Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

दौड़ती है हिमालय तट से सागर, हमसफ़र हर राह पर, हवाई जहाज़ों को त्याग कर, करो अक्सर, भारतीय रेल में सफर. - Arpit P

Search Forum
Post PNR
Availability Calendar
Search KCG to MAQ
Return# 12790
PDF Download

17606⇒12789/Kacheguda - Mangaluru Central SF Express (PT)
काचीगुडा - मंगलूरु सेंट्रल सुपरफास्ट एक्सप्रेस

KCG/Kacheguda --> MAQ/Mangaluru Central (Mangalore)

Updated: Mar 07 (00:41) by GujratMail^~
Mar 07 (00:41)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    177 blog entries  <<prev  next>>
Rail Fanning
75166 views
11

Dec 05 2023 (22:14)   12789/Kacheguda - Mangaluru Central SF Express (PT) | KRNT/Kurnool City (3 PFs) | GY/WDM-3A/16474
dsourav895~
dsourav895~   720 blog posts
Entry# 5902293            Tags   Past Edits
3 compliments
Great Great Great
⭐⭐Diamond Jubilee for Diesel Loco Shed Gooty⭐⭐

Whenever one mentions the name "Gooty", the first picture in a rail enthusiast's mind is mostly a Kingfisher liveried Alco ! I am no exception either !

In
...
more...
frame: Alco twins from Gooty (GY), WDM 3A # 16474 + WDM 3D # 11371 pulling into Kurnool Town with 12789 Kacheguda - Mangaluru Central SF Express

Translate to English
Translate to Hindi

53282 views
0

Dec 05 2023 (22:23)
Kumar234~
Kumar234~   343 blog posts
Re# 5902293-1              
This train should run with lhb rake right
Translate to English
Translate to Hindi

54322 views
0

Dec 05 2023 (23:07)
TheLoneWanderer
TheLoneWanderer   8059 blog posts
Re# 5902293-2              
This seems to be veryyy old picture .....it got converted to LHB long back and running with e-loco atleast for the last 6 month i guess
Translate to English
Translate to Hindi
Rail Fanning
75595 views
2

Apr 04 2023 (07:56)   12789/Kacheguda - Mangaluru Central SF Express (PT) | KCG/Kacheguda (5 PFs)
SreeNdl^~
SreeNdl^~   4306 blog posts
Entry# 5684207            Tags  
1 compliments
Great
12789 Kacheguda to Mangaluru SF Exp
Shot taken at kcg
Translate to English
Translate to Hindi
General Travel
53888 views
0

May 09 2023 (22:19)   12789/Kacheguda - Mangaluru Central SF Express (PT)
AZT~
AZT~   3195 blog posts
Entry# 5718173            Tags  
Does anybody even travels e2e in this?
Translate to English
Translate to Hindi

46832 views
3

May 10 2023 (10:30)
deepak.yerr~
deepak.yerr~   6054 blog posts
Re# 5718173-1              
1 compliments
Agree
There will be travellers end to end in any train and there are certain section of travellers who are not comfortable with road travel through Bus which is expensive and takes 18 hrs. SL travellers doesn't have any other option though 2AC and 3AC can opt for bus by paying extra
Translate to English
Translate to Hindi

45542 views
0

May 10 2023 (17:08)
deepak.yerr~
deepak.yerr~   6054 blog posts
Re# 5718173-2              
Checked the charts and current availability boarding at Manguluru is
SL 350 3AC 60 2AC 30. Of these in 3AC and 2AC there 5-6 travellers from Manguluru to Kacheguda. Another 4 berths in 3AC are occupied from Mangalore to Coimbatore and from Coimbatore to KCG which leaves at 400 and arrives at 2330hrs. The train has good booking from Kozhikode.
Translate to English
Translate to Hindi

45608 views
0

May 11 2023 (16:49)guest
Re# 5718173-3              
Instead of doing all this railways can take this train from KCG to SRR via- KRNT, ATP, YNK, Kunigal, Hassan, Mangalore.Jn, Kasaragod, Kannur, Kozhikode and Tirur. It would barely take around 1270km which would save around 260km compared to on travelling around 1530KM, as the other part down the Kerala from SRR can be connected by sabari Express and can easily make this train as daily train as this route will take around 19 to 20 hr to reach Mangalore and for sure it will definitely run with full occupancy, as from the north of the Kerala as it takes even less time as compared to the existing route. It would just take 25hrs30min in reaching the destination with an average speed of 49KMPH as the route is ghat section between hassan, sakleshpura and subramanya road and the coach composition can be fixed to 16 by giving 2-EOG,2-UR, 1-HA, 1-A, 3-B,...
more...
PC, 6-S this is perfect, but this will just remain as a imaginary train and a dream which will never come into existence railways, SCR is such money minded which never tries to run train beyond 2 zones unless that's highly profitable 😵‍💫😵‍💫

Translate to English
Translate to Hindi

46656 views
0

May 11 2023 (16:56)
G1Nesar~
G1Nesar~   1137 blog posts
Re# 5718173-4              
@5718173-3  @guest
/train/31071
Check my imaginary train. It's a practically feasible train , except neither SWR nor SCR bother about it.
Translate to English
Translate to Hindi

45230 views
0

May 11 2023 (18:10)
deepak.yerr~
deepak.yerr~   6054 blog posts
Re# 5718173-5               Past Edits
@5718173-3  @guest
They are not giving path through Hassan Manguluru for passenger trains due to safety concerns and cargo slots. after pressures from MP of Karnataka of Manguluru region they cleared Benguluru MYS Manguluru spl so who will take up the cause of train to Hyderabad? You just can't blame SCR in this matter with half knowledge. Even Spl to Bijapur is running after lot of followup and pressure with loose TT.
Translate to English
Translate to Hindi
Rail Fanning
136577 views
12

★★
Mar 07 2023 (20:57)   17652/Kacheguda - Puducherry Express (PT) | KRNT/Kurnool City (3 PFs) | GY/WDP-4D/40272
BengaluruDiaries^~   21862 blog posts
Entry# 5656730            Tags   Past Edits
5 compliments
Great Great Great Great Great
On 5th March 2023, while returning back from Kurnool to Arakkonam by Kacheguda - Chengalpattu Express, I had captured some images en-route. I will be posting them in the blogs below:

Source: My own
Dates of capture: 5th & 6th March 2023
Device:
...
more...
Samsung J7 NXT

Translate to English
Translate to Hindi

More Posts
General Travel
74831 views
2

Nov 28 2022 (23:05)   12789/Kacheguda - Mangaluru Central SF Express (PT) | KCG/Kacheguda (5 PFs)
guest
Entry# 5557953            Tags   Past Edits
Is their any chance of increasing the frequency and re-routing of Kacheguda Mangalore Bi-Weekly SF Express to daily...? as the train is running with huge waiting list all the time.... And re-routing will save around 8 to 9 hrs of time and changing the terminal to Shoranur
Translate to English
Translate to Hindi

65511 views
0

Nov 30 2022 (09:37)
deepak.yerr~
deepak.yerr~   6054 blog posts
Re# 5557953-1              
@5557953-0  @guest
There is no chance of diversion due to infrastructure constraints Londa Madgoan section and Hassan Mangalore being ghat sections and freight traffic. This train introduced to cater to North Kerala mainly. Chances of making daily is also less as it shares slot with KCG Madurai express but cam be made 4 days if Kerala organization and North Kerala MPs meet SCR and put a request.
Translate to English
Translate to Hindi
Page#    177 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy