Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Ammi Jaan kahti thi Railfanning se bada koi dharm nhi hota or koi Railfan chhota nhi hota - Shanzil Kabir

Search Forum
Post PNR
Small TB; Sleeper; Outside of Train;
Entry# 3973224-0
Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 5144795-4


Availability Calendar
Search YLM to SC
Return# 12728
PDF Download

12727/Visakhapatnam - Hyderabad Godavari SF Express (PT)
विशाखपट्टणम - हैदराबाद गोदावरी सुपरफास्ट एक्सप्रेस

YLM/Elamanchili --> SC/Secunderabad Junction

Updated: Oct 01 2023 (20:36) by PurushottamExpress^~
Oct 01 2023 (20:36)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    2064 blog entries  <<prev  next>>
General Travel
145430 views
1

May 19 2023 (16:33)   12785/Kacheguda - Mysuru SF Express (PT) | SC/Secunderabad Junction (10 PFs)
RoyalIndianRailways
RoyalIndianRailways   478 blog posts
Entry# 5728014            Tags   Past Edits
Happy 48th birthday to legendary kacheguda Mysuru SF Express which is known as King 👑 of Hyderabad Bengaluru. And devote of IT employees train. Fully demanded. Started from secunderabad to Bengaluru City in 1975 🎉✨🎂🍫💫🎈🎁👑🔱
Translate to English
Translate to Hindi
General Travel
33005 views
3

May 14 2023 (06:36)   12727/Visakhapatnam - Hyderabad Godavari SF Express (PT)
Bharat7283
Bharat7283   18 blog posts
Entry# 5722671            Tags   Past Edits
Hyderabad bound Godavari express seems to be getting delayed on daily basis.
Visakhapatnam bound one seems to be doing good and arriving mostly on-time.
SCR needs to somehow find a solution for this.
The congestion happens starting Rajahmundry, then Vijayawada and continues to Warangal/Secunderabad section.
Overnight
...
more...
trains getting delayed by 2hrs regularly is not a good thing.

Translate to English
Translate to Hindi

28046 views
2

May 14 2023 (09:59)
deepak.yerr~
deepak.yerr~   6363 blog posts
Re# 5722671-1              
This is common from last 6 months all night trains to SC from BZA line are late by 30-60 mins. Nowadays Even SC outbound trains to Vskp are also late by 30 mins on 3-4 out of 7 days.
Translate to English
Translate to Hindi

25289 views
0

May 15 2023 (13:23)
Srikanth_BZA~
Srikanth_BZA~   2233 blog posts
Re# 5722671-2               Past Edits
The problem is because of VB. They are using Road CUM Rail bridge for VB to enter on PF 3 at RJY. Till that time, all the down trains are waiting at RJY.
Translate to English
Translate to Hindi

22756 views
0

May 15 2023 (18:20)
deepak.yerr~
deepak.yerr~   6363 blog posts
Re# 5722671-3              
Why any particular reason ? rail cum road bridge is fit for only 60kmph and when the train approaches near to road bridge end the speed has to come down to 15kmph upto PF. Even changing line at Kovvur need to be down to 15kmph.- 30kmph On the third bridge the MPS is 80kmph and even after that past godavari Stn it can travel at 60kmph.
Translate to English
Translate to Hindi

22187 views
0

May 15 2023 (20:12)
Srikanth_BZA~
Srikanth_BZA~   2233 blog posts
Re# 5722671-4               Past Edits
I think there is a long PSR before RJY from 3rd bridge and also Road cum rail bridge is shorter distance. Just because of priority, it seems.
Translate to English
Translate to Hindi
Rail Fanning
41013 views
0

May 05 2023 (18:29)   12728/Hyderabad - Visakhapatnam Godavari SF Express (PT) | SC/Secunderabad Junction (10 PFs) | ED/WAP-7/30644
SGUJ_20011^~
SGUJ_20011^~   10458 blog posts
Entry# 5714288            Tags   Past Edits
12728 Godavari SF arrived on PF1 of Secunderabad Kn led by a ERODE WAP7 #30644. !!
Translate to English
Translate to Hindi

More Posts
General Travel
72721 views
7

Feb 15 2023 (18:35)   12727/Visakhapatnam - Hyderabad Godavari SF Express (PT) | GT/Ghatkesar (4 PFs)
Gourav~
Gourav~   1707 blog posts
Entry# 5633307            Tags  
Pics from accident site of 12727 Vskp-Hyd Godavari Express !!

Work for track recovery going on.

No major loss to LHB coaches of Godavari. Pics captured from 22691 Namma Rajdhani
Translate to English
Translate to Hindi

44272 views
0

Feb 17 2023 (16:56)
Venky63~
Venky63~   8024 blog posts
Re# 5633307-1              
Thanks ,saw the run of today 12723 TG which crossed the accident spot after 15minutes of godvari derailment
.luckily one line did not suffer much damage
Will today 12728 run with reduced coaches or CDO ,Nampally will replace the damaged coach with spare coach or take out coach any other train coach ??
Translate to English
Translate to Hindi

45383 views
0

Feb 17 2023 (17:03)
Gourav~
Gourav~   1707 blog posts
Re# 5633307-2              
It would mostly be replaced with spare coaches
Translate to English
Translate to Hindi

43128 views
0

Feb 17 2023 (17:33)
Venky63~
Venky63~   8024 blog posts
Re# 5633307-3              
Thanks ,left on time from HYB ,now at SC
Translate to English
Translate to Hindi
General Travel
54543 views
8

Feb 16 2023 (22:05)   12727/Visakhapatnam - Hyderabad Godavari SF Express (PT) | GT/Ghatkesar (4 PFs)
DrSwaroop^~
DrSwaroop^~   109895 blog posts
Entry# 5634775            Tags  
4 compliments
Useful Useful Great _/\_
The intensity of yesterday's derailment of Godavari Express was severe. Train derailed at flat 💯. The sleeper beds ripped out of the ballast, OHE distorted and the track was severely damaged. If it wasn't LHB coaches then it would have been a really lethal derailment.
Translate to English
Translate to Hindi

7 Posts

45766 views
2

Feb 16 2023 (22:25)
DrSwaroop^~
DrSwaroop^~   109895 blog posts
Re# 5634775-8              
2 compliments
Great:Good to hear this!! Great
Track restored with a caution of 30kmph.
Translate to English
Translate to Hindi

46472 views
0

Feb 16 2023 (23:12)
LHB_for_18047~
LHB_for_18047~   10884 blog posts
Re# 5634775-9              
What was the cause of derailment ?
Translate to English
Translate to Hindi

44482 views
1

Feb 17 2023 (07:35)
DrSwaroop^~
DrSwaroop^~   109895 blog posts
Re# 5634775-10              
1 compliments
Useful
Some minor damage in track
Translate to English
Translate to Hindi

1 Posts

40438 views
0

Feb 17 2023 (13:46)
Gourav~
Gourav~   1707 blog posts
Re# 5634775-12              
See my post where I captured accident site during my trip.

/blog/post/5633307

Also saw the affected coaches, LHB ke chalte unko jyada nuksan nai hua..
Translate to English
Translate to Hindi

34603 views
1

Feb 19 2023 (12:20)
RFIR~
RFIR~   6908 blog posts
Re# 5634775-13              
That is the other thing pointed our by railway authorities which is the fact that because there are so many trains running nowadays throughout , there is hardly any gap to avail of blocks so that proper maintenace can be done. If scheduled blocks need to be done for long time, then trains will either have to be cancelled or rescheduled which will add to passenger inconvenience so it is a thin line in balancing both. Scheduled maintenance time for repairs and checks and at the same time ensure passenger & freight operations also run unaffected.
Translate to English
Translate to Hindi
Page#    2064 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy