Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailFans don't miss their train. Why? Because they go to the station HOURS before the actual departure of their Train - to watch OTHER trains depart. - Prince Maan

Search Forum
Post PNR
Availability Calendar
Search TUNI to KCG
Return# 12862
PDF Download

18561⇒12861/Visakhapatnam - Mahbubnagar SF Express
विशाखपट्टणम - महबूबनगर सुपरफास्ट एक्सप्रेस

TUNI/Tuni --> KCG/Kacheguda

Updated: Jan 11 (15:27) by Jayashree^
Jan 11 (15:27)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    531 blog entries  <<prev  next>>
General Travel
110185 views
8

Oct 20 2023 (15:35)   12862/Mahbubnagar - Visakhapatnam SF Express (PT) | KRNT/Kurnool City (3 PFs)
SCoR~
SCoR~   1812 blog posts
Entry# 5857583            Tags   Past Edits
1 compliments
Agree
This train should extend to Kurnool and hence all the Three Capitals of AP will be connected
Translate to English
Translate to Hindi

39 Posts

39831 views
0

Oct 24 2023 (15:41)
krnt_vskp_express~
krnt_vskp_express~   5715 blog posts
Re# 5857583-40              
I don't think you are understanding my context, places like nandyal or Kurnool needs a connectivity to new capital and we are relying on existing pit line places like Guntur or MTM to run new trains. They are least bothered to start trains from krnt/ndl and at the same time division HQs line Guntur/Kachiguda are least bothered to allot pit lines.

It's like chicken and egg problem. Either start new trains or allot pit lines. We can't be denied both
Translate to English
Translate to Hindi

37038 views
0

Oct 25 2023 (21:05)
Mnj777~
Mnj777~   1260 blog posts
Re# 5857583-41              
Please check total number of pitlines available in Guntur division once.....Also ability to lobby for these facilities lie with MP of the region. Nandyal wasn't terminus/ Junction until recent times, How can it be granted for a station in middle if there's little political representation?....Also if you want a train from kurnool, it can be started even with existing resources/ extensions from Secunderabad, why obsess with pitlines?
Translate to English
Translate to Hindi

37076 views
0

Oct 26 2023 (00:42)
krnt_vskp_express~
krnt_vskp_express~   5715 blog posts
Re# 5857583-42              
hope you read my previous response

"I don't think you are understanding my context, places like nandyal or Kurnool needs a connectivity to new capital and we are relying on existing pit line places like Guntur or MTM to run new trains. They are least bothered to start trains from krnt/ndl and at the same time division HQs line Guntur/Kachiguda are least bothered to allot pit lines.
...
more...

It's like chicken and egg problem. Either start new trains or allot pit lines. We can't be denied both"

Translate to English
Translate to Hindi

32723 views
0

Oct 27 2023 (21:05)
Mnj777~
Mnj777~   1260 blog posts
Re# 5857583-43              
You need connection,.you can demand a train... Pitlines don't solve the problem if there's no will to start a train sir. Asking for an extension which is easier, demand of new train takes some efforts, MP of those regions should ask. How many train did Guntur get after a pitline? Only Rayagada express was extended to free up bza. No relation here between infra and trains, if there is will some how they will arrange.
Translate to English
Translate to Hindi

32993 views
0

Oct 27 2023 (23:18)
krnt_vskp_express~
krnt_vskp_express~   5715 blog posts
Re# 5857583-44              
I am asking either pitlines or trains...

All I am saying, places like Guntur/MTM/Narsapur/Kakinada may consider intra state trains as well. If we have a pitline Krnt/ndl then we can run a train
Translate to English
Translate to Hindi
General Travel
302201 views
7

Oct 26 2023 (22:27)   12737/Gowthami SF Express (PT) | EE/Eluru (3 PFs)
SaiRBRTRailway~
SaiRBRTRailway~   3684 blog posts
Entry# 5863194            Tags   Past Edits
2 compliments
Great Great
Redevelopment of Eluru Railway Station under AmritBharatStations Scheme. Cover Over Platforms shelter foundation work currently in progress at Eluru on PF 2&3
Translate to English
Translate to Hindi

More Posts
General Travel
94281 views
4

Sep 09 2023 (02:19)   12861/Visakhapatnam - Mahbubnagar SF Express | KRNT/Kurnool City (3 PFs)
krnt_vskp_express~
krnt_vskp_express~   5715 blog posts
Entry# 5817275            Tags  
Now, mtm-krnt is also pushed to MALM so this train can easily be occupying the same place

High time , they should extend this train to Kurnool
Translate to English
Translate to Hindi

16 Posts

25846 views
0

Oct 21 2023 (11:42)
SaniyanSagadai~
SaniyanSagadai~   2391 blog posts
Re# 5817275-17               Past Edits
of course. this having RSA with NS GNT, though it is a slower connection still it will be useful. better they can make it a single train NS KRNT. i asked previous question for DMM.
Translate to English
Translate to Hindi

25258 views
0

Oct 21 2023 (20:35)
krnt_vskp_express~
krnt_vskp_express~   5715 blog posts
Re# 5817275-18               Past Edits
gnt-dhne, we were expecting for kurnool whereas gnt division is asking for dmm..
Translate to English
Translate to Hindi

25038 views
0

Oct 21 2023 (20:43)
SaniyanSagadai~
SaniyanSagadai~   2391 blog posts
Re# 5817275-19              
Yes yes i heard that GNT DHNE exp is going to extend to DMM.
Translate to English
Translate to Hindi

34910 views
0

Oct 22 2023 (08:50)
NaagendraV
NaagendraV   332 blog posts
Re# 5817275-20               Past Edits
Bro , Kurnool fall under HYD division. before forming the hyd division it was in SC division. this is my concern Bro, why scr not developing andhra region. present BZA division most of the terminals operated from long back.. i.e early 1920 where meter gauge train was ran. #andhrarailwayinfra #SCR #Scor #AndhrarailwayPitlines
Translate to English
Translate to Hindi

22251 views
0

Oct 22 2023 (12:29)
krnt_vskp_express~
krnt_vskp_express~   5715 blog posts
Re# 5817275-21              
Operating long back doesn't justify why GNT/BZA divisons are not running a single regular express train to Kurnool. Common, not even a single express train ? Then what is the bemefit of those pitlines for.. Those divisions always ask for different state destinations but never care for us..

Kurnool needs connectivity to new capital (vizag) but we don't have pit lines
Kurnool/mbnr needs
...
more...
a train to Mumbai but we can't get because we don't have pitlines

Whereas new pitlines are getting constructed at nallapadu but no one cares about nandyal/Kurnool

Translate to English
Translate to Hindi
Rail Fanning
28490 views
2

Oct 12 2023 (20:00)   12861/Visakhapatnam - Mahbubnagar SF Express | KCG/Kacheguda (5 PFs) | LGD/WAP-7/37441
Rishab_Amadala~
Rishab_Amadala~   2042 blog posts
Entry# 5851099            Tags   Past Edits
HOG fitted WAP7/37441 Lallaguda hauled 12861 VSKP MBNR exp at Kacheguda
Translate to English
Translate to Hindi
General Travel
35916 views
1

Sep 19 2023 (16:13)   12862/Mahbubnagar - Visakhapatnam SF Express (PT) | KCG/Kacheguda (5 PFs)
deepak.yerr~
deepak.yerr~   6358 blog posts
Entry# 5825492            Tags  
Kacheguda to Mauli Ali cabin mainline total 15km took 50mins to travel. This may be standard for all trains as the train is on move continously and had halt in Malkajgiri station. If the train goes to SC station and has Loco reversal then also it will take 50-60mins so there is no benefit of cut in running time and only convenience of railway operations at Secunderabad.
Translate to English
Translate to Hindi

23011 views
0

Sep 19 2023 (17:53)
Rajesh~
Rajesh~   2353 blog posts
Re# 5825492-1              
Minimum 40mnts required
Translate to English
Translate to Hindi

20672 views
0

Sep 19 2023 (18:59)
Naninani
Naninani   466 blog posts
Re# 5825492-2              
Scr is example of worst infrastructure with heavy traffic
Translate to English
Translate to Hindi

20682 views
0

Sep 23 2023 (19:18)
Sheikkaleemsk   96 blog posts
Re# 5825492-3              
This section has a maximum speed of 15kmph...and this section is mostly built in high residential area on elevated track with nullahs and lakes...there was 2 incidents when trains collided into residential homes maybe since then this speed limit came

And coming to scr it is most lazy zone shame on them...

They
...
more...
did doubling of lines in Hyderabad city zone with the help of state government only but zero planning..they asked 600 crores of infrastructure around Hyderabad but due to thier poor planning all 900 crores are wasted

They planned quadrapling between maulali to ghatkesar which is outside city limits and mere 2 stations...but not inside City limits ie between secunderabad maulali which is inside core city and every trains stops hours because lack of quadrapling and extra platforms...
I guess no metro city in India lacks quadrapling lines except Hyderabad

They planned doubling bw sitaphalmandi malkajgiri maulali bypass but they delayed it so much there is zero progress since 10-15 years...this bypass runs on single line and has 15kmph speed limit inside core city

They completed phase 1 of mmts between secunderabad lingampalli without quadrapling or crossing station...

They are building fancy building for secunderabad station but there is no proposal or atleast talk of extra platform or a suburban terminal complex.... secunderabad badly needs a suburban complex for city zone trains..and secunderabad has a lot of railway land almost between secunderabad to cherlapally everything is railway land

Translate to English
Translate to Hindi
Page#    531 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy