Full Site Search  
Thu Jul 27, 2017 22:23:50 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 1538864-0
Details Edit
Large TB;
Entry# 1981185-0
Refresh Live Status (not updated)

06606/Kasaragod - Kannur Passenger Special (UnReserved)
കാസർഗോഡ് - കണ്ണൂർ മെയിൻ പാസഞ്ചർ പ്രത്യേക     कासरगोड - कण्णूर पैसेंजर स्पेशल

KGQ/Kasaragod --> CAN/Kannur Main (Cannanore)

TRAIN IS CANCELLED
Oct 01 2016 (10:15)

Train Forum

Page#    8 blog entries  next>>
  
Social
0 Followers
2323 views
Jul 10 2016 (14:43)   06607/Kannur - Kasaragod Passenger Special (UnReserved) | CAN/Kannur Main (Cannanore) (4 PFs)
 

krishnakumarpy1   201 blog posts   19 correct pred (63% accurate)
Entry# 1924941            Tags   Past Edits
Kannur-Byndoor passenger chugs with empty bogies
KANNUR: The Kannur-Mookambika road Byndoor passenger tops the list of trains making revenue loss in terms of passenger fare under the Palakkad division. The train which started as a passenger train between Kasargod and Byndoor stations in February 2015 was extended up to Kannur on July 22 last year.
“Unless the drastic revenue loss is not managed, the train is on the brink of withdrawal. The Union Railway ministry is for calling off such huge loss making trains,” said a top railway official, requesting anonymity. According to
...
more...
Shailendran, Kannur railway station manager, only less than 30 commuters board the train on working days from the terminal point.
“On Saturdays and Sundays, the number reaches 45. On an average, we are get Rs 1,000 as passenger fare on regular days and up to Rs 1,300 on week days,” he said. The schedule is being seen as the impediment in attracting commuters. Service starts at 4.15 a.m from Kannur and reaches Byndoor by 11.40 a.m. The same train (56666) returns by 1.05 p.m and reaches Kannur at 8.55 p.m. “The train timing is not beneficial to season ticket travelers who contribute the major share of passenger revenue for a passenger train,” pointed out Zonal railway users’ consultative committee member R. Prashanth Kumar.
Source : click here
To avoid the empty running of this train, the starting time from Kannur shall be revised to 5AM, instead of 4.15AM, to have a considerable number of passengers using this train and to have more convenience for the passengers.
Refer Entry# 1486250 : /blog/post/1486250 for the proposed timing

  
2098 views
Jul 10 2016 (20:00)
Guest: 7131ce16   show all posts
Re# 1924941-1            Tags   Past Edits
political lobby train by karnataka based rm

  
2041 views
Jul 10 2016 (21:25)
MCPNBR~   2101 blog posts   101 correct pred (88% accurate)
Re# 1924941-2            Tags   Past Edits
There is no wonder if TT is like this. If made 5:00 also will not have much occupancy I think, as there are trains like Maveli, Malabar, MAS-MAQ SF etc. May be after the Mail can leave Kannur to improve the collection.

  
1769 views
Jul 15 2016 (16:59)
krishnakumarpy1   201 blog posts   19 correct pred (63% accurate)
Re# 1924941-3            Tags   Past Edits
ബൈന്ദൂര്‍ പാസഞ്ചര്‍ ഗുരുവായൂരിലേക്ക് നീട്ടണമെന്ന് ആവശ്യം
പാലക്കാട് ഡിവിഷന്‍ റെയില്‍വേ മാനേജര്‍ നരേഷ് ലാല്‍വാനി കാസര്‍കോട്ടെത്തി. കാസര്‍കോട് ലോക്‌സഭാ മണ്ഡലവുമായി ബന്ധപ്പെട്ടുള്ള റെയില്‍വേ പ്രശ്‌നങ്ങള്‍ ചര്‍ച്ചചെയ്യാന്‍ പി.കരുണാകരന്‍ എം.പി. വിളിച്ച യോഗത്തില്‍ പങ്കെടുക്കാനാണ് ഡി.ആര്‍.എം. എത്തിയത്. ബൈന്ദൂര്‍ പാസഞ്ചര്‍ നഷ്ടത്തിലോടുന്നത് ഒഴിവാക്കണമെന്നതായിരുന്നു ചര്‍ച്ചയില്‍ പ്രധാനവിഷയമായി ഉയര്‍ന്നത്. ഗുരുവായൂര്‍വരെ നീട്ടിയാല്‍ നഷ്ടത്തിലോടുന്ന വണ്ടിയുടെ യാത്ര ഒഴിവാക്കാന്‍പറ്റുമെന്ന് യോഗത്തില്‍ അഭിപ്രായമുയര്‍ന്നു. അല്ലെങ്കില്‍ പുലര്‍ച്ചെയുള്ള സമയം മാറ്റി മാവേലി എക്‌സ്​പ്രസ്സിനുശേഷം പുറപ്പടണം. ഒപ്പം വണ്ടി മംഗലാപുരം സെന്‍ട്രല്‍വഴി പോകണമെന്നും ആവശ്യപ്പെട്ടു.
Source : click here

  
1850 views
Jul 15 2016 (20:15)
Guest: 7131ce16   show all posts
Re# 1924941-4            Tags   Past Edits
post in such a way that human beings can understand
  
Info Update
0 Followers
1742 views
Sep 08 2015 (10:38)   06606/Kasaragod - Kannur Passenger Special (UnReserved)
 

karthik iyer^~   2373 blog posts   10252 correct pred (61% accurate)
Entry# 1585086            Tags   Past Edits
Regional Name : കാസർഗോഡ് - കണ്ണൂർ മെയിൻ പാസഞ്ചർ പ്രത്യേക
Hindi Name : कासरगोड - कन्नूर यात्री विशेष (अनारक्षित)
The Current One is Completely Wrong.The Current one is Of ED MAS SF SPCL
Kindly #Admins / #Moderators Update

  
1641 views
Sep 08 2015 (10:42)
moderator*^~   5571 blog posts   20 correct pred (54% accurate)
Re# 1585086-1            Tags   Past Edits
Updated. Thanks.
  
Info Update
0 Followers
1672 views
Jul 12 2015 (21:06)   06607/Kannur - Kasaragod Passenger Special (UnReserved)
 

KR   471 blog posts   116 correct pred (76% accurate)
Entry# 1538864            Tags   Past Edits
#Admin, Update Train Board..

  
1494 views
Aug 04 2015 (00:18)
KR   471 blog posts   116 correct pred (76% accurate)
Re# 1538864-1            Tags   Past Edits
#admin s update train board..
  
Rail Fanning
0 Followers
4229 views
Jul 20 2015 (09:12)   06607/Kannur - Kasaragod Passenger Special (UnReserved) | ELM/Ezhimala (2 PFs)
 

MCPNBR~   2101 blog posts   101 correct pred (88% accurate)
Entry# 1545599            Tags   Past Edits
#Admn
Stop is approved for 06607/Kannur - Kasaragod Passenger Special at Ezhimala and Bekal Stations
/news/post/234465
click here
  
Info Update
0 Followers
2752 views
May 26 2015 (18:19)  
 

krishnakumarpy1   201 blog posts   19 correct pred (63% accurate)
Entry# 1486250            Tags   Past Edits
Revise the timing of CAN-KGQ-CAN Passenger, after official full extension to Kannur.
As it is a great relief that the train is extended upto Kannur and it is now serving almost complete North Malabar also. Kannur -Kasargod passenger special(06607) is leaving Kannur at 4.15am, with stops at Valapatnam (4.24am), Pappinisseri (4.29am),Kannapuram (4.37am), Payangadi (4.42am), Payyannur(4.54am), Thrikkarippur (5.01am), Chervathur (5.08am), Nileswaram (5.18am), Kanhangad (5.30am), Kottikulam(5.40am) and arrival at Kasargod at 6.35am. As continuation, from Kasargod, it will leave at 6.40AM. In return, Kasargod-Kannur passenger special(06606) is leaving Kasargod at 6.55pm, stopping at Kottikulam (7.06pm), Kanhangad (7.17pm), Nileswaram (7.21pm), Chervathur(7.39pm), Thrikkarippur (7.47pm), Payyannur (7.55pm),Payangadi (8.08pm), Kannapuram (8.18pm), Pappinissery(8.25pm), Valapatnam (8.35pm) and arrive at Kannur at 8.55pm. Between Kannur&Kasargod, Kannur-Managalore Passenger(56655) has 15
...
more...
stops(1hr&58mts), Malabar Express(16629) has 11 stops(1hr&53mts) and TVC-MAQ Express(16347) has 9 stops(1hr&39 mts) and the new Passenger Special(06607) has just 10 stops. Now the running time from Kannur to Kasargod is 2 hours&20 minutes for this train. This running time can be reduced to just 1hr 50 minutes, by leaving Kannur at 5.00AM(same time of Executive Express) and can reach Kasargod at 6.50AM and leave Kasargod just after 2 minutes. By doing so, 10 minutes can be again reduced by reducing long compensation and halting time(just 5 minutes) at Mangalore Junction and leave Managalore Junction at 8.05, as per the existing schedule. As the existing schedule is creating hard time to leave the train at 4.15AM, which is so early at Kannur. Departure from Kannur at 5AM is much convenient and arrival at Byndoor can be also the same at 11.50AM, with more passengers, as 5AM is more convenient departure time. Also, the train can be extended upto Murdeshwar(having 2 platforms), which is also pilgrimage/tourist centre just 30km north of Byndoor(having only 1 platform). The arrival at Murdeshwar can be 12.20PM and Departure to Kasargod/Kannur from Murdeshwar can be 13.30hrs, leaving Byndoor at 2PM and arriving Kasargod at 6.53PM and leaving Kasargod at 6.55PM as per the existing schedule and arriving Kannur at 8.55PM(existing schedule). So, there is a very good saving of time on both the journeys. As of now, it is running as two separate trains, the proposed timing is not possible. Once it becomes official to run as a single train, the proposed timing can be implemented and there will be a considerable great time saving and run as Kannur-Murdeshwar Passenger.

1 posts - May 2015

  
1543 views
Jun 01 2015 (21:06)
MCPNBR~   2101 blog posts   101 correct pred (88% accurate)
Re# 1486250-2            Tags   Past Edits
Yes. Can be left at 5 or 4:55

  
1519 views
Jun 03 2015 (20:08)
krishnakumarpy1   201 blog posts   19 correct pred (63% accurate)
Re# 1486250-3            Tags   Past Edits
Admin, please update the schedule for 06606/06607.
For 06606 (KGQ-CAN PASSR SPL), schedule is : KASARAGOD(KGQ)-DEP 18:55, KOTIKULAM(KQK)19:05/19:06, KANHANGAD(KZE)19:16/19:17, NILESHWAR(NLE)19:28/19:29, CHARVATTUR(CHV)19:38/19:39, TRIKARPUR(TKQ)19:46/19:47, PAYYANUR(PAY)19:54/19:55, PAYANGADI(PAZ)20:07/20:08, KANNAPURAM(KPQ)20:17/20:18, PAPPINISSERI(PPNS)20:24/20:25, VALAPATTANAM(VAPM)20:34/20:35, KANNUR(CAN)-ARR 20:55.
For 06607 (CAN-KGQ PASSR SPL), schedule is : KANNUR(CAN)-DEP 4:15, VALAPATTANAM(VAPM)4:23/4:24, PAPPINISSERI(PPNS)4:28/4:29, KANNAPURAM(KPQ)4:36/4:37, PAYANGADI(PAZ)4:41/4:42, PAYYANUR(PAY)4:53/4:54, TRIKARPUR(TKQ)5:00/5:01,CHARVATTUR(CHV)5:07/5:08, NILESHWAR(NLE)5:17/5:18,KANHANGAD(KZE)5:29/5:30, KOTIKULAM(KQK)5:39/5:40, KASARAGOD(KGQ)-ARR 6:35.

  
1709 views
Jun 04 2015 (13:43)
MCPNBR~   2101 blog posts   101 correct pred (88% accurate)
Re# 1486250-4            Tags   Past Edits
#Admin
Kindly update the above details. As of now it is just renamed in English, others still continues the old spl train details.
/train/timetable/24941/1243/1473

  
1575 views
Jun 08 2015 (22:28)
krishnakumarpy1   201 blog posts   19 correct pred (63% accurate)
Re# 1486250-5            Tags   Past Edits
Hope one more Kannur-Mangalore/Murdeshwar Passenger via MAQ will be introduced in the new Time Table, expected in October-2015, as a connection to ERS-CAN Intercity Express(CAN-MAQ) and MAQ-CAN passenger at 9.45AM from Mangalore(or from Murdeshwer at 5.15AM). These trains also will run as office time passenger trains between Mangalore and North Canara, and to reduce the long time gap between Kannur and Mangalore. There are high chances that many trains will be extended and frequency/speed increased, in the new time table, rather than waiting for the new Railway Budget, including introduction of new trains.

  
2138 views
Jun 09 2015 (15:25)
krishnakumarpy1   201 blog posts   19 correct pred (63% accurate)
Re# 1486250-6            Tags   Past Edits
Palakkad-Pollachi broad gauge line is expected to be completed within few days and running of new trains are expected by the end of June this year. More trains are expected from Mumbai/Konkan/Mangalore/Kannur in this route for Pollachi/Madurai/Rameshwaram/Tirunelveli. Hope these new trains will run in the first of July 2015 itself, not from October-2015. Now, tireless efforts are required from MPs from Kerala, Tamilnadu & Karnataka for these new trains.
Source : click here
Source : click here
Souce
...
more...
Page#    8 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.