Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Forget AI; our RailFans are endowed with NI - Natural Intelligence

Search Forum
Post PNR

4629/Σ Gorakhpur VSKP Fastest Travel Chain (all 7 days) ΣChain


Created: Feb 27 2012 (12:35) by Sabyasachi~

Description/Uses/Merits of this ΣChain
Gorakhpur to VSKP connectivity on 4 days(Su,M,Tu,Fr).Also one can avail 5052 and 5050 on other 3 days with the same Link. Also can avail Telescopic rate of fare. Also the fastest connectivity between the Nodes. KOAA to HWH Station transit at Early Dawn will cost only 15 minutes of your total...
more...
buffer time by CAB.

13


ΣChain Blog

Page#    Showing 31 to 35 of 1250 blog entries  <<prev  next>>
0
updating ...
2 wishes
Happy Journey Happy Journey
back to surat ๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚๐Ÿš‚

2 Posts

FmtBlog
80986 views
0

Nov 02 2023 (18:42)
AVI_RAJPUT^~
AVI_RAJPUT^~   7517 blog posts
Re# 5869573-3            Tags  

More Posts
General Travel
33695 views
0

Oct 30 2023 (00:32)   12703/Falaknuma Express (PT)
subh.pesit
subh.pesit   209 blog posts
Entry# 5866442            Tags  
possibly diverted from VZM since VSKP Palasa psgr derailed few hours back
Translate to English
Translate to Hindi
General Travel
311699 views
7

Oct 26 2023 (22:27)   12737/Gowthami SF Express (PT) | EE/Eluru (3 PFs)
SaiRBRTRailway~
SaiRBRTRailway~   3684 blog posts
Entry# 5863194            Tags   Past Edits
2 compliments
Great Great
Redevelopment of Eluru Railway Station under AmritBharatStations Scheme. Cover Over Platforms shelter foundation work currently in progress at Eluru on PF 2&3
Translate to English
Translate to Hindi

More Posts
General Travel
63643 views
5

Jul 27 2023 (12:58)   12703/Falaknuma Express (PT) | SC/Secunderabad Junction (10 PFs) | LGD/WAP-7
FalaknumaSF~
FalaknumaSF~   4438 blog posts
Entry# 5784572            Tags   Past Edits
At this point, I feel like PM of this train should be transferred to SER. There will be no need of RSA and 3 dedicated rakes will give it a higher chance of getting LHB. Not expecting a lot of improvement in maintenance though. SCR is acting so irresponsible when it comes to this train.
Translate to English
Translate to Hindi

48 Posts

38190 views
0

Jul 28 2023 (23:19)
Rail12345
Rail12345   2388 blog posts
Re# 5784572-49              
If Falaknuma Exp RSA is done with East coast Exp and PM done at SRC/PDPK, then more than 12 hrs is available for PM at SRC for both Falaknuma and East coast exp then enough time no problem
Translate to English
Translate to Hindi

37724 views
0

Jul 29 2023 (00:20)
FalaknumaSF~
FalaknumaSF~   4438 blog posts
Re# 5784572-50               Past Edits
Both sides has almost 20 hrs TAT... This will require another rake.

18046 - HYB 08:00 SHM 14:40
12703 - HWH 08:30 SC 10:10

12704
...
more...
- SC 15:55 HWH 17:40
18045 - SHM 11:25 HYB 18:25

Dedicated is completely fine. It will have 15 hrs for maintenance.

Translate to English
Translate to Hindi

35569 views
0

Jul 29 2023 (09:42)
Rail12345
Rail12345   2388 blog posts
Re# 5784572-51               Past Edits
After RSA of 12703 and 18045,
Falaknuma exp rake reaching SC at 10am will return back at at 4pm with only SM/ platform maintenance as required.
12704 reaching HWH at 6pm will return nextday as 18045 at 11.25am
This how RSA can be done and PM shifted at SRC/PDPK SER with LHB rake. Enough time for PM at SRC/PDPK
Translate to English
Translate to Hindi

35688 views
0

Jul 29 2023 (10:01)
deepak.yerr~
deepak.yerr~   6396 blog posts
Re# 5784572-52              
If PM is shifted to HWH it can be done in night. There is no need of RSA and just 3 dedicated rakes enough. HWH SC HWH is less then 3500km required for PM of ICF or LHB rake. At SC cleaning and water filling will be done.
Translate to English
Translate to Hindi

35352 views
0

Jul 29 2023 (10:04)
Rail12345
Rail12345   2388 blog posts
Re# 5784572-53              
Yes that can also be done. Falaknuma Exp dedicated rake PM at SRC/PDPK.
If RSA with East Coast Exp is done with PM of bath at SRC/PDPK SER then that is also possible.
Translate to English
Translate to Hindi
0
updating ...
1 wishes
เคถเฅเคญ เคฏเคพเคคเฅเคฐเคพ
going in MEMU as Prasanti is full

3 Posts

FmtBlog
43782 views
0

Oct 15 2023 (17:19)
_V_K_^~
_V_K_^~   60991 blog posts
Re# 5853476-4            Tags  
@SLZ   21m late
@SLZ: Solari &2 km/h xed #12703: Falaknuma Express
Translate to English
Translate to Hindi

More Posts
Page#    Showing 31 to 35 of 1250 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy