Traffic Block of Sadar Washing line/Lucknow from 18.08.2023 to 16.12.2023 (120 Days) for Up-gradation of 26 Coach Length New Washing Line as per latest CAMTECH drawing.
At Present, Primary Maintenance. of t.no. 12232/12231/14218/14217 (No. of rakes-4, Load-24 coaches ICF at Present) is done at Sadar Washing line Lucknow
During traffic block Rakes of 12231/14218/14217/12232 Will get Primary Maintenance at...
more... PYGS with insertion of one Scratch rake of same composition ex PYGS to work. as 14217 daily, Incoming rake of 14218 will get Primary Maintenance at PYGS. (No. of rakes-5, Load 24 ICF coaches. each).