts1 Public Posts - Sun Feb 25, 2018
22409 Gaya Anand Vihar Garib Rath AC Express departed from Right time 7:30 pm from it's regular platform no. 4.
G13 coach is Duronto Liveried.
Hauled by Loco : GZB WAP 1 #22039.
.
12366...
more...
G13 coach is Duronto Liveried.
Hauled by Loco : GZB WAP 1 #22039.
.
12366...
more...
Feb 16 2018 (06:36) 63250/Gaya - Patna MEMU | GAYA/Gaya Junction (10 PFs)
Bodhgaya^~
Bodhgaya^~ 3038 blog postsHuge Rush #Compact #Congested Crowd. GAYA- PATNA- GAYA TRAINS. No Seat for #Women and #Senior #Citizens. Some what they are ready to manage to seat on the floor.
.
Travelled Gaya to Patna on Monday afternoon 11:45 AM train 63250/Gaya - Patna MEMU departed at 12 noon (#LATE by 15 minutes) from Platform no. 8. (Missed the previous 9:30 am train 63248/Gaya - Patna MEMU by 5 minutes which departed from Right time 9:30 am). Another similar MEMU 63289/Gaya - Dehri On Sone Memu was...
more...
.
Travelled Gaya to Patna on Monday afternoon 11:45 AM train 63250/Gaya - Patna MEMU departed at 12 noon (#LATE by 15 minutes) from Platform no. 8. (Missed the previous 9:30 am train 63248/Gaya - Patna MEMU by 5 minutes which departed from Right time 9:30 am). Another similar MEMU 63289/Gaya - Dehri On Sone Memu was...
more...
Page# 23 Blog Entries next>>