Had the missing link between bilara- bar completed then this problem would not have arised. Railways don't consider the fact that during such works whether planned or unplanned due to accidents or natural events, the losses can be minimised if there is an alternative route nearby. It's high time NWR should take up the missing link on priority along with GC of MJ- Mavli.