Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

दौड़ती है हिमालय तट से सागर, हमसफ़र हर राह पर, हवाई जहाज़ों को त्याग कर, करो अक्सर, भारतीय रेल में सफर. - Arpit P

Search Forum
Post PNR
Side View; Large TB; EOG/SLR; Outside of Train; Standing;
Entry# 4331035-0
Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 4416572-0


Availability Calendar
Search OTP to SKM
Return# 17230
PDF Download

17229/Sabari Express (PT)
शबरी एक्सप्रेस

OTP/Ottappalam --> SKM/Singarayakonda

Updated: Jan 01 (00:35) by sivaprakashofficial^~
Jan 01 (00:35)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    1882 blog entries  next>>
General Travel
4171 views
5

Yesterday (20:33)   17230/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   157 blog posts
Entry# 6099247            Tags   Past Edits
2 compliments
Great Useful
𝙏𝙚𝙧𝙢𝙞𝙣𝙖𝙡 𝘾𝙝𝙖𝙣𝙜𝙚 𝙐𝙥𝙙𝙖𝙩𝙚
The following trains are subjected for the terminal change from "Secunderabad" to Charlapalli(CHZ)
12731/32 - SC TPTY Exp
12763/64 - Padmavati SF
17229/30 - Sabari Exp
Operating
...
more...
pattern-
TPTY-CHZ-TVC [PM-TPTY, OEM-CHZ, SM-TVC]

Official PR to be out soon
All the trains with OEM at SC are expected for a terminal shift from SC to CHZ

Translate to English
Translate to Hindi

4 Posts

2099 views
0

Yesterday (20:58)
Exynos9611~
Exynos9611~   15766 blog posts
Re# 6099247-5              
what about snsi sc exp hyd awb exp will these trains terminal get shifted at CHZ
Translate to English
Translate to Hindi

1714 views
0

Yesterday (21:02)
abdulrazzak123
abdulrazzak123   157 blog posts
Re# 6099247-6               Past Edits
Need to wait until the TAG 24(July 1st) is released to public, the info will be clear with it. Soon the PR will be out.
Translate to English
Translate to Hindi

1588 views
0

Yesterday (21:05)
SCRrailfan
SCRrailfan   160 blog posts
Re# 6099247-7              
No I don't think these trains get terminated at chz,even if they terminate at chz it should/will touch SC/HYB
Translate to English
Translate to Hindi

1558 views
0

Yesterday (21:07)
Exynos9611~
Exynos9611~   15766 blog posts
Re# 6099247-8              
regarding 17001/02 Sc Snsi Exp Im Sure That This Trains Terminal Might Get Shifted To CHZ
Translate to English
Translate to Hindi

1513 views
1

Yesterday (21:07)
abdulrazzak123
abdulrazzak123   157 blog posts
Re# 6099247-9              
1 compliments
Useful
HYB AWB exp is merged with GNT SC exp and to run as GNT AWB exp via- Nandyal, KRNT, KCG, SC, LPI from
30/06/2024 ex-GNT
01/07/2024 ex-AWB
No Idea about SC SNSI exp as far as now
Translate to English
Translate to Hindi
General Travel
56179 views
7

Jun 07 (04:51)   17229/Sabari Express (PT)
Railfan_SRDiv^~
Railfan_SRDiv^~   2502 blog posts
Entry# 6086954            Tags   Past Edits
Reservation suspended for the train after Oct 2nd. All RSA trains reservation are also suspended. Likely to see some changes in TT but since RSA reservation is also suspended, its likely to still have RSA after LHBfication. Will the departure change to morning 06 AM from Charlapalli ? Have to wait and watch.....

One thing is for sure. SR is lazy and waste zone. Especially MAS and TVC , they don't want to maintain no train but keep their zones lol and I say this as SR railfan lol
Translate to English
Translate to Hindi

37 Posts

26949 views
0

Jun 08 (04:15)
SaniyanSagadai~
SaniyanSagadai~   2313 blog posts
Re# 6086954-38               Past Edits
It is common slot till Villupuram and there after it is different route. Such trains are running to consider the thin caterances. You can't expect every place to get a daily train right? Plus, this kind of arrangement, other trains bound to Nagercoil/rameswaram from any other destination can easily share slot.
.
Check how marudhar express is running daily between jodhpur and varanasi in different routes. It is not wastage of slot when you use a single slot which is used for every day in majority of the route. 22715/6 should not
...
more...
be diverted. Let kurnool have biweekly connection to madurai and South of TN as well.

Translate to English
Translate to Hindi

21732 views
0

Jun 09 (11:33)
Vasu55   93 blog posts
Re# 6086954-39              
Chennai connectivity with Guntur is good
As at present we only have 1 train to chennai
The 12603/4 Chennai central Hyderabad Express

I hope for a MAS SC VB
Even
...
more...
Trains to Srirangam tiruvannamalai Kanniyakumari Rameswaram is much appreciated

I also seen one post to link GNT TPTY extend to Thanjavur and uzhavan express linked with it
PM at GNT

Translate to English
Translate to Hindi

20676 views
0

Jun 09 (14:29)
SaniyanSagadai~
SaniyanSagadai~   2313 blog posts
Re# 6086954-40              
Yes sir. Even i expected MAS SC VB via GDR TEL GNT. don't know why it did not come. TPTY GNT extension also will be good till Tiruchirapalli but will SR agree to it i wonder.
.
One special train is running 07435/36 Kacheguda - Nagercoil via guntur arunachalam. That slot is nice. Hope they make that slot daily till arunachalam and from there they can run 3 days to Nagercoil, 2 days to rameswaram and 2 days to velankanni.
Translate to English
Translate to Hindi

18891 views
1

Jun 09 (22:07)
DanielSebastian~
DanielSebastian~   4339 blog posts
Re# 6086954-41               Past Edits
1 compliments
Useful:Got ur point...👍👍
All trains except for VB are fast passengers in Kerala + most of it's route is 110 MPS and I'm not sure about speedup when all routes in SCR are heavily congested. As I said before, shortest route isn't a solution to this train. Maybe a new train.
Translate to English
Translate to Hindi

18281 views
0

Jun 09 (22:10)
DanielSebastian~
DanielSebastian~   4339 blog posts
Re# 6086954-42              
Absolutely and we shouldn't forget this is the first preference for sabarimala devotees from AP to this region and lot of keralites because, there's no other train. I wish another train via ALLP - ERS - CBE - SA - SBC - DMM would be launched
Translate to English
Translate to Hindi
General Travel
6792 views
0

Jun 17 (18:25)   17229/Sabari Express (PT)
Railfan_SRDiv^~
Railfan_SRDiv^~   2502 blog posts
Entry# 6098171            Tags   Past Edits
Reservation Suspended for so long ! Looks like SCR they themselves are confused with the decision they gotta take lol
Translate to English
Translate to Hindi

5910 views
0

Jun 17 (18:36)
SCRrailfan
SCRrailfan   160 blog posts
Re# 6098171-1              
Same case with Venkatadri express
Translate to English
Translate to Hindi

4496 views
0

Jun 17 (22:24)
Railfan_SRDiv^~
Railfan_SRDiv^~   2502 blog posts
Re# 6098171-2              
I think Venkat is not going to have any big change other than making the train LHB coach. I assume it would still run from Kacheguda to Chittor but lets see.

Sabari might undergo TT change too. Best would be to make the train leave SC or charlapalli at 06:45 am to arrive TVC at 10:30 AM and return to leave at 13:50 PM to arrive SC at 16:50 PM (as stand alone rake) with PM at SC.
Translate to English
Translate to Hindi
General Travel
62251 views
3

Jun 10 (16:53)   17230/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   157 blog posts
Entry# 6090829            Tags   Past Edits
1 compliments
Useful
Sabari Exp to be permanently short terminated at KCVL once the KCVL terminal works are completed
Source- TAG 2023-24
As the works are running with full swing at KCVL. Soon we can see sabari exp till KCVL
Translate to English
Translate to Hindi

13957 views
1

Jun 13 (14:06)
ktymrailfan
ktymrailfan   414 blog posts
Re# 6090829-1              
Less chance as daily commuters oppose this.The same messages was there for the last few TT as well
Translate to English
Translate to Hindi

6262 views
2

Jun 16 (09:15)
Railfan_SRDiv^~
Railfan_SRDiv^~   2502 blog posts
Re# 6090829-2              
This is there in every TT book - from start. It was the first train that was supposed to be shifted to KCVL but they never did.
Translate to English
Translate to Hindi
0
updating ...
2 wishes
HJ మీ ప్రయాణం ఆహ్లాదకరంగా సాగాలని కోరుకుంటున్నాను
Travelling to southern kerala. taking the UP star raptisagar superfast for an intermediate journey

99 Posts

FmtBlog
16860 views
1

Jun 09 (11:22)
Simple_Traveller~
Simple_Traveller~   4221 blog posts
Re# 6089118-100            Tags  
1 compliments
Great

3 pics

@ERN: Ernakulam Town   15km/h   38m late
@ERN: Ernakulam Town &13 km/h arriving into Ernakulam town and crossing #17229: Sabari Express
Translate to English
Translate to Hindi

More Posts
Page#    1882 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy