FmT LIVE - Follow my Trip with me... LIVEसंपूर्ण क्रान्ति है तो जहां है
Close-up; Side View; Large TB; EOG/SLR; Outside of Train;
17204⇒12755/Kakinada Port - Bhavnagar Terminus Superfast Express (PT) కాకినాడ పోర్ట్ - భావనగర్ టెర్మినస్ సూపర్ఫాస్ట్ ఎక్స్ప్రెస్ काकिनाडा पोर्ट - भावनगर टर्मिनस सुपरफास्ट एक्सप्रेस
Dec 25 2021 (08:58)
Travel Time:
37h 25m 29 halts Distance: 2047 km Avg Speed: 55 km/hr Max Permissible Speed: 110 km/hr
Type: SuperFast
Rake Zone: SCR/South Central
Latest News (You need to double-check/verify this info yourself) Run With Electric Loco From 2-06-2022 KakinadaPort To Ahmedabad Ahmedabad To Bhavnagar DieselMon May 30, 2022 (12:04PM)
News History Run With Electric Loco From 2-06-2022 KakinadaPort To Ahmedabad Ahmedabad To Bavnagar DieselMon May 30, 2022 (08:55AM)
Train No. 02699 (old -07204) Kakinada Port – Bhavnagar Superfast Express with effect from 04.11.2021Sun Oct 31, 2021 (09:13AM)
Rating: 3.3 /5 (57 votes)
cleanliness - average (10)
Inaugural Run Thu Jul 06, 2006
Pantry/Catering ✕ Pantry Car
✓ On-board Catering ✓ E-Catering
ICF-CBC Rake
Rake/Coach Position
Time-Table has Changed.
Show Changes Departure Time Changed. Arrival Time Changed. Speeded up by: 2h 35m. 29 halts. 376 intermediate Stations between Kakinada Port and Bhavnagar Terminus
1.8 km
1 intermediate stations
00:03
12.4 km
2 intermediate stations
00:06
50.1 km
9 intermediate stations
00:42
148.9 km
30 intermediate stations
02:18
31.9 km
6 intermediate stations
00:40
Remote Location Starting and Charting station
42.4 km
7 intermediate stations
00:39
52.8 km
9 intermediate stations
00:42
38.4 km
5 intermediate stations
00:29
37.6 km
3 intermediate stations
00:27
109.8 km
15 intermediate stations
02:54
72.1 km
20 intermediate stations
01:14
42.0 km
4 intermediate stations
00:34
33.2 km
3 intermediate stations
00:24
37.4 km
4 intermediate stations
01:00
36.8 km
3 intermediate stations
00:38
113.0 km
15 intermediate stations
02:15
187.0 km
22 intermediate stations
03:00
75.5 km
15 intermediate stations
01:50
63.7 km
17 intermediate stations
01:08
74.4 km
15 intermediate stations
01:22
41.7 km
10 intermediate stations
01:05
147.1 km
22 intermediate stations
02:10
68.9 km
14 intermediate stations
00:54
129.7 km
25 intermediate stations
01:42
96.7 km
22 intermediate stations
01:40
3.4 km
2 intermediate stations
00:06
Loco Change Electric To Diesel
65.2 km
14 intermediate stations
01:07
65.5 km
12 intermediate stations
01:03
75.2 km
7 intermediate stations
00:53
92.3 km
14 intermediate stations
02:27
Scroll to Top
Scroll to Bottom