Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

शिव की जटाओं से बहती है शिव गंगा - Divyanshu

Search Forum
Filters:
Page#    18 Blog Entries  next>>
General Travel
40782 views
6

Aug 09 2020 (11:23)   22504/Dibrugarh - Kanniyakumari Vivek SF Express (PT) | DBRG/Dibrugarh (4 PFs)
pramod
pramod   175 blog posts
Entry# 4684068            Tags   Past Edits
#record breaking
vivek express now run daliy with great speed up



longest
...
more...
daily running train in india
1. cape dbrg Vivek express
2. avadh assam express
3. Kerala express

Translate to English
Translate to Hindi

19 Public Posts - Sun Aug 09, 2020
General Travel
80194 views
10

Feb 26 2019 (19:13)   GBQ/Godbhaga (2 PFs)
Chendurexpress^~
Chendurexpress^~   1767 blog posts
Entry# 4243362            Tags  
2000 Meter Long Train ran on ECoR first time on Experimental Basis
.
.
Categories East Coast Railway, ECoR-Sambalpur Division
BHUBANESWAR: With a view to providing less manpower and economic path utilisation, East
...
more...
Coast Railway has run 3 train rakes at a time on an experimental basis for the first time. The length of complete train was about 2000 meter long.
The train consisting of 147 Wagons, 03 Brake/Guard Vans and 04 Engines was planned to run on experimental basis between Godbhaga and Balangir Stations in Sambalpur Railway Division. The first rake of 45 Flat Wagons loaded with Containers and the second & third empty rakes of 51 Alumina Containers each are going towards Visakhapatnam Port.
Running of this train on experimental basis has utilised less manpower, run on a single Signal and Single Closure of Level Crossings.

Translate to English
Translate to Hindi

28950 views
0

Aug 28 2019 (12:39)guest
Re# 4243362-2              
This is amazing by EcoR #Record
Translate to English
Translate to Hindi
General Travel
12074 views
17

★★
Mar 12 2018 (08:54)   12951/Mumbai Central - New Delhi Tejas Rajdhani Express | BRC/WAP-7/30480
BRCWAP7~
BRCWAP7~   13281 blog posts
Entry# 3195591            Tags   Past Edits
🔥MUMBAI RAJDHANI🔥 yesterday got delayed depature at 17:52.. instead...
It Arrive Tilak Bridge @ 08:30 (3mins early)..
At NEW DELHI 08:40 (5mins delay due to outer)
Covered the 1386 km in. 14h 48m (e2e)..
With
...
more...
an massive average of 94 km/h⚡⚡⚡
#record run.

Translate to English
Translate to Hindi

12 Public Posts - Mon Mar 12, 2018

2 Public Posts - Tue Mar 13, 2018
General Travel
16207 views
3

Jan 05 2017 (16:14)   12876/Neelachal Express (PT)
Mayank Singh~
Mayank Singh~   2372 blog posts
Entry# 2116921            Tags  
Why the heck is this train not cancelled? Started from NDLS with delay of 35 hrs[who starts a train with this delay] and now it is delayed by ~50 hrs at LKO[Is this some kind of a record or something]?
Translate to English
Translate to Hindi

3 Public Posts - Thu Jan 05, 2017

2 Public Posts - Fri Jan 06, 2017

6170 views
1

Jan 06 2017 (12:49)guest
Re# 2116921-6               Past Edits
Arriving BKSC now
#Record is of 70 hours I think
Translate to English
Translate to Hindi

8 Public Posts - Fri Jan 06, 2017
General Travel
9507 views
1

Jul 06 2016 (15:56)   12270/Hazrat Nizamuddin - MGR Chennai Central Duronto Express | NGP/Nagpur Junction (8 PFs)
 
Erode_WAP4^~
Erode_WAP4^~   32538 blog posts
Entry# 1919961            Tags  
#Record breaking stupendous run in NGP BPQ...
Covered the 211 kms in 2hrs 6mins @ ★ 100.47 km/hr ★
44mins delay covered by 7hrs late running train...
Great achievement.
Translate to English
Translate to Hindi

3 Public Posts - Wed Jul 06, 2016
Page#    18 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy