Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Everyone knows if a train is running late, ONLY RailFans know WHY it is late

Search Forum
Post PNR

TB of 14724 BNW PRYJ Kalindi Exp extended from CNB wef 04-08-23
Entry# 5790900-0
no description available
Entry# 5921555-0


Availability Calendar
Search TDL to FTP
Return# 14117
PDF Download

14724⇒14118/Kalindi Express
कालिंदी एक्सप्रेस

TDL/Tundla Junction --> FTP/Fatehpur

Updated: May 01 (13:54) by bsbssf01^
May 01 (13:54)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    396 blog entries  next>>
General Travel
84426 views
2

Dec 15 2023 (20:30)   14117/Kalindi Express (PT) | PRYJ/Prayagraj Junction (Allahabad) (10 PFs)
Anurag.2001
Anurag.2001   408 blog posts
Entry# 5912337            Tags   Past Edits
What About LHB Conversion Of Kalindi Express ?
Translate to English
Translate to Hindi

41970 views
0

Dec 31 2023 (18:15)
ItsDtherailfan~
ItsDtherailfan~   126 blog posts
Re# 5912337-1              
This train is currently cancelled btw PRYJ and CNB and have PM at Pryj so by March it would start as lhb rsa with Dr.Ambedkar Nagar (DADN) express
Actually I am a localite of DADN so waiting for kalindi express to share its rake with DADN as to see new TB.
Translate to English
Translate to Hindi

3565 views
0

Aug 31 (23:42)
Mridul^~
Mridul^~   47116 blog posts
Re# 5912337-2              
मार्च से सितंबर शुरू हो गया
Translate to English
Translate to Hindi
General Travel
31866 views
12

★★
Aug 13 (21:19)   14117/Kalindi Express (PT) | PRYJ/Prayagraj Junction (Allahabad) (10 PFs)
ProRF.^~
ProRF.^~   9574 blog posts
Entry# 6156311            Tags   Past Edits
4 compliments
Great Great Great Great

4 pics

Prayagraj - Bhiwani Kalindi Express at Prayagraj Platform no. 6 get ready before depart
Translate to English
Translate to Hindi

1 Posts

19440 views
0

Aug 13 (21:55)
ProRF.^~
ProRF.^~   9574 blog posts
Re# 6156311-2               Past Edits
I don't think ki isko abhi milega PRYJ - DADN ke sath RSA ho jata to LHB ho jati
Translate to English
Translate to Hindi

19428 views
0

Aug 13 (22:34)
USri~
USri~   1391 blog posts
Re# 6156311-3              
Shaktipunj to LHB ho chuki hai na
Translate to English
Translate to Hindi

18297 views
0

Aug 13 (22:43)
ProRF.^~
ProRF.^~   9574 blog posts
Re# 6156311-4              
Sorry wo vibhuti likhna tha but wo network problem ho gaya tha uske baad wo post ho hi gaya
So abhi Vibhuti bhi to hai na
Translate to English
Translate to Hindi

17528 views
1

Aug 13 (23:00)
USri~
USri~   1391 blog posts
Re# 6156311-5              
1 compliments
Agree
Arre koi baat nahi..
Vibhuti ke liye to coaches allot huye hain, kissi ne post Kiya tha ICF factory ka coach allotment list to usme uska number tha, waise bhi Vibhuti to ER ki train hai, Kalindi to NCR ki ho gyi
Translate to English
Translate to Hindi

16581 views
0

Aug 14 (01:00)
CrazyTraveller~
CrazyTraveller~   3734 blog posts
Re# 6156311-6              
Ho gyi bhai wo
Translate to English
Translate to Hindi
0
updating ...
1 wishes
Happy Journey
Back to home on weekend

5 Posts

FmtBlog
13226 views
0

Aug 09 (22:19)
Tejk7529~
Tejk7529~   11189 blog posts
Re# 6151497-6            Tags  
@VVKP: Vivekanand Puri Halt   16km/h   20m late
@VVKP: Vivekanand Puri Halt &17 km/h #14118: Kalindi Express crossed
Translate to English
Translate to Hindi

More Posts
Info Update
99200 views
4

Apr 05 (22:57)   14117/Kalindi Express (PT) | BKO/Bindki Road (3 PFs)
bsbssf01^
bsbssf01^   1272 blog posts
Entry# 6020564            Tags   Past Edits
1 compliments
Useful
14117/18 Kalindi Express Stoppage at Bindki Road Approved by Railway Board.
(CC-243)
Translate to English
Translate to Hindi

5 Posts

57979 views
2

May 20 (21:22)
LHB_for_18047~
LHB_for_18047~   11156 blog posts
Re# 6020564-6              
1 compliments
Agree
I think the extreme rake standardization of each and every train was a bad idea as of now. Instead they should have gone for keeping 5 to 7 SL coaches with 3 GS and 9 to 11 AC coaches type rake standardization in long distance trains initially.
Also now in some trains where AC travel demand exists they have reduced AC coaches which is also a bad idea eg. Goa express it will have only one 3AC and two 3E from June it's a terrible coach composition in my opinion.
Translate to English
Translate to Hindi

56650 views
0

May 20 (21:28)
LHB_for_18047~
LHB_for_18047~   11156 blog posts
Re# 6020564-7              
3E prices if priced lower would have been a superb middle ground between SL and 3AC.
In a country like India Air Conditioners should be a necessary commodity not a luxury because of the hot weather. I travelled in SL class in the hot month of May in 2014 it was a horrible journey coz of the heat and today combined with the overcrowding in SL it's a nightmarish experience.
Translate to English
Translate to Hindi

36511 views
0

Jul 02 (12:43)
Mridul^~
Mridul^~   47116 blog posts
Re# 6020564-8              
Actually if they need to run trains above 130kmph then trains must be fully AC.

So long distance trains must be fully Air conditioned.

There is absolutely no impact on 3AC, 2nd AC
...
more...
and 1st AC Class but for Sleeper class passengers, they should increase the fare by 50% and convert those into Economy coaches.

For General Class, fare can be increased to double but coaches should be UR AC Coach.

This will be required for long distance running trains.

Translate to English
Translate to Hindi

34893 views
0

Jul 02 (16:23)
LHB_for_18047~
LHB_for_18047~   11156 blog posts
Re# 6020564-9              
But LHB SL and GS coaches can run at 130kph MPS no ?
Translate to English
Translate to Hindi

34884 views
1

Jul 02 (16:59)
Mridul^~
Mridul^~   47116 blog posts
Re# 6020564-10              
1 compliments
Useful
Yes those can run at 130KMPH but in future, we will get more speed and at that time these coaches will not be remain fit.

As of now, major hurdles of 130+ speed are signaling which will be fixed after Kavach.
Translate to English
Translate to Hindi
Rail News
64862 views
0

Major Accidents/Disruptions
NR/Northern
Jun 26 (20:14)   Train Services Affected Due to Development Work at Roorkee Station Yard

Exynos9611~   18670 news posts
Entry# 6106598   News Entry# 557796         Tags   Past Edits
read full article... (बड़ी खबर)देहरादून, योगनगरी ऋषिकेश से कई ट्रेन निरस्त. लालकुआं अमृतसर एक्सप्रेस ट्रेन की भी आई बड़ी अपडेट,कई का रूट बदला, कई शॉर्ट टर्मिनेट, यात्रा से पहले हो अपडेट।।

Due to development work at the Roorkee station yard on the Moradabad-Saharanpur railway line, there will be a block from June 27th to July 3rd, 2024. This will impact train operations. Some trains will be cancelled, some will run on alternative routes, and some will be controlled. Affected trains include: 04374...
more...
Dehradun-Saharanpur (June 27th-July 3rd), 04373 Saharanpur-Dehradun (June 27th-July 3rd), 22458 Dehradun-Anand Vihar (July 1st-3rd), 22457 Anand Vihar-Dehradun (July 1st-3rd), 19031 Ahmedabad-Yog Nagari (June 30th-July 2nd), 19032 Yog Nagari-Ahmedabad (July 1st-3rd), 14310 Yog Nagari-Lakshmi Bai Nagar (July 2nd-3rd), 14309 Lakshmi Bai Nagar-Yog Nagari (July 3rd-4th), 12053 Howrah-Amritsar, 14815 Shri Ganganagar-Rishikesh (June 27th-July 3rd), 14816 Rishikesh-Shri Ganganagar (June 27th-July 3rd), 22660 Yog Nagari-Kochuveli (July 1st), 22659 Kochiwali-Yamunanagar (June 28th), 15015 Muzaffarnagar-Meerut City (July 3rd), 12527 Ramnagar-Chandigarh (July 1st), 14616 Amritsar-Lal Kuan (June 29th, 60-minute control), 14309 Lakshmi Bai Nagar-Yog Nagari (June 26th, 45-minute control), 14117 Yog Nagari-Rishikesh-Lakshmi Bai Nagar (June 29th, 45-minute control), 12018 Dehradun-New Delhi (July 1st-3rd, short terminate at Saharanpur), and 12017 New Delhi-Dehradun (July 1st-3rd, short terminate at Saharanpur).

Moradabad-Saharanpur railway line pe Roorkee station yard mein development kaam chal raha hai. Iske wajah se 27 June se 3 July 2024 tak block rahega. Isse trains ka operation affected hoga. Kuch trains cancel kar di jayengi, kuch alternative route pe chalengi aur kuch control mein chalengi. Affected trains mein 04374...
more...
Dehradun-Saharanpur (27 June-3 July), 04373 Saharanpur-Dehradun (27 June-3 July), 22458 Dehradun-Anand Vihar (1 July-3 July), 22457 Anand Vihar-Dehradun (1 July-3 July), 19031 Ahmedabad-Yog Nagari (30 June-2 July), 19032 Yog Nagari-Ahmedabad (1 July-3 July), 14310 Yog Nagari-Lakshmi Bai Nagar (2 July-3 July), 14309 Lakshmi Bai Nagar-Yog Nagari (3 July-4 July), 12053 Howrah-Amritsar, 14815 Shri Ganganagar-Rishikesh (27 June-3 July), 14816 Rishikesh-Shri Ganganagar (27 June-3 July), 22660 Yog Nagari-Kochuveli (1 July), 22659 Kochiwali-Yamunanagar (28 June), 15015 Muzaffarnagar-Meerut City (3 July), 12527 Ramnagar-Chandigarh (1 July), 14616 Amritsar-Lal Kuan (29 June, 60 minutes control), 14309 Lakshmi Bai Nagar-Yog Nagari (26 June, 45 minutes control), 14117 Yog Nagari-Rishikesh-Lakshmi Bai Nagar (29 June, 45 minutes control), 12018 Dehradun-New Delhi (1 July-3 July, Saharanpur pe short terminate), and 12017 New Delhi-Dehradun (1 July-3rd, Saharanpur pe short terminate) shamil hai.
Page#    396 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy