Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

FmT LIVE - Follow my Trip with me... LIVE

RailFanning is a gift you give yourself. - Varun

Search Trains
Post PNR
Large TB; EOG/SLR; Outside of Train;
Entry# 5223943-0
Small TB; Sleeper; Outside of Train;
Entry# 5327081-0
Availability Calendar
Search AGTL to FZR
Return# 14620
PDF Download

14019⇒14619/Tripura Sundari Express (PT)
ত্রিপুরা সুন্দরী এক্সপ্রেস     त्रिपुरा सुंदरी एक्सप्रेस

AGTL/Agartala --> FZR/Firozpur Cantt. Junction

Updated: Jul 16 (12:36) by AbhishekVivek^~
Jul 16 (12:36)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between AGTL and FZR is 163 km (6%) shorter.
Travel Time: 55h 40m     30 halts
Distance: 2897 km     Avg Speed: 52 km/hr
Max Permissible Speed: 130 km/hr between NEO/Neora and CPYZ/Chipyana Buzurg
Departs @ 15:00
Agartala/AGTL 
Platform# 1
 
 
 
 
Thu
 
 
Arrives @ 22:40 +2 nights
FZR/Firozpur Cantt Jn 
Platform# --
 
 
 
 
 
 
Sat
Type: Mail/Express
Rake Zone: NR/Northern
Latest News
(You need to double-check/verify this info yourself)
Services resumed from 28/07/2022.
Sat Jul 16, 2022 (12:35PM)
News History
Cancelled Till 14 July 2022 Due To Assam Floods.
Sun Jul 03, 2022 (08:01PM)
➡️ दिनांक 07 जुलाई, 2022 को अगरतला से खुलने वाली गाड़ी संख्या 14619 अगरतला-फिरोजपुर त्रिपुरा सुंदरी एक्सप्रेस को पं.दीन दयाल उपाध्याय जं.-लखनऊ-मुरादाबाद-गाजियाबाद के रास्ते चलायी जायेगी।
Wed Jun 15, 2022 (10:21PM)
Train Will Remain Cancelled Till 30th June Due To Restoration Work Going On After Flood In Assam.
Fri Jun 03, 2022 (10:24PM)
JCO 24.02.2022 will remain cancelled due to NI work in RNY division of NF railway for commissioning of double line.
Wed Feb 23, 2022 (03:40PM)
JCO 24.02.2022 will remain cancelled due to NI work in RNY division of NF railway for commissioning of double line.
Wed Feb 23, 2022 (03:40PM)
JCO 13.01.2022 diverted via NCB - MHBA - YSLC - RQJ
Fri Jan 14, 2022 (09:16AM)
-
Sat Dec 25, 2021 (10:34AM)
▣ Coach Composition ▸ 2A—2, 3A—6, PC—1, SL—7, 2S—4, EOG—2 ▣
Wed Aug 18, 2021 (02:59PM)
0 Follows
Rating: 3.7/5 (72 votes)
cleanliness - good (13)
punctuality - average (15)
food - good (11)
ticket avbl - good (11)
u/r coach - good (13)
railfanning - excellent (11)
safety - good (11)
Inaugural Run
Sun Jul 31, 2016
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is Available at BPB, NJP, KIR, PPTA, CNB, NDLS, ROK,...
more...
BNW, HSR, SSA, BTI & FZR
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
GEN
  3
GEN
  4
 A2
  5
 A1
  6
 B6
  7
 B5
  8
 B4
  9
 B3
 18
 S2
 17
 S3
 16
 S4
 15
 S5
 14
 S6
 13
 S7
 12
 PC
 11
 B1
 10
 B2
 19
 S1
 20
GEN
 21
GEN
 22
EOG
 BNW
RSA - Rake Sharing
No RSA • 01 Rake • PM @ FZR • SM @ AGTL

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
Destination Station Changed.
30 halts. 472 intermediate Stations between Agartala and Firozpur Cantt. Junction
#1
0.0 km
|--|
Zone: NFR
PF# 1
Speed: 74

15:00
Day: 1
66.9 km
4 intermediate stations
00:54
#2
66.9 km
|--|
Zone: NFR
PF# 1
Speed: 62
Elev: 90m
15:54
15:56
Day: 1
72.5 km
7 intermediate stations
01:10
#3
139.4 km
|--|
Zone: NFR
Speed: 61
Elev: 30m
17:06
17:08
Day: 1
34.5 km
6 intermediate stations
00:34
#4
173.9 km
|--|
Zone: NFR
PF#: 1
Speed: 45
Elev: 27m
17:42
17:44
Day: 1
29.9 km
6 intermediate stations
00:40
#5
203.8 km
|--|
Zone: NFR
PF# 1
Speed: 16
18:24
18:26
Day: 1
17.3 km
3 intermediate stations
01:04
#6
221.2 km
|--|
Zone: NFR
Speed: 37
19:30
19:40
Day: 1
Remote Location Quota Starting and Charting Station.
71.0 km
9 intermediate stations
01:56
#7
292.2 km
|--|
Zone: NFR
PF# 1
Speed: 31
Elev: 446m
21:36
21:41
Day: 1
98.0 km
16 intermediate stations
03:09
#8
390.2 km
|--|
Zone: NFR
Speed: 42
00:50
01:05
Day: 2
Loco Reversal (rake reversal - the train reverses direction)
Remote Location Quota Starting and Charting Station.
45.0 km
5 intermediate stations
01:04
#9
435.2 km
%==%
Zone: NFR
PF# 1
Speed: 63
02:09
02:11
Day: 2
78.6 km
9 intermediate stations
01:15
#10
513.8 km
!%%!%
Zone: NFR
PF# 1
Speed: 25
03:26
03:28
Day: 2
57.0 km
11 intermediate stations
02:17
#11
570.7 km
/==/
Zone: NFR
PF# 3
Speed: 56
Elev: 59m
05:45
06:00
Day: 2
Remote Location Quota Starting and Charting Station.
Xing with 12507/Aronai Express | Fri
182.3 km
18 intermediate stations
03:28
#12
753.0 km
/==/
Zone: NFR
PF# 1A,1B
Speed: 72
09:28
09:30
Day: 2
125.2 km
16 intermediate stations
01:45
#13
878.3 km
/==/
Zone: NFR
Speed: 79
11:15
11:40
Day: 2
Technical Halt Loco changes from diesel to electric
125.5 km
17 intermediate stations
01:35
#14
1003.8 km
/==/
Zone: NFR
PF# 3,5
Speed: 61
Elev: 114m
13:15
13:25
Day: 2
Remote Location Quota Starting and Charting Station.
183.8 km
34 intermediate stations
03:00
#15
1187.6 km
/==/
Zone: NFR
PF# 5
Speed: 52
16:25
16:35
Day: 2
181.0 km
31 intermediate stations
03:30
#16
1368.6 km
/==/
Zone: ECR
PF# 5
Speed: 46
20:05
20:15
Day: 2
108.2 km
25 intermediate stations
02:20
#17
1476.7 km
%==%
Zone: ECR
PF# 1,2
Speed: 66
Elev: 53m
22:35
22:45
Day: 2
207.6 km
49 intermediate stations
03:10
#18
1684.3 km
/==/
Zone: ECR
PF# 6
Speed: 80
01:55
02:05
Day: 3
152.6 km
21 intermediate stations
01:55
#19
1837.0 km
/==/
Zone: NCR
PF# 1
Speed: 86
04:00
04:10
Day: 3
194.5 km
29 intermediate stations
02:15
#20
2031.4 km
/==/
Zone: NCR
PF# 1
Speed: 72
Elev: 129m
06:25
06:30
Day: 3
440.2 km
68 intermediate stations
06:05
#21
2471.7 km
/==/
Zone: NR
Speed: 28
Elev: 216m
12:35
12:50
Day: 3
Xing with 12716/Sachkhand Express | Sat
11.5 km
6 intermediate stations
00:25
#22
2483.2 km
/==/
Zone: NR
Speed: 66
Elev: 217m
13:15
13:17
Day: 3
59.6 km
11 intermediate stations
00:54
#23
2542.8 km
/==/
Zone: NR
PF# 2
Speed: 52
14:11
14:13
Day: 3
49.3 km
6 intermediate stations
00:57
#24
2592.1 km
/--/
Zone: NWR
PF# 1
Speed: 48
15:10
15:35
Day: 3
Loco Reversal (rake reversal - the train reverses direction)
Loco Change From Electric to Diesel
59.9 km
8 intermediate stations
01:15
#25
2652.0 km
/--/
Zone: NWR
Speed: 65
16:50
16:55
Day: 3
29.1 km
2 intermediate stations
00:27
#26
2681.1 km
/--/
Zone: NWR
PF#: 1
Speed: 62
Elev: 211m
17:22
17:24
Day: 3
52.9 km
7 intermediate stations
00:51
#27
2733.9 km
/--/
Zone: NWR
PF# 1
Speed: 74
Elev: 203m
18:15
18:20
Day: 3
33.4 km
2 intermediate stations
00:27
#28
2767.4 km
/--/
Zone: NWR
PF#: 1
Speed: 25
Elev: 205m
18:47
18:49
Day: 3
42.2 km
7 intermediate stations
01:41
#29
2809.6 km
/--/
Zone: NR
Speed: 67
20:30
20:45
Day: 3
42.6 km
5 intermediate stations
00:38
#30
2852.2 km
%--%
Zone: NR
Speed: 51
21:23
21:25
Day: 3
12.9 km
1 intermediate stations
00:15
#31
2865.1 km
%--%
Zone: NR
Speed: 33
Elev: 204m
21:40
21:42
Day: 3
32.2 km
3 intermediate stations
00:58
#32
2897.3 km
%--%
Zone: NR

22:40

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy