DC Line - ये आग का दरिया पार कर पाना नहीं था आसान ...पर धनबादवासियों के इरादे हैं चट्टान.... चलाकर रहेंगे इसपर रेल गाड़ी महान... - Niket Karan
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
IMG65872-821805/♥♥Shalimar-Ernakulam Weekly AC Duronto Exp♥♥
Travel Time:
47h 20m 10 halts Distance: 3184 km Avg Speed: 67 km/hr Max Permissible Speed: n/a
Type: Duronto
Rake Zone: ???/???
Practical - Will be Popular for Tourism
Bedroll/Linen :
Don't know change
Pantry/Catering ✓ Pantry Car ✓ On-board Catering
✕ E-Catering
LHB Rake
Rake/Coach Position
10 halts. 487 intermediate Stations between Shalimar (Kolkata) and Ernakulam Junction (South)
246.2 km
53 intermediate stations
03:00
468.3 km
69 intermediate stations
05:55
410.7 km
66 intermediate stations
05:50
392.5 km
59 intermediate stations
04:15
307.7 km
38 intermediate stations
04:05
Technical Halt Loco Changes From Electric To Diesel
115.8 km
28 intermediate stations
03:20
Technical Halt Loco Changes From Electric To Diesel
278.2 km
30 intermediate stations
05:05
236.1 km
22 intermediate stations
02:50
313.2 km
33 intermediate stations
04:25
222.3 km
42 intermediate stations
03:25
193.3 km
37 intermediate stations
03:45
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.