Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

रेलफैनों की तो बात ही कुछ और है

Search Forum
Post PNR
Close-up; Side View; Large TB; EOG/SLR; Outside of Train;
Entry# 3120308-0
Side View; Small TB; 1 AC/Ex CC; Standing at Station;
Entry# 4187800-0


Availability Calendar
Search GTL to SEM
Return# 22692
PDF Download

12429⇒22691/K.S.R. Bengaluru - Hazrat Nizamuddin Rajdhani Express
Other Names: Bangalore Rajdhani/Namma Rajdhani
क्रा.सं.रा बेंगलुरु - हज़रत निज़ामुद्दीन राजधानी एक्सप्रेस

GTL/Guntakal Junction --> SEM/Sedam

Updated: Apr 11 (23:35) by guest
Apr 11 (23:35)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    3847 blog entries  <<prev  next>>
Rail Fanning
14740 views
4

Aug 21 (13:05)   22692/Hazrat Nizamuddin - K.S.R. Bengaluru Rajdhani Express | ED/WAP-7/39232
TrainsArdour
TrainsArdour   17 blog posts
Entry# 6163948            Tags   Past Edits
2 compliments
Great Great
The mighty 75th WAP-7/39232, proudly named Siruvani, leading the prestigious Hazrath Nizamuddin-KSR Bangalore Rajdhani Express, gracefully curving into Cherlapally Railway Station.
Translate to English
Translate to Hindi
General Travel
13423 views
0

Aug 16 (12:47)   22692/Hazrat Nizamuddin - K.S.R. Bengaluru Rajdhani Express
svravibhargav
svravibhargav   500 blog posts
Entry# 6159189            Tags  
This can be speeded up between SBC and SC:
SBC 20.30
SSPN 22.50
GTL : 01.00/01.05
Raichur 02.45
Seram
...
more...
04.55
SC 07.15/07.25 and no change there on

Return:
22692 can start at 20.20
Hence 30 mins delay
SC : 17.50/18.00
Seram 20.10
Raichur 22.10
GTL 23.50/23.55
SSPN 03.00
SBC 05.20

Translate to English
Translate to Hindi

12448 views
0

Aug 16 (12:54)
Mahaveer Jain^~   11688 blog posts
Re# 6159189-1              
Even sspn can be bypassed
Translate to English
Translate to Hindi
General Travel
80493 views
1

Aug 15 (14:45)   20173/Rani Kamalapati (Habibganj) - Rewa Vande Bharat Express | MSO/Misrod (3 PFs)
Arpan~
Arpan~   5721 blog posts
Entry# 6158220            Tags   Past Edits
Happy 78th Independence Day to IRI Family.

Please Enjoy the 9 in 1 Trains Action

Jai Hind
Translate to English
Translate to Hindi
General Travel
286162 views
5

Feb 05 (08:35)   12785/Kacheguda - Mysuru SF Express (PT) | SC/Secunderabad Junction (10 PFs)
RoyalIndianRailways
RoyalIndianRailways   510 blog posts
Entry# 5961845            Tags   Past Edits
1 compliments
Great
New king of SCR & Common King of SCR and SWR 👑👑King Kacheguda SF Express. Pride of hyderabad Bengaluru. Best train for IT Software employees ,students etc .king of all Night Riders.Daily overtaking SWR prestigious Hazrat Nizamuddin KSR Bengaluru Rajdhani SF Express At swr territory. One of the common and Most favorite and famous train of SCR and SWR railfans .
King kacheguda Mysuru SF express (#King👑 Kacheguda EXP)❤️‍🔥❤️‍🔥
Translate to English
Translate to Hindi

More Posts
Info Update
1206799 views
2

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   568 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced wnd cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that my post don't get archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can see that whether this coach composition for train sets will become a successful idea or will become a flop idea.

Translate to English
Translate to Hindi

More Posts
Page#    3847 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy