Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Vaishali Express - जितना सुंदर तुम्हारा नाम उतनी सुंदर तुम्हारी चाल - be my valentine - Rahul Vatsa

Search Forum
Post PNR

20524/Σ sushashan-gkp ΣChain


Created: Feb 22 2015 (14:56) by Raju Sharma

Description/Uses/Merits of this ΣChain
Delhi to gkp on wed best option

00


ΣChain Blog

Page#    Showing 6 to 10 of 706 blog entries  <<prev  next>>
0
updating ...
1 wishes
शुभ यात्रा
Happy Independence Day 🫡

31 Posts

FmtBlog
22884 views
0

Aug 15 (09:51)
Rai_abhi^~
Rai_abhi^~   29522 blog posts
Re# 6157902-32            Tags  
@BWN: Barddhaman Jn   2km/h   3h 51m late
@BWN: Barddhaman Jn &2 km/h #13020: Bagh Express is coming on PF No 05
Translate to English
Translate to Hindi

More Posts
General Travel
385332 views
10

Jul 03 (13:16)   12311/Netaji Express (PT) | HWH/Howrah Junction (23 PFs)
guest
Entry# 6112862            Tags   Past Edits
2 compliments
Useful Useful
Eastern Railway will convert following trains to LHB coaches in FY 2024-2025.
Only Howrah Division Trains are mentioned . 3 trains are intercity with Chair Car facility.
Info received from RTI
Translate to English
Translate to Hindi

More Posts
General Travel
34167 views
0

Aug 08 (23:25)   13020/Bagh Express | BHTR/Bhatpar Rani (2 PFs) | HWH/WAP-4/22379
akkutheraillover~
akkutheraillover~   3555 blog posts
Entry# 6150673            Tags   Past Edits
click here subscribe for more...
Translate to English
Translate to Hindi
Rail News
19608 views
0

IR Affairs
NER/North Eastern
Aug 04 (08:53)   Train Delays at Deoria Sadar Due to Track Maintenance

AdittyaaSharma^~   73681 news posts
Entry# 6145725         Tags   Past Edits
रेलवे ट्रैक पर मरम्मत के चलते 3.25 घंटा रहा ब्लाक

Due to track maintenance work at Deoria Sadar Railway Station, a 3.25-hour block was implemented on the down track. Two trains passing through the down track were delayed, causing inconvenience to passengers. The engineering department took the block at 2:00 PM for railway line repair work on the down track....
more...
Railway employees were working near Jamuna Sadar at Deoria Sadar Railway Station. They started working on railway line number three. The employees completed the work after working for three hours. During this time, two trains passing through Deoria Sadar, including down 13020 Howrah to Kathgodam Express, were delayed. The Howrah Express train was stopped at Gorakhpur and Chauri Chaura railway stations.

Deoria Sadar Railway Station pe track pe repair work ki wajah se 3.25 ghante ka block liya gaya tha. Down track se jaane wali do trains ko rok kar chalaya gaya. Isse passengers ko problem aayi. Deoria Sadar Railway Station ke down track pe rail line repair work ke liye 2...
more...
baje se engineering department ne block liya tha. Is wajah se down track se jaane wali trains ko roka gaya tha. Deoria Sadar Railway Station ke Jamuna Sadar ke paas railway ke employees kaam kar rahe the. Employees railway line number three pe kaam shuru kiya. Employees ne teen ghante tak mehnat kar kaam ko pura kiya. Is beech Deoria Sadar se guzarne wali down 13020 Howrah se Kathgodam Express samेत do trains ko late kar chalaya gaya. Howrah Express train ko Gorakhpur aur Chauri Chaura railway station pe train ko roka gaya hai.
Rail News
59798 views
0

IR Affairs
SER/South Eastern
Jul 26 (07:56)   Train Services Disrupted in Bareilly Due to Roza Station Remodelling

AdittyaaSharma^~   73681 news posts
Entry# 6136580         Tags   Past Edits
आज भी बरेली नहीं आएंगी कई ट्रेनें, रेल यात्रियों की दिक्कतें बढ़ीं

Due to ongoing remodelling work at Roza station in Bareilly, Uttar Pradesh, many train services have been affected. Several trains were canceled or rerouted on Thursday, July 25th. The affected trains included the Jannayak Express, Jansseva Express, Nauchandi Express, and others. This disruption is a result of inter-locking and non-inter-locking remodelling...
more...
work that began on July 7th. The work is expected to be completed by July 7th, 2024. The Divisional Railway Manager (DRM) visited the site on Thursday and instructed the engineering team to expedite the work. Several trains, including the Lohit Express, Shushasan Express, Garibrath Express, and Amarnath Express, experienced delays on Thursday, causing inconvenience to passengers.

Bareilly ke Roza station pe chal rahe remodelling work ki wajah se, bahut saari trains ka chalna affected ho raha hai. Kafi trains Thursday ko cancel ya divert ho gayi. Isme Jannayak Express, Jansseva Express, Nauchandi Express bhi shamil hain. Ye sab 7 July se chala a raha hai aur...
more...
7 July tak khatam hone wala hai. Thursday ko DRM sahab Roza station gaye aur unhone engineering team ko jaldi kaam pura karne ka kaha. Lohit Express, Shushasan Express, Garibrath Express, aur Amarnath Express, jaise bahut saari trains Thursday ko late thi, isse passengers ko dikkat hui.
Page#    Showing 6 to 10 of 706 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy