This train literally needs to be made as a daily train ASAP. In fact, it was a daily train in MG period.
It enjoys good patronage throughout the years, even though the TT is very slow. With Extra summer rush, several ICF rakes in hand and 90% of the route is having 110 MPS, SR is waiting for what? Literally losing good amount of revenue.