• Change in Terminating Station on Permanent Basis from Secunderabad to Lingampalli WEF 15.12.2023. • Revised Coach Composition - AC I Tier - 1, AC II Tier - 2, AC III Tier - 5, AC III Tier Economy - 2, Sleeper Class - 7, General Class - 2 & EOG...
more... - 2 = Total 21 LHB Coaches WEF 15.12.2023 Ex CSTM.
Tue Dec 12, 2023 (11:29PM)
• Change in Terminating Station on Permanent Basis from Secunderabad to Lingampalli WEF 15.12.2023. • Revised Coach Composition: AC I Tier - 1, AC II Tier - 2, AC III Tier - 5, AC III Tier Economy - 2, Sleeper Class - 7, General Class - 2 & EOG...
more... - 2 = Total 21 LHB Coaches WEF 14.12.2023 Ex CSTM.
Tue Dec 12, 2023 (09:03PM)
Change in composition w.e.f. 14.12.2023 ex Secunderabad and w.e.f. 15.12.2023 ex Mumbai CSMT. New composition: 1 First AC, 2 AC two tier, 5 AC three tier, 2 AC three tier economy, 7 sleeper, 2 General and 2 EOG.
Sat Aug 19, 2023 (08:53AM)
Railways has decided to convert the conventional ICF rake of Chhatrapati Shivaji Maharaj Terminus - Secunderabad Devgiri Express into LHB rake. The details are as under: 17057 Chhatrapati Shivaji Maharaj Terminus - Secunderabad Devagiri Express w.e.f. 14.2.2023. Revised Composition: One First AC, Two AC-2 Tier, 5 AC-3 Tier, 9 Sleeper...
more... Class, Two General Second Class, Two Generator Vans.
Fri Feb 03, 2023 (01:11PM)
Run with LHB coachs from 14/03/23 CC Sleeper 09 Coaches, First AC 01coache 2 tier 02 coaches, AC 3 tier 05 Coaches, General 02 Coaches, SLRD 01,Eog 01, Total 21coache
Tue Jan 31, 2023 (07:45PM)
Train is Cancelled on 20.11.2022.
Fri Nov 11, 2022 (02:26PM)
▪️CC:- 1AC—1, 2AC—2, 3AC—3 SL—10, 2S—3, SLR/D—2▪️ 📢 Due to track maintenance work between Kalyan-Kasara, Khadavli-Vasind and Asangaon-Atgaon stations, Train no. 07057 on JCO 02.05.2021 will remain fully cancelled...
Fri Apr 30, 2021 (03:34AM)