Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

चलती है (ग्वालियर-भोपाल वाया गुना बीना ICE) उड़ती है धूल जलते है दुश्मन खिलते है फूल - Adi Singh

Timeline of all Site Edits
Filters:
 
 
 
Page#    3 Timeline Updates  

HarshaI22159^~
Oct 10 2023 (23:14)
Fixed locos not to be attached in regular trains.
Oct 10 2023 (23:12)   Lucknow - New Delhi AC SF Express/12429   Train - Loco
Entry# 6107166   Blog Entry# 5849704  
by: sajal194~   4 Conf TLs   3 Void TLs
Attach: GZB/WAP-7/32401 LKO/Lucknow Charbagh NR->NDLS/New Delhi

Aug 18 2023 (06:08)   (previous value)
Entry# 5998334
by: Imposter^~
Attach: TKD/WDP-4D/Twins LKO/Lucknow Charbagh NR->NDLS/New Delhi

1487 views
0

Oct 10 2023 (23:14)
HarshaI22159^~
HarshaI22159^~   10173 blog posts
Re# 5849704-1              
Fixed locos not to be attached in regular trains.
Translate to English
Translate to Hindi

Imposter^~
Jul 26 2023 (18:15)
Incorrect
Jul 26 2023 (15:59)   Gorakhdham SF Express (PT)/12555   Train - Rake/Coach Composition
Entry# 5953003   Blog Entry# 5783957  
by: sajal194~   4 Conf TLs   3 Void TLs
LHB Rake; LOCO-EOG-GEN-GEN-GEN-SLR-S1-S2-S3-S4-A2-A1-H1-B10-B9-B8-B7-B6-B5-B4-B3-B2-B1-SLR
Rake Notes: Rake Standardization till Bhiwani

Jun 16 2023 (15:47)   (previous value)
Entry# 5876643
by: ArmyRF^~
LHB Rake; LOCO-EOG-B1-B2-B3-B4-B5-B6-B7-B8-B9-B10-H1-A1-A2-S1-S2-S3-S4-GEN-GEN-GEN-SLR
Rake Notes:

1667 views
0

Jul 26 2023 (18:15)
Imposter^~
Imposter^~   25840 blog posts
Re# 5783957-1              
Incorrect
Translate to English
Translate to Hindi

Brandon12663^~
Jul 25 2023 (10:09)
No SLR is added in between the coaches
Jul 25 2023 (08:29)   Gorakhdham SF Express (PT)/12555   Train - Rake/Coach Composition
Entry# 5949921   Blog Entry# 5782906  
by: sajal194~   4 Conf TLs   3 Void TLs
LHB Rake; LOCO-SLR-GEN-GEN-GEN-SLR-S1-S2-S3-S4-A2-A1-H1-B10-B9-B8-B7-B6-B5-B4-B3-B2-B1-EOG
Rake Notes:

Jun 16 2023 (15:47)   (previous value)
Entry# 5876643
by: ArmyRF^~
LHB Rake; LOCO-EOG-B1-B2-B3-B4-B5-B6-B7-B8-B9-B10-H1-A1-A2-S1-S2-S3-S4-GEN-GEN-GEN-SLR
Rake Notes:

1452 views
0

Jul 25 2023 (10:09)
Brandon12663^~
Brandon12663^~   35624 blog posts
Re# 5782906-1              
No SLR is added in between the coaches
Translate to English
Translate to Hindi
Page#    3 Timeline Updates  

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy