Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

हाटे-बाजारे एक्सप्रेस : चलती - फिरती मछली बाजार - Piyush Singh

Search Forum
Post PNR

15850/Σ Bangalore Durg ΣChain


Created: Jul 25 2013 (16:56) by Siddharth S^~

Description/Uses/Merits of this ΣChain
Alternate weekly

00


ΣChain Blog

Page#    Showing 6 to 10 of 514 blog entries  <<prev  next>>
General Travel
26916 views
16

★★
Jul 17 2014 (20:05)   22626/KSR Bengaluru - MGR Chennai Central Double Decker Express | ED/WAP-4/22693
 
Hiriyanna^~
Hiriyanna^~   3931 blog posts
Entry# 1165315            Tags   Past Edits
I am all set to burn the tracks...
Translate to English
Translate to Hindi

8188 views
0

Jul 17 2014 (23:53)
bengalurumail~
bengalurumail~   3076 blog posts
Re# 1165315-1              
#offlink ED beauty
Translate to English
Translate to Hindi
General Travel
4612 views
2

Aug 24 (18:15)   22626/KSR Bengaluru - MGR Chennai Central Double Decker Express
kjmwag9hc^~
kjmwag9hc^~   3286 blog posts
Entry# 6167016            Tags  
Is this train having such a slow and slack filled schedule just to accommodate VB OT @ KPD?

Reaches JTJ 15-20mins BT on a good day!

It should be restored to it's old
...
more...
timings and tweak schedule such that OT Could happen at BSM/KPN itself!

Translate to English
Translate to Hindi

More Posts
Rail Fanning
33576 views
17

★★
Aug 03 (22:53)   22626/KSR Bengaluru - MGR Chennai Central Double Decker Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs) | RPM/WAP-7/30680
kjmwag9hc^~
kjmwag9hc^~   3286 blog posts
Entry# 6145525            Tags   Past Edits
11 compliments
Great Great Great Great Great:Nice captures...👍👍 Great Great Great Great:. Great Great

9 pics

From The Archives #archives
22626/22625 Bengaluru-Chennai Double Decker SF Express captured at Bengaluru And Chennai ; May-June 2022

Coincidentally both my onward and return journey were by the Double Decker and the SAME LOCOMOTIVE WAS LEADING both the times😃
Royapuram's
...
more...
white stallion: RPM/WAP-7/30680

Here are some captures of the multilingual train boards and locomotive!!

For your views ! 😄

Translate to English
Translate to Hindi

General Travel
30500 views
4

Aug 03 (23:04)
kjmwag9hc^~
kjmwag9hc^~   3286 blog posts
Re# 6145525-1            Tags   Past Edits
1 compliments
Great
Another Pic;this was taken in July 2022....I think

#archives
Translate to English
Translate to Hindi

More Posts
Info Update
1076035 views
2

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   557 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced wnd cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that my post don't get archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can see that whether this coach composition for train sets will become a successful idea or will become a flop idea.

Translate to English
Translate to Hindi

More Posts
Rail News
366225 views
0

IR Affairs
SECR/South East Central
Aug 01 (22:47)   73 Trains Cancelled in Chhattisgarh Due to Railway Infrastructure Work

RFARNAVSECR   2 news posts
Entry# 6143364   News Entry# 563175         Tags   Past Edits
छत्तीसगढ़ से गुजरने वाली 73 ट्रेनें कैंसिल:19 अगस्त तक चलेगा डेवलपमेंट वर्क; 22 ट्रेनों का बदला गया रूट

The Indian Railways has cancelled 73 trains passing through Chhattisgarh due to inter-locking work on the Rajnandgaon-Kalamna railway section of the South East Central Railway Nagpur Rail Division. The pre-non-interlocking work will be carried out from August 4th to 13th, while the non-interlocking work will be done from August 14th to...
more...
19th. This work is part of the 228-kilometer third railway line project between Rajnandgaon and Nagpur, which is being constructed at a cost of 3540 crores. The project aims to improve the railway infrastructure and enhance the capacity of the line.

Chhattisgarh se jaane waali 73 trains ko railway ne cancel kar diya hai. South East Central Railway Nagpur Rail Division ke Rajnandgaon-Kalamna rail section pe inter-locking ka kaam hoga. Pre-non-interlocking ka kaam 4 se 13 August aur non-interlocking ka kaam 14 se 19 August tak hoga. Is work ke wajah...
more...
se kuch trains cancel kar di gayi hai aur kuch trains apne destination se pahle hi khatam aur chalu ki jaengi. Rajnandgaon-Nagpur third rail line project ke andar, 228 kilometer ki third rail line ka construction 3540 crore rupees me ho raha hai.
Page#    Showing 6 to 10 of 514 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy