Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

RailFans - the future of journalism

Search Forum
Post PNR
Medium; Side View; Large TB; EOG/SLR; Outside of Train;
Entry# 3981971-0
Medium; Side View; Small TB; 3 AC; Outside of Train;
Entry# 4411689-0


Availability Calendar
Search ANVT to STA
Return# 12427
PDF Download

12428/Anand Vihar Terminal - Rewa SF Express
Other Names: Rewa Express
आनन्द विहार टर्मिनल - रीवा सुपरफास्ट एक्सप्रेस

ANVT/Anand Vihar Terminal --> STA/Satna Junction

Updated: Mar 11 (19:34) by Siddharth98^~
Mar 11 (19:34)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    808 blog entries  <<prev  next>>
General Travel
47415 views
3

Nov 07 2022 (13:23)   12427/Rewa - Anand Vihar Terminal SF Express (PT) | ANVT/Anand Vihar Terminal (7 PFs)
Rajdhani_in_KG_line~
Rajdhani_in_KG_line~   2996 blog posts
Entry# 5538024            Tags   Past Edits
1 compliments
Great
Some spotting at ANVT
Translate to English
Translate to Hindi
General Travel
79370 views
18

★★★
Apr 16 2022 (20:25)   12427/Rewa - Anand Vihar Terminal SF Express (PT) | REWA/Rewa (5 PFs)
guest
Entry# 5302604            Tags   Past Edits
Never once I thought I'd see the coaches used in Rajdhani Trains (LHB) at Rewa with Electric Locomotive of all things 😂
My 2nd 130 MPS Ride in a Normal Superfast Train.
Some Pictures of Rewa Anand Vihar Terminal Express at Rewa Station, Satna Station and Manikpur Junction.
According to Staff bedrolls will be provided from 18th onwards.
It
...
more...
was same EXACT rake with which I came on 10th April, maintenance of coach (A1) was typical NR Jugaad.
Basic cleaning done at Platform, way better condition than what it was at Anand Vihar Terminal that day.
It was hauled by Itarsi WAP 4 with Itarsi WAG 9 HC in Shut off mode till Satna where Ghaziabad WAP 7 took over. There was a TKD WAP 7 as well at Platform# 2 of Rewa which I thought would be the link for my train, but it stayed there probably for Rewanchal Express.
Ticket checking done just before reaching Satna Junction.
HUMONGOUS rush at Satna Junction for this train. Same goes for Prayagraj as well, train captain of the train was from Prayagraj Division and boarded at Prayagraj Junction.
Considerable rush at Sirathu and Fatehpur for this train as well, especially Sirathu.

Translate to English
Translate to Hindi

10 Posts

43581 views
1

Apr 17 2022 (09:22)guest
Re# 5302604-11              
I might try them but odd timing is an issue at Prayagraj Junction for Shiv Ganga Express, plus it remains already full.
12582 still has decent timings for New Delhi Prayagraj Strech and would be tried surely. Return timings 12581 is not that suitable, if i have to go with that then I'd rather take Rajdhani till New Delhi.
I would've loved to have Allahabad Duronto in this situation, had it existed I would've used Rewa Express only for Rewa Prayagraj Strech 😂 before moving into Duronto but now it's no more, vice
...
more...
versa for return too.
Humsafar only helps AC 3 Tier and Sleeper Passengers. I agree that Prayagraj Express has good amount of AC 2 Tier and AC First coaches but nothing beats the convenience of having another option with all classes.
Look at the trains you've mentioned here.
Both are amazing and same should've happened with Prayagraj as well. Plus the whole ANVT/NDLS thing is idiotic- they already have a 4 day slot at NDLS, it'd be much easier to make it Daily and remove this whole some days ANVT some days New Delhi thing altogether.

Translate to English
Translate to Hindi

42556 views
1

Apr 17 2022 (09:38)guest
Re# 5302604-12              
As far as Coach Maintenance is concerned.
Mosquitoes in trains at ANVT are something I had expected given it's proximity to great Ghazipur Gutter.
Problem is: Taps, Flush Knobs, Toilet jets..... Everything is in shambles and Just remaining there through jugaad. When you lift the tap for water, water comes from above the tap through gap. This is not the type of maintenance someone expects in AC 2 Tier, same was true for some of other AC Coaches as well.
I
...
more...
cannot imagine what Sleeper of Unreserved Coach looks like traveling in it.
Windows aren't cleaned from Inside, I had to use a Napkin myself while OBHS Guy shamelessly watched. When I showed the amount of dirt on my napkin others also started complaining and he ran away stating it's due to ANVT.
If Railways is hell bent on turning trains into Semi AC Superfast Trains the least they could do is actually maintain them.
Yes, it can be one off situation but it's more frequent with NR and ECoR trains.

Translate to English
Translate to Hindi

42326 views
0

Apr 17 2022 (10:10)guest
Re# 5302604-13               Past Edits
@5302604-0  @guest
Look at the width of the platform for #2 & #3. Just can't believe they have made its width so narrow considering traffic in upcoming years. Why management don't consider basic things regarding passengers convenience?!
Translate to English
Translate to Hindi

41091 views
0

Apr 17 2022 (11:53)guest
Re# 5302604-14              
@5302604-13  @guest
Rewa doesn't experience that much rush. Even in Upcoming years it won't experience the rush that we see in Prayagraj or similar cities.
This much width is enough.
Also high rush trains like Rewanchal Express and Anand Vihar Terminal Express are placed on Platform #1 mainly. Even if they're placed on Platforms 2 & 3 it is highly unlikely we'd see 2 Extremely High Rush trains standing side by side at the same time.
The
...
more...
only issue here is Low Platform Height, especially for LHB Trains. It's highly problematic, especially for Older Aged People.

Translate to English
Translate to Hindi

43594 views
1

Apr 17 2022 (15:02)
ananddwivedi~
ananddwivedi~   6623 blog posts
Re# 5302604-15              
@5302604-0  @guest
Nice shot buddy .
Translate to English
Translate to Hindi
General Travel
33644 views
1

Sep 23 2022 (11:36)   12427/Rewa - Anand Vihar Terminal SF Express (PT) | CNB/Kanpur Central (10 PFs)
Netrapal90^~
Netrapal90^~   8454 blog posts
Entry# 5485068            Tags  
313 km. In 11 hours
Translate to English
Translate to Hindi

20826 views
1

Sep 23 2022 (11:40)
Rajesh4595~
Rajesh4595~   696 blog posts
Re# 5485068-1               Past Edits
Your train delayed due to primary spring defective in one coach , resulting train run with 60 KMPH up to destination. Inconvenience caused is deeply regretted.

Sr.domald
Translate to English
Translate to Hindi
0
updating ...
8 wishes
Happy Journey Happy Journey Happy Journey Happy Journey I wish you no more Sucklines 🥲आपको सदैव हरी झंडी मिलती रहे ज़रा संभल के शुभ यात्रा உங்கள் பயணம் இனிதே அமைய வாழ்த்துக்கள்
Weekend trip to Lucknow. Currently booking. Jai Mahakaal 🙏🙏

36 Posts

FmtBlog
23877 views
0

Jul 22 2022 (23:03)
Kumaon_Tiger^~
Kumaon_Tiger^~   40368 blog posts
Re# 5421599-37            Tags  

More Posts
General Travel
36020 views
2

Jul 15 2022 (11:00)   12381/Poorva Express (Via Gaya) (PT)
TC4D^~
TC4D^~   15973 blog posts
Entry# 5413819            Tags   Past Edits
02563 BJU NDLS Clone, 12275 Prayagraj Humsafar,12427 Rewa SF, 12417 Prayagraj SF & 12367 Vikramshila Express
overtook 12381 Poorva Express.
Translate to English
Translate to Hindi

More Posts
Page#    808 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy