Only poles have been erected between GIMB to SIOB. Beyond SIOB to VG, even poles are not there. In fact even doubling is pending and as of now, no work is happening on doubling Between SIOB to CHULI
By road I'm travelling almost every 15-20 days between GIMB and ADI. The road over bridge at VG-DHG side near DHG has no signs of poles erection as of 18th Nov 2020. May be work has been started from VG side, which I'm not aware.
I don't know about SIOB-DHG stretch but I have seen OHE poles erected in stretches between DHG-VG from VG side. Btw i travelled by train between ADI-GIMB by 02974 on 9th Nov.
ट्रेन सं. 09063/09064 उधना-दानापुर विशेष एक्सप्रेस (द्वि-साप्ताहिक)
ट्रेन सं. 09063 उधना-दानापुर विशेष ट्रेन 17 अक्टूबर, 2020 से उधना से प्रत्येक मंगलवार एवं शनिवार को 08.20 बजे प्रस्थान कर अगले दिन 13.35 बजे दानापुर पहुँचेगी। इसी प्रकार ट्रेन सं. 09064 दानापुर-उधना विशेष ट्रेन 18 अक्टूबर, 2020 से दानापुर से प्रत्येक बुधवार एवं रविवार को 16.40 बजे प्रस्थान कर अगले दिन 22.45 बजे उधना पहुँचेगी। यह ट्रेन यात्रा के दौरान दोनों दिशाओं में नंदुरबार, जलगाँव, भुसावल, खंडवा, हरदा, इटारसी, पिपरिया, जबलपुर, कटनी, सतना, माणिकपुर, प्रयागराज, ग्यानपुर रोड, वाराणसी, पं. दीन दयाल उपाध्याय, बक्सर तथा... more...
आरा स्टेशनों पर ठहरेगी। इस ट्रेन में एसी III टियर, शयनयान तथा द्वितीय श्रेणी सीटिंग के डिब्बे होंगे।
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.