Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Vaishali Express - जितना सुंदर तुम्हारा नाम उतनी सुंदर तुम्हारी चाल - be my valentine - Rahul Vatsa

Search Forum
Post PNR
Availability Calendar
Search BATL to MDGR
Return# 05755
PDF Download

05756/Anuppur - Chirimiri Passenger Special (UnReserved)
अनूपपुर - चिरमिरी पैसेंजर विशेष

BATL/Baihatola --> MDGR/Manendragarh

Updated: Nov 19 2023 (11:25) by Kumaon_Tiger^~
Nov 19 2023 (11:25)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    33 blog entries  next>>
Rail News
34764 views
0

Other News
SECR/South East Central
IR Press Release
Aug 29 (02:34)   South East Central Railway Cancels Multiple Passenger Trains from August 27th to September 14th, 2024

Rf_Shanku^~   117 news posts
Entry# 6171830   News Entry# 567041         Tags   Past Edits
read full article... बिलासपुर रेल मंडल के उमरिया स्टेशन को तीसरी रेल लाइन से जोड़ने के लिए उमरिया स्टेशन में नॉन इंटरकनेक्टिविटी का कार्य किया जायेगा ।

The South East Central Railway has announced the cancellation of various passenger trains from August 27th to September 14th, 2024. This includes trains like the Rani Kamalapati (Habibganj)- Santragachi Express, Chirmiri-Chandia Road Passenger Special, Katni-Chirmiri MEMU Special, and many more. The cancellations are for specific dates and durations, ranging from a...
more...
single day to over two weeks. Passengers are advised to check the details of the cancelled trains before travelling.

South East Central Railway ne 27 August se 14 September, 2024 tak kaafi saare passenger trains cancel kar diya hai. Isme Rani Kamalapati (Habibganj)- Santragachi Express, Chirmiri-Chandia Road Passenger Special, Katni-Chirmiri MEMU Special, aur bhi kaafi trains hai. Train cancel hone ka date aur time bhi alag alag hai, kuchh ek...
more...
din ke liye hai toh kuchh do hafte se zyada ke liye. Yaatri logon ko travel karne se pehle cancel trains ki details dekh lena chahiye.
Rail News
19326 views
0

Major Accidents/Disruptions
SECR/South East Central
Aug 14 (19:53)   Rail Line Projects in Chhattisgarh Lead to Train Cancellations and Route Changes

Exynos9611~   18602 news posts
Entry# 6157382   News Entry# 565211         Tags   Past Edits
read full article... 46 ट्रेनें रद्द : पहली बार दो जोन में एक साथ चलेगा काम, दोबारा रद्द नहीं करना पड़ेगा परिचालन

The South East Central Railway (SECR) is undertaking yard remodeling work at the Umariya railway station in the Bilaspur-Katni section. This project, which will connect the station to a third line, will be carried out from August 24th to September 5th. To avoid multiple disruptions to train services, the work...
more...
is being coordinated with a similar project at the Damoh station on the West Central Railway (WCR). Concurrently, the WCR is also adding a third line at the Damoh railway station between Katni Murwara and Bina, from August 26th to September 9th. In total, 46 trains have been canceled and 8 trains have had their routes adjusted due to these projects. This follows the cancellation of 72 trains from August 14th to 19th for a similar project at the Kalamna railway station. The recent cancellations include notable long-distance trains like the Nauatanwa-Durg Express, Durg-Ajmer, Visakhapatnam-Bhagat Ki Kothi Express, and Shalimar Express.

Budget ke baad, Chhattisgarh mein rail line project ka kaam fir se speed pakad chuka hai. Train ka chalna ek hi baar impact ho, iske liye South East Central Railway (SECR) ne West Central Railway (WCR) ke Damoh station ke kaam ke saath saamjhautha kiya aur Umariya station ka non-interlocking...
more...
ka kaam plan kiya hai. Isse rail passengers ko do baar problem ka samna nahin karna padega. Isme, Bilaspur-Katni section ke Umariya railway station ko teesri line se jodne ke liye yard remodeling ka kaam karenge. Umariya station ko teesri line jodne ka kaam 24 August se 5 September tak chalta rahega. WCR Jabalpur Rail Mandal, Katni Murwara aur Bina railway stations ke beech Damoh station ko teesri line se jodne ka kaam 26 August se 9 September tak hoga. Is kaam ki wajah se railway ne 46 trains ko cancel kar diya hai. Iske aalawa 8 trains ka route bhi change kiya gaya hai. 1st August ko SECR Nagpur Rail Mandal, Rajnandgaon-Kalamna rail section ke beech, Kalamna station ko teesri line se jodne ke liye 14 se 19 August tak 72 trains cancel ki thi. Kuch trains badal gayi hai, aur kuch 19 ke baad vapas aayengi. 13 din baad, railway ne fir se 45 trains cancel kar diya hai. August mein 117 trains ab tak cancel ho chuki hain. Cancel hui trains mein Nauatanwa-Durg Express, Durg-Ajmer, Visakhapatnam-Bhagat Ki Kothi Express, aur Shalimar Express jaise lambi duri ki trains bhi shamil hain.
Rail News
49879 views
0

IR Affairs
SECR/South East Central
Aug 14 (08:02)   Train Cancellations and Route Changes due to Infrastructure Work on South East Central and West Central Railway Zones

AdittyaaSharma^~   72978 news posts
Entry# 6156629   News Entry# 565094         Tags   Past Edits
read full article... पश्चिम मध्य रेलवे के साथ सामंजस्य, दोनों जोन में एक साथ होंगे कार्य, रद रहेंगी 46 ट्रेनें

The South East Central Railway zone and West Central Railway zone have coordinated to complete infrastructure works simultaneously, impacting train operations only once. The works involve adding a third line at Damoh Station (West Central Railway) and Umaria Station (South East Central Railway), affecting 46 trains between August 27th and September...
more...
9th. The third line project between Bilaspur and Katni is crucial for connecting the region to North India. Yard remodeling is being done at Umaria station to add the third line, starting from August 24th to September 5th. Damoh station will receive its third line from August 26th to September 9th. The article provides a detailed list of cancelled trains and alternative routes for affected trains.

South East Central Railway zone aur West Central Railway zone ne infrastructure ka kaam ek saath karne ke liye saath aaye hain, jisse train operations ek baar hi affect hongi. Kaam Damoh Station (West Central Railway) aur Umaria Station (South East Central Railway) pe teesri line jodne ka hai. 27 August...
more...
se 9 September ke beech 46 trains cancel hongi. Bilaspur aur Katni ke beech teesri line project poora area ko North India se connect karne ke liye bahut important hai. Umaria station pe yard remodelling karke teesri line jodhi jaa rahi hai, yeh kaam 24 August se 5 September tak chalega. Damoh station ko 26 August se 9 September tak teesri line milegi. Article mein cancel hone wali trains ki list aur affected trains ke alternate routes diye gaye hain.
Rail News
74957 views
0

Major Accidents/Disruptions
SECR/South East Central
Jun 13 (19:55)   Multiple Train Cancellations in Chhattisgarh Due to Railway Work

Exynos9611~   18602 news posts
Entry# 6094269   News Entry# 555988         Tags   Past Edits
read full article... यात्रीगण ध्यान दें: अजमेर एक्सप्रेस, गरीब रथ समेत 24 ट्रेन कैंसिल

The South East Central Railway (SECR) has canceled 23 trains operating in Chhattisgarh due to ongoing third line connectivity work at Mudaria Railway Station near Bilaspur. The work, which involves pre-National Importance (NI) and NI phases, will require a major block from June 20th, causing disruption in train services for eight...
more...
days. Some trains have been canceled completely, while others will be diverted through alternative routes. Notable cancellations include the Ajmer Express from Durg, the Garib Rath Express from Raipur to Lucknow, and the Barouni Express from Gondia, which will not pass through Durg, Raipur, and Bilaspur. The train cancellations will affect passengers significantly.

Chhattisgarh mein ek baar fir se kaafi trains cancel kar diye gaye hain. Railway ne state se chalne wali 23 trains ko cancel kar diya hai. Kuch trains dusre route se chalengi. Milta hai ki SECR ke Bilaspur section me Mudaria station pe third line connectivity ke liye pre NI aur...
more...
NI ka kaam hoga. Isse itni trains cancel honge. Yaatriyon ko pareshani hone wali hai. 20 June ko rail ka mega block hoga. 8 din tak block rahega, isme Durg se chalne wali Ajmer Express, Raipur se Lucknow wali Garib Rath aur Gondia se chalne wali Barouni Express cancel rahenge. Barouni Express Durg, Raipur, aur Bilaspur se nahi chalegi.
Rail News
54769 views
0

Major Accidents/Disruptions
SECR/South East Central
Jun 12 (20:36)   24 Trains Cancelled, 2 Routes Changed in Bilaspur Railway Division Due to Third Line Connectivity Work

Exynos9611~   18602 news posts
Entry# 6093343   News Entry# 555855         Tags   Past Edits
read full article... बिलासपुर आने-जाने वाली कई ट्रेनें रद्द, 2 का बदला रूट, ये है वजह, यहां देखें पूरी लिस्ट

Due to ongoing third line connectivity work in the Bilaspur railway division, 24 trains will be cancelled and 2 train routes will be changed from June 13th to 20th. This work is being done at the Mudaria railway station in Bilaspur division. The railway administration has assured that the train operations...
more...
will be normalized once the work is completed.

Bilaspur railway division mein teesri line connectivity ka kaam chal raha hai, jiske chalte 13 June se 20 June tak 24 trains cancel ki gayi hai aur 2 trains ke routes bhi badal diye gaye hain. Mudaria railway station pe yeh kaam ho raha hai. Railway administration ne kaha hai ki...
more...
kaam khatam hone ke baad trains waapas apne time pe chalna start kar denge.
Page#    33 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy