Search Forum
Filters:
Page# 2 Blog Entries
mumbai #monorail running at loss of 5 lakh per day
The Mumbai Metropolitan Region Development Authority (MMRDA) may claim that the Wadala-Chembur Monorail corridor is getting a good response, but the numbers reveal that the line is operating at a loss.
While tickets rake in Rs. 2 lakh every day, it takes Rs. 7 lakh per day to operate the Monorail. That's a loss of Rs. 5 lakh per day, which works out to Rs. 1.5 crore a month.
Confirming...
more...
The Mumbai Metropolitan Region Development Authority (MMRDA) may claim that the Wadala-Chembur Monorail corridor is getting a good response, but the numbers reveal that the line is operating at a loss.
While tickets rake in Rs. 2 lakh every day, it takes Rs. 7 lakh per day to operate the Monorail. That's a loss of Rs. 5 lakh per day, which works out to Rs. 1.5 crore a month.
Confirming...
more...
1 Public Posts - Tue Apr 01, 2014
1 Public Posts - Wed Apr 02, 2014
Fresh pics of Mumbai #Monorail on a trial run taken by my bro @ Vadala Rd.
Page# 2 Blog Entries