Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The train is a small world moving through a larger world - Niraj Kumar

Search Forum
Post PNR
Large Station Board;
Entry# 1870206-0
Large Station Board;
Entry# 5435814-0
Large Station Board;
Entry# 5435814-0

SRPN/Sripani (2 PFs)
श्रीपानी
শ্রীপানী


Track: Construction - Single-Line Electrification

Updated: Oct 05 2023 (14:40)
Show ALL Trains
Number of Platforms: 2
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
Railway Station Rd, NH 52, Gutung Kapahtali, Dhemaji, District: Dhemaji. Pin: 787110.
State: Assam
Elevation: 105 m above sea level
Type: Junction
Category: n/a
Zone: NFR/Northeast Frontier
Division: Tinsukia
No Recent News for SRPN/Sripani
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station Forum

Page#    Showing 1 to 5 of 10 blog entries  next>>
Info Update
24726 views
4

Jan 23 (23:58)   NLP/North Lakhimpur (3 PFs)
Padmakant   11004 blog posts
Entry# 5950551            Tags   Past Edits
1 compliments
Great
DRM along with ADRM and Branch Officers conducted detailed inspection in Dibrugarh-North Lakhimpur section. Engaged with dedicated staff, prioritized safety checks on LC Gates, bridges and stations. Commited to ensuring a secure rail network.
Source: DRM TSK Official X Handle
Translate to English
Translate to Hindi

More Posts
Rail Fanning
50158 views
2

Aug 03 2022 (22:41)   15908/Naharlagun - Tinsukia Express | SRPN/Sripani (2 PFs) | SGUJ/WDP-4/20012
SGUJ_20011^~
SGUJ_20011^~   10258 blog posts
Entry# 5435814            Tags   Past Edits
Sripani/SRPN Railway Station.
Translate to English
Translate to Hindi
Info Update
180820 views
2

Sep 19 2019 (21:23)   05819X/Dibrugarh - Dekargaon InterCity Special | SRPN/Sripani (2 PFs)
SAPTARSHI^~
SAPTARSHI^~   26396 blog posts
Entry# 4432655            Tags   Past Edits
New stoppage of trains
Translate to English
Translate to Hindi
Info Update
144298 views
1

Dec 23 2018 (14:52)   05812X/Gogamukh - Tangani Passenger Special (UnReserved) | GHY/Guwahati (7 PFs)
AmishKumar^~
AmishKumar^~   12525 blog posts
Entry# 4141857            Tags   Past Edits
NFR to run 4 Special train for people intending to attend inauguration ceremony of #BridgeOverBrahmaputra at Bogibeel
Translate to English
Translate to Hindi

More Posts
Info Update
51474 views
2

Apr 10 2019 (19:09)   KIR/Katihar Junction (9 PFs)
Rkj_78^~
Rkj_78^~   11956 blog posts
Entry# 4286936            Tags   Past Edits
Engineering Department of N.F. Railway has been able to raise the speed of 14 sections covering a length of 736 kms. during the financial year 2018-19. This raising of speed has led to saving of 133.47 minutes. Some important sections where the speed has been raised are as follows:
SN Name of Section Length Speed raised
(Track Km) From Kmph To Kmph
===
1
...
more...
Katihar - Kumedpur 30.00 100 110
2 Katihar - Radhikapur 53.60 100 110
3 Aluabari - Siliguri 76.00 90 100
4 Fakiragram 46.99 50 75
5 North Lakhimpur-Sripani 81.46 80 100
6 Sripani - Murkongselek 72.32 75 100
===
It is to be mentioned that trains are allowed to run over designated sections of railway track with certain permissible speed, when the permissible speed of a particular track section is raised by suitable inputs to strengthen the track structure, the trains are allowed to run at a higher speed. This result in decreasing the travel time of the trains and the net saving of time required to travel over these sections. The Engineering Department has been able to provide systematic inputs to the track which has made the achievement possible.
To this end N.F. Railway has been able to carry out a track renewal of 104 CTR units which is higher than the target stipulated by Railway Board. Almost 7.32 km of track has been deep screened by using mechanized screening arrangements while through fitting renewal has been done over a length of 402 km. In this connection as many as 4334 numbers of bridge sleepers have also been replaced by new sleepers in important bridges all over the zone. For greater safety of track, the zone has also resorted to flash butt welding of rail joints making a cumulative progress of almost 35,000 joints during the fiscal. Flash butt welding is a superior technology of welding which gives jerk free and safe welding of rails. It is also to be mentioned that in as many as 19 stations the permissible speeds in the platform lines have been raised from 15 kmph to 30 kmph leading to the saving of 57 minutes.
===
source -NFR official fb page.

Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 10 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy