17027/Σ day time hwh to sbg loop chain ΣChain


Created: Oct 27 2013 (07:56) by ~

Description/Uses/Merits of this ΣChain
no day trains connecting hwh to sbg loop

24


Trip Diary

Page#    Showing 16 to 19 of 19 Trips  <<prev  
TRIP HAS ENDED.
Blog  Time-Table

7 Posts

5779 views
0

Sep 26 2014 (14:35)
Prasun_07~   3664 blog posts
Re# 1191380-8              
at /
Superb speed !

5487 views
0

Sep 26 2014 (15:59)
Prasun_07~   3664 blog posts
Re# 1191380-9              
at /
Arrived @ pf 1.

5369 views
0

Sep 26 2014 (16:03)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 1191380-10              
Too much connectivity problem ! Lunch served was OK. But coach is not well cleaned after down train run. Water is finished. Toilets still emitting foul smell.
Translate to English
Translate to Hindi

5267 views
0

Sep 26 2014 (18:34)
Prasun_07~   3664 blog posts
Re# 1191380-11              
at /
Arrived @ NFK.
Between Chatra and Murarai, vacuum pipe of power car suddenly broke and made to stand 15 mins. But no major problem occured.

4899 views
0

Sep 27 2014 (00:56)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 1191380-12               Past Edits
TRIP HAS ENDED.
Reached NJP at 23:10 hrs. Today network problem did not allow me to update.
Translate to English
Translate to Hindi
TRIP HAS ENDED.
Blog  Time-Table

28 Posts

6890 views
0

Jul 31 2014 (21:16)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 1174407-29               Past Edits
CC of our train
Loco -EOG- C7-C6-C5-C4-C3-E1-C2-C1 - EOG
Translate to English
Translate to Hindi

6848 views
0

Jul 31 2014 (21:20)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 1174407-30              
Xing with Sdah bound Darjeeling Mail
Translate to English
Translate to Hindi

6735 views
0

Jul 31 2014 (21:31)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 1174407-31               Past Edits
Electrification work in going on.
BWN - BHP = Poles erected in almost all stations, straightening of wires is going on.
BHP - Ahmadpur - Poles erected , but wires not straightened in all stations.
Ahmadpur- SNT = Sainthia fully ready !
SNT
...
more...
- RPH = Poles erected, wires hanging is going on.
RPH - Pakur = Same as in SNT - RPH section
Pakur - Nfk - Incomplete, poles erected upto Tilbhita.
Nfk - Malda = Materials stacked only.

Translate to English
Translate to Hindi

6698 views
0

Jul 31 2014 (22:56)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 1174407-32              
TRIP HAS ENDED.
Finally arrived Njp right on time, without any hassles. Nice to see it back on its scheduled time. Thank you all.
Translate to English
Translate to Hindi

6789 views
1

Jul 31 2014 (23:16)
Anupam Enosh Sarkar^~   32882 blog posts
Re# 1174407-33              
Thanks for the report. As I reside at pakur, so expected details of stations beyond rampurhat upto khana.. As much I've idea till june, rampurhat-sainthia is completed and ready to be open. Mayurakshi passenger will get electric loco.. Hope you reach your destination well.
Translate to English
Translate to Hindi
TRIP HAS ENDED.
Blog  Time-Table

55 Posts

4766 views
0

Feb 10 2014 (22:32)
MailguardSG25~
MailguardSG25~   24054 blog posts
Re# 988983-56              
no this is not Saraighat this is GHY JAT Lohit.12346 running R/T
Translate to English
Translate to Hindi

4498 views
0

Feb 10 2014 (22:53)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 988983-57               Past Edits
TRIP HAS ENDED.
Entered njp pf 2.observed ltt kyq ac exp to enter pf 1a. Bp mail standing at pf 1. Ms ghy left from pf 1a.
Translate to English
Translate to Hindi

4589 views
0

Feb 10 2014 (23:24)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 988983-58              
Could not notice it properly. But it may be 5 in total
Translate to English
Translate to Hindi

4499 views
0

Feb 10 2014 (23:27)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 988983-59              
Then i must have mistaken. It was with sguj wdp 4b, electronic boards and 5 ac coaches.
Translate to English
Translate to Hindi

4618 views
1

Feb 10 2014 (23:32)
Prasun_07~
Prasun_07~   3664 blog posts
Re# 988983-60              
Thanks all for your cooperation.
Translate to English
Translate to Hindi
TRIP HAS ENDED.
Blog  Time-Table

12646 views
0

Feb 04 2014 (14:22)
12621PrideofSR~
12621PrideofSR~   1879 blog posts
Re# 982514-1              
#racallocation from CNB to DLI in 13413 (Sleeper) is RAC 24
Translate to English
Translate to Hindi
Page#    Showing 16 to 19 of 19 Trips  <<prev  

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy