Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Shan-e-Bhopal - तेरी खूबसूरती से नजर नही हटती, नजारे हम क्या देखें - ललितपुरी रेलफैन

Search Trains
Post PNR


Side View; Large TB; EOG/SLR; Standing at Station;
Entry# 3063917-0
Medium; Small TB;
Entry# 3305214-0


Availability Calendar
Search SC to TPTY
Return# 12731
PDF Download

12732/Secunderabad - Tirupati SF Express (PT)
सिकंदराबाद - तिरुपति सुपरफास्ट एक्सप्रेस

SC/Secunderabad Junction --> TPTY/Tirupati

Updated: May 06 (16:49) by aktiv~
May 06 (16:49)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between SC and TPTY is 156 km (19%) shorter.
Travel Time: 14h 10m     13 halts
Distance: 800 km     Avg Speed: 56 km/hr
Max Permissible Speed: 110 km/hr between LPI/Lingampalli and DMM/Dharmavaram Junction
Departs @ 16:15
Secunderabad Junction/SC 
Platform# 5
 
 
 
Wed
 
 
Sat
Arrives @ 06:25 +1 night
TPTY/Tirupati 
Platform# --
Sun
 
 
 
Thu
 
 
Type: SuperFast
Rake Zone: SCR/South Central


Latest News
(You need to double-check/verify this info yourself)
Train No. 12732 Secunderabad - Tirupati Express scheduled to depart Secunderabad at 16.15 hrs on 20.07.2024 is rescheduled to depart at 18.15 hrs on the same day
Sat Jul 20, 2024 (04:43PM)
News History
Due to commissioning of double line between Chigicherla - Dharmavaram stations of Guntakal Division, trn num 12732 from Secunderabad to Tirupati will be diverted via Sulehalli - Gooty - Renigunta - Tirupati on journey commencing on 18.02.2023.
Wed Feb 15, 2023 (06:39PM)
Train No. 12732 Secunderabad - Tirupati Express scheduled to depart Secunderabad at 16.15 hrs today i.e., 24.08.2022 is rescheduled to depart at 17.15 hrs on the same day,due to late running of its pairing train
Wed Aug 24, 2022 (04:30PM)
Train No. 12732 Secunderabad - Tirupati Express scheduled to depart Secunderabad at 16.15 hrs today i.e., 17.08.2022 is rescheduled to depart 18.00 hrs on the same day due to late running of its pairing train
Wed Aug 17, 2022 (03:51PM)
TRAIN NO.12732 SECUNDERABAD - TIRUPATI EXPRESS JCO 29.01.2022 IS RESCHEDULED TO DEPART AT 23.00 hrs ON 29.01.2022 (INSTEAD OF ITS SCH. DEP. AT 16.15 HRS OF 29.01.2022)
Sat Jan 29, 2022 (06:25PM)
📢⚟ JCF 28/08/2021 DL1-DL2 Would Act As UR Coach ▪️CC:- 2AC—1, 3AC—4 SL—13, PC—1(Locked), 2S—2, SLR/D—2▪️
Mon Aug 23, 2021 (10:11PM)
1 Follows
Rating: 4.0/5 (44 votes)
cleanliness - good (8)
punctuality - good (7)
food - good (7)
ticket avbl - excellent (8)
u/r coach - good (5)
railfanning - good (7)
safety - good (7)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Wed Jan 26, 2011
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
Pantry Car Remains Locked
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 UR
  3
 H1
  4
 A1
  5
 B1
  6
 B2
  7
 B3
  8
 B4
  9
 S1
 18
 S9
 17
 S8
 16
 S7
 15
 S6
 14
 S5
 13
 S4
 12
 S3
 11
 S2
 10
 PC
 19
S10
 20
S11
 21
S12
 22
 UR
 23
SLR
PC Remains Locked
CC changes for every run because of the RSA. Re-check at the station for accurate CC
Order 2- LOCO SLR GS S12 S11 S10 S9 S8 S7 S6 S5 S4 S3 S2 PC S1 B4 B3 B2 B1 A1 H1 GS SLR


Show ALL intermediate Stations

13 halts. 109 intermediate Stations between Secunderabad Junction and Tirupati
#1
0.0 km
/==/
Zone: SCR
PF# 5
Speed: 75
Elev: 536m

16:15
Day: 1
72.1 km
20 intermediate stations
00:58
#2
72.1 km
/==/
Zone: SCR
PF# 2
Speed: 64
Elev: 626m
17:13
17:15
Day: 1
218.1 km
27 intermediate stations
03:23
#3
290.2 km
/==/
Zone: SCR
PF# 1
Speed: 77
Elev: 407m
20:38
20:40
Day: 1
69.6 km
8 intermediate stations
00:54
#4
359.8 km
/==/
Zone: SCR
Speed: 45
Elev: 421m
21:34
21:35
Day: 1
52.1 km
6 intermediate stations
01:10
#5
411.9 km
/==/
Zone: SCR
Speed: 44
Elev: 451m
22:45
22:50
Day: 1
Remote location quota starting & charting station.
28.4 km
3 intermediate stations
00:39
#6
440.3 km
/==/
Zone: SCR
PF# 1
Speed: 59
Elev: 365m
23:29
23:30
Day: 1
57.1 km
8 intermediate stations
00:58
#7
497.5 km
/==/
Zone: SCR
PF# 4
Speed: 42
Elev: 342m
00:28
00:30
Day: 2
33.3 km
3 intermediate stations
00:48
#8
530.8 km
/==/
Zone: SCR
Speed: 69
Elev: 357m
01:18
01:20
Day: 2
67.5 km
5 intermediate stations
00:59
#9
598.2 km
/--/
Zone: SCR
Speed: 77
02:19
02:20
Day: 2
37.3 km
3 intermediate stations
00:29
#10
635.5 km
/--/
Zone: SCR
Speed: 83
Elev: 594m
02:49
02:50
Day: 2
40.1 km
3 intermediate stations
00:29
#11
675.7 km
/--/
Zone: SCR
Speed: 57
03:19
03:20
Day: 2
27.7 km
1 intermediate stations
00:29
#12
703.3 km
/--/
Zone: SCR
Speed: 45
03:49
03:50
Day: 2
14.3 km
0 intermediate stations
00:19
#13
717.6 km
/--/
Zone: SCR
Speed: 50
04:09
04:10
Day: 2
40.8 km
4 intermediate stations
00:49
#14
758.4 km
/--/
Zone: SCR
Speed: 30
04:59
05:00
Day: 2
41.9 km
5 intermediate stations
01:25
#15
800.3 km
/==/
Zone: SCR

Elev: 163m
06:25

Day: 2


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy