Full Site Search  
Mon Jan 22, 2018 20:04:56 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Medium; Platform Pic; Large Station Board;
Medium; Platform Pic; Large Station Board;


ANND/Anand Junction (6 PFs)
આણંદ જંક્શન     आणंद जंक्शन

Track: Double Electric-Line

Type of Station: Junction
Number of Platforms: 6
Number of Halting Trains: 196
Number of Originating Trains: 24
Number of Terminating Trains: 24
Railway Station road, Ganesh chokdi, Anand - 388001
State: Gujarat
add/change address
Elevation: 45 m above sea level
Zone: WR/Western
Division: Vadodara
 
 
3 Travel Tips
No Recent News for ANND/Anand Junction
Nearby Stations in the News

Rating: 4.5/5 (35 votes)
cleanliness - excellent (6)
porters/escalators - good (3)
food - excellent (3)
transportation - good (5)
lodging - good (5)
railfanning - excellent (3)
sightseeing - excellent (5)
safety - excellent (5)

Nearby Stations

VLYN/Vallabh Vidyanagar 6 km     SNA/Sadanapura 6 km     VXD/Vadod 7 km     KRYR/Karamsad 8 km     KBRV/Kanjari Boriyavi Junction 8 km     ADD/Adas Road 11 km     BAJ/Bhalej 11 km     AGAS/Agas 13 km     UTD/Utarsanda 14 km     VTL/Vadtal Swaminarayan 14 km    

Station News

Page#    Showing 1 to 11 of 11 News Items  
Nov 11 2017 (14:15)  Amul boards Indian Railways via Twitter PTI| Nov 11, 2017, 01.17 PM (economictimes.indiatimes.com)
back to top
Other News

News Entry# 322508     
   Past Edits
Nov 11 2017 (14:15)
Station Tag: Palanpur Junction/PNU added by sudhir/159998

Nov 11 2017 (14:15)
Station Tag: Anand Junction/ANND added by sudhir/159998
Posted by: sudhir~  235 news posts
 
 
NEW DELHI: Nearly a month after dairy giant Amul approached the Indian Railways on its official Twitter handle with a business proposition to use refrigerated parcel vans to transport butter across India, the first shipment is on its way.
"First refrigerator van with 17 MT #Amul butter being flagged off from Palanpur to Delhi with our milk train. Thanks @RailMinIndia for the prompt action," Amul tweeted .
Read more at:
//eco ..
...
more...

Read more at:
//economictimes.indiatimes.com/articleshow/61604849.cms?utm_source=contentofinterest&utm_medium=text&utm_campaign=cppst
Sep 11 2017 (23:11)  14 सितंबर को PM मोदी और अबे रखेंगे बुलेट ट्रेन आधारशिला (www.totaltraininfo.com)
back to top
New Facilities/TechnologyWR/Western  -  

News Entry# 315810     
   Past Edits
Sep 11 2017 (23:11)
Station Tag: Anand Junction/ANND added by rks1975/1508746

Sep 11 2017 (23:11)
Station Tag: Vadodara Junction/BRC added by rks1975/1508746

Sep 11 2017 (23:11)
Station Tag: Mumbai CSM Terminus/CSTM added by rks1975/1508746

Sep 11 2017 (23:11)
Station Tag: Surat/ST added by rks1975/1508746

Sep 11 2017 (23:11)
Station Tag: Ahmedabad Junction/ADI added by rks1975/1508746

Sep 11 2017 (23:11)
Station Tag: Sabarmati Junction/SBI added by rks1975/1508746
Posted by: rks1975  70 news posts
 
 
14 सितंबर को बुलेट ट्रेन प्रोजेक्ट की बुनियाद रखी जाएगी। प्रधानमंत्री नरेंद्र मोदी और जापान के प्रधानमंत्री शिंजो अबे की उपस्थिति में गुजरात के साबरमती में प्रोजेक्ट का शिलान्यास किया जाएगा।
रेल मंत्रालय ने इसे समय से पहले 15 अगस्त 2022 तक पूरा करने का लक्ष्य रखा है। यह ट्रेन साबरमती से मुंबई के बीच 508 किमी. लंबी लाइन पर दौड़ेगी, जिसमें से 156 किमी. महाराष्ट्र में, 351 किमी. गुजरात में और 2 किमी. दादर-नागर हवेली में होगा।
साबरमती से मुंबई के बीच 12 स्टेशनों पर यह ट्रेन रुकेगी। रास्ते में ट्रेन 21
...
more...
किमी. टनल में चलेगी। इस रेल खंड पर मुंबई, ठाणे, विरार, ब्यास, वापी, विलमूरा, सूरत, भरुच, वडोदरा, आणंद, अहमदाबाद और साबरमती समेत 12 स्टेशन होंगे।
Jun 01 2017 (13:15)  Bhoomi pujan of bullet train likely in Sept (epaperbeta.timesofindia.com)
back to top
New Facilities/TechnologyWR/Western  -  

News Entry# 304114   Blog Entry# 2302747     
   Past Edits
Jun 01 2017 (13:15)
Station Tag: Ahmedabad Junction/ADI added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Anand Junction/ANND added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Vadodara Junction/BRC added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Bharuch Junction/BH added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Surat/ST added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Dahanu Road/DRD added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Valsad/BL added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Vapi/VAPI added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Virar/VR added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Thane/TNA added by Jagdeesh Srivastava~/558137

Jun 01 2017 (13:15)
Station Tag: Mumbai Central/BCT added by Jagdeesh Srivastava~/558137
 
 
Mumbai:


Event May Be In Guj; Japanese PM To Be In India
The foundation stone-laying ceremony of the Mumbai-Ahmedabad bullet train is likely in September when Japanese Prime Minister Shinzo Abe is scheduled
...
more...
to visit India.
The train is expected to co The train is expected to co ver 508km in about two hours, running at a maximum speed of 350kmph and operating speed of 320kmph. Railways hope to complete the project by December 2023.
A senior official said, “As per the tentative programme, the bhoomi pujan will be done at the hands of Prime Minister Narendra Modi and the Japanese PM. The event is most likely to be held in Gujarat.“
An India-Japan joint statement issued during Modi's visit in November 2016 had stated, “The two Prime Ministers recognised the importance of accelerating the Mumbai-Ahmedabad High Speed Rail (MAHSR) project by holding the groundbreaking ceremony in 2017.“
Estimated to cost Rs 97,636 crore, 81% funding for it will come by way of a loan from Japan.The estimate includes possible cost-escalation, interest during construction and import duties. It is a soft loan for 50 years at 0.1% annual interest with a 15-year moratorium.
An official said, “This is show-piece project and the government will definitely want to show progress on the project to the people of Gujarat.“

9 posts - Thu Jun 01, 2017 - are hidden. Click to open.

4282 views
Jun 09 2017 (17:44)
ritzraj   641 blog posts
Re# 2302747-10            Tags   Past Edits
the route will be elevated. hence stations should ideally be elevated without interfering with the existing tracks.
as far as stops at virar and dahanu is concerned, I think these are well thought of. Today the suburban network on western line stretches upto dahanu with population increasing here exponentially.
Today if a person wants to go to virar from bkc by ola or meru, you will have to shell out a minimum of Rs. 1200 and would take a minimum of 90 minutes.
If
...
more...
he is given a option to cover this distance in 20 minutes for Rs. 400, will he not opt for it. He will grab it with both hands.

4186 views
Jun 09 2017 (18:34)
12165 Ratnagiri Superfast Express~   2477 blog posts   15 correct pred (58% accurate)
Re# 2302747-11            Tags   Past Edits
eleveted rahega to acha rahega and wo local train se bhi ja sakta hai virar

4316 views
Jun 09 2017 (18:44)
Awes Khan*^~   50616 blog posts   2185 correct pred (78% accurate)
Re# 2302747-12            Tags   Past Edits
An official said, “This is show-piece project and the government will definitely want to show progress on the project to the people of Gujarat.“
In India only Gujarat state is important. Other state people should not think about any development.

4378 views
Jun 09 2017 (19:18)
Guest: 71f56568   show all posts
Re# 2302747-13            Tags   Past Edits
First Mumbai Ahmedabad High speed bullet trains projects will be taken & then Ahmedabad Delhi via important cities of Madhya Pradesh & Rajasthan.
High speed bullet trains also proposed in golden quadrilateral routes like Mumbai-Delhi, Delhi-Howra, Howra-Chennai, Chennai-Mumbai, Chennai-Delhi, Mumbai-Howra routes survey are completed by Japan, Spanish, China, France.

4103 views
Jun 09 2017 (21:54)
Pollster   1006 blog posts
Re# 2302747-14            Tags   Past Edits
It's a totally unwanted project. That money could have been used for completing other pending projects. IR too will spend loads of money for this apart from the loan - for the land acquisition etc....
In response to Hon’ble Prime Minister’s clarion call for innovation in Indian Railways under the Navrachna Initiative, Indian Railways has decided to conduct a public competition for ‘New Idea/ Suggestion to improve the working of Indian Railways’.
~Description of Innovation Challenge
~Broad Considerations in the Idea/Suggestion
~Entry Submission Fields
~Guidelines
...
more...
and Terms & Conditions
~Evaluation Criteria
"सबसे ज्यादा Innovation Challenge for ‘New Idea/ Suggestion to improve the working of Indian Railways’ के लिए Total 1898 Submissions मिला है .
हालाँकि सुझाव देने की तारिख निकल चुकी है लेकिन आज तक इस लिंक को किसी ने भी IRI par पोस्ट नहीं किया है.
इसलिए आज मै पोस्ट कर रहा हूँ."
Jan 10 2017 (21:38)  WR TO RUN BANDRA (T)-AHMEDABAD SUPERFAST SPECIAL TRAIN o­n MAKAR SANKRANTI (www.wr.indianrailways.gov.in)
back to top
New/Special TrainsWR/Western  -  IR Press Release  

News Entry# 290947     
   Past Edits
Jan 10 2017 (21:38)
Station Tag: Nadiad Junction/ND added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Station Tag: Anand Junction/ANND added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Station Tag: Vadodara Junction/BRC added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Station Tag: Bharuch Junction/BH added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Station Tag: Surat/ST added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Station Tag: Vapi/VAPI added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Station Tag: Bandra Terminus/BDTS added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Station Tag: Ahmedabad Junction/ADI added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Train Tag: Bandra Terminus Ahmedabad Weekly SF Special/09029 added by iyerjiteshp/120749

Jan 10 2017 (21:38)
Train Tag: Ahmedabad - Bandra Terminus Weekly SF Special/09030 added by iyerjiteshp/120749
 
 
2017/01 10-01-2017
Mumbai
WR TO RUN BANDRA (T)-AHMEDABAD SUPERFAST SPECIAL TRAIN ON MAKAR SANKRANTI
WR TO RUN BANDRA (T)-AHMEDABAD SUPERFAST
SPECIAL TRAIN o­n MAKAR SANKRANTI
...
more...
For the convenience of passengers during the festive occasion of Makar Sankranti and with a view to meet the travel demand during the season, Western Railway will run o­ne trip of Bandra (T)–Ahmedabad Superfast Special train o­n special fare o­n 14th January, 2017.
·09029/09030 Bandra (T)-Ahmedabad Superfast Special (2 Trips)
Train No. 09029 Bandra (T)–Ahmedabad Superfast Special train will leave Bandra (T) at 00.20 hrs o­n Saturday, 14th January, 2017 and reach Ahmedabad at 08.25 hrs, the same day. This train will run for o­ne day i.e 14th January, 2017 o­nly.
In return direction Train No. 09030 Ahmedabad –Bandra (T) Superfast Special train will leave Ahmedabad at 21.50 hrs o­n Saturday, 14thJanuary, 2017 and will arrive Bandra (T) at 06.15 hrs, the next day. This train will run for o­ne day i.e 14th January, 2017 o­nly.
This train will halt at Borivali, Vapi, Surat, Bharuch, Vadodara, Anand and Nadiad stations in both the directions.
The train will have AC II Tier, AC III Tier, Sleeper Class & II Class General coaches.
The booking for Train No. 09029/09030 Bandra (T)–Ahmedabad-Bandra (T) Superfast Special will be opened from 12th January, 2017 at all PRS counters and IRCTC website.
Page#    Showing 1 to 11 of 11 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.