Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

There is no more pure joy than RailFanning.

Search Trains
Post PNR
Slip coach journey of Panchvalley passenger  
1 Answers
Jul 05 2017 (09:50)
Train Connections/Directions

Entry# 2019     
Ashok^~
Slip coach journey of Panchvalley passenger

★★★  General Travel
227113 views
22
Jul 04 2017 (10:03)
Blog Post# 2341504-0     
Rfchannel121~   Added by: Ashok^~  Jul 05 2017 (09:50)
The mystery slip coach that belongs to CR, wherein neither of trains with sources or destinations of train that carry it lie in CR(18238 SECR--NR 59386 SECR--WR)
Slip coach journey cycle:
The coach starts its journey with 51293(at the rake end) Nagpur Amla Passenger departing in the evening from Nagpur, continues till Amla where it is detached, In the afternoon 59395 Betul Chhindwara Passenger, which has a 95 minute halt at Amla gets its slip coach removed and this former slip coach gets attached, attachment and detachment both is done at Chhindwara end
...
more...
of rake and 59395 Betul Chhindwara Passenger continues till CWA from where the train becomes 59386 Penchvalley passenger. The slip now continues its journey till Amla PF1 where it is detached and sent to siding beside PF3, after some time 18237 Chattisgarh express arrives Amla and the slip gets attached in the front of it(Amritsar end) and continues journey till Amritsar.
In Return the 18238 Chattisgarh express brings the coach till Amla, its detached(from ASR end hence the halt time is less) and attached with 59385 Penchvalley Passenger and continues journey with it till Chhindwara and with 59396 CWA BZU pass till Betul, when the Passenger arrives Betul the slip is detached again and attached after 51254 Chhindwara Amla Passenger arrives and becomes 51294 Amla Nagpur Passenger, the coach then continues for till Nagpur for Primary Maintenance, the coaches are rotated with other trains of Nagpur Base(e.g. Sewagram express, Prerana express).
The reason being absence of Primary Maintenance at Chhindwara(might come up in future after Nagpur Chhindwara completes). The coach is running post introduction of Chattisgarh express,and after extension of Penchvalley fast passenger to Chhindwara, 7 trains carry this coach in the cycle.
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy