Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

WAP-7 - तेरे जैसा यार कहाँ , कहाँ ऐसा याराना , याद करेगी दुनियां तेरा मेरा अफसाना. - Arjun Rai

Search News
Post PNR
Large TB;
Entry# 3085535-0
Side View; Small TB; Standing at Station;
Sarnath with LHB at Ballia
Entry# 4191022-0


Availability Calendar
Search BUH to R
Return# 15160
PDF Download

15159/Sarnath Express
सारनाथ एक्सप्रेस

BUH/Burhar --> R/Raipur Junction

Updated: May 14 (18:49) by Padmakant
May 14 (18:49)

Train News

Page#    280 News Items  <<prev  next>>
वाराणसी जाने वाली कई ट्रेनों का 9 मार्च तक रूट बदला, यहां देखें लिस्ट

Due to the dismantling of foot over bridge-1 at Varanasi Junction Station, the North Railway Lucknow Division has announced changes to train routes and schedules from March 1st to 9th, 2024. These changes include platform adjustments, delayed departures, and cancellations. Several trains will be shifted to different platforms on different...
more...
dates, some will be delayed, and two trains, 03649 Baksar-Banaras MEMU Passenger Special and 03650 Banaras-Baksar MEMU Passenger Special, will be canceled on March 8th. A detailed list of affected trains, including their numbers, departure times, and delays, is provided in the article.

Varanasi Junction Station pe foot over bridge-1 ko dismantle kiye jaane ke wajah se, North Railway Lucknow Division ne 1 March se 9 March, 2024 tak train routes aur schedule mein changes announce kiya hai. Isme platform adjust, late departures aur cancellation bhi include hai. Kai trains ko different dates pe...
more...
different platforms pe shift kiya jaayega, kuchh trains late hongee, aur 03649 Baksar-Banaras MEMU Passenger Special aur 03650 Banaras-Baksar MEMU Passenger Special yeh dono trains 8 March ko cancel kar di jaayengi. Article mein affected trains ki detail list di gayi hai, jisme train numbers, departure times aur delays bhi include hain.
Ghazipur News: छपरा से वाराणसी रेलखंड पर ट्रेनों का संचालन शुरू

Train services between Chhapra and Ballia have resumed after track work on the route was completed. The Chhapra-Varanasi route now has double lines between Chhapra and Gautamsthan stations, and a third line between Chhapra Kachhari and Chhapra stations. This project, which also included electrification, allows trains to operate on the original...
more...
route bypassing the diversion that was in place during construction. The new lines underwent safety inspection and trial runs, reaching speeds of 120 km/h, before being approved for train operation. All trains from Chhapra Junction, including the 15159-15160 Chhapra-Durg Express, Chhapra-Auridhar Passenger, Sadbhavana Express to Anand Vihar, Barauni-Godiya Express, Swatantrata Senani Express, and other passenger trains, have resumed their normal schedules. The Chhapra-Lucknow and Utsarg Express trains are still not operational.

Chhapra aur Ballia ke beech rail track par kaam khatam hone ke baad, dono stations ke beech train services phir se start ho gaye hain. Chhapra-Varanasi route par ab Chhapra aur Gautamsthan stations ke beech double lines, aur Chhapra Kachhari aur Chhapra stations ke beech teesri line bhi ban chuki hai....
more...
Is project mein electrification bhi shamil tha, jisse trains ab diversion route se nahi chal kar, original route se chalegi. New lines ka safety inspection aur 120 km/h ki speed par trial run kiya gaya, jiske baad train operation ki permission di gayi. Chhapra Junction se chalne wali sabhi trains, jaise ki 15159-15160 Chhapra-Durg Express, Chhapra-Auridhar Passenger, Anand Vihar jaane wali Sadbhavana Express, Barauni-Godiya Express, Swatantrata Senani Express, aur aur bhi passenger trains, ab apni normal schedule pe chal rahi hai. Chhapra-Lucknow aur Utsarg Express trains abhi bhi operational nahi hain.
बलिया से होकर सारनाथ एक्सप्रेस सहित इन ट्रेनों का संचालन शुरू, यात्रियों में उत्साह

Train operations, including the Sarnath Express, have resumed from Chhapra Junction after being temporarily diverted. This follows the completion of track doubling between Chhapra and Gautamsthan stations and construction of a third line between Chhapra Kachhari and Chhapra stations, along with electrification. Trains will now run via Chhapra-Ballia instead of...
more...
the previous diversion route. The Railway Safety Commissioner, Pranjeev Saxena, along with officials, inspected the new tracks on Sunday. After a trial run at 120 km/h, trains were cleared to operate. All services from Chhapra Junction have resumed, including the Chhapra-Durg Express (15159-15160), the Sealdah-Ballia-Sealdah Express (13105-13106), the Chhapra-Varanasi City-Chhapra Intercity Express (15111-15112), the Chhapra-Aurihar Passenger, the Kolkata-Azamgarh-Kolkata Express (13137-13138), and the Chhapra-Jalna Special. The Varanasi City-Darbhanga Express, the Ahmedabad-Darbhanga-Ahmedabad Express (19165-19166), the Lokmanya Tilak Terminus-Raxoul Express, and the Chhapra-Surat-Chhapra Special (09065-09066) will now run via Chhapra-Ballia instead of the diversion route. The Chhapra-Lucknow and Utsarg Express services remain suspended for the time being.

Chhapra Junction se Sarnath Express aur dusre trains ka chalna fir se shuru ho gaya hai. Pehle yeh trains badle hue route se chal rahi thi. Ab Chhapra-Varanasi route pe chalne ke liye Chhapra-Gautamsthan stations ke beech dohara track aur Chhapra Kachhari aur Chhapra stations ke beech teesri line banne ka...
more...
kaam, electricity ke saath, pura ho gaya hai. Isse trains ab badle hue route se nahi chalengi, balki Chhapra-Ballia se hoke chalengi. Rail Suraksha Ayukt, Pranjeev Saxena, aur dusre officers ne Ravivaar ko naye double track aur teesri line ka inspection kiya. 120 km/h ki speed se trial run karne ke baad trains chalne ki permission de di gayi. Chhapra Junction se sabhi services fir se shuru ho gayi hain, jisme Chhapra-Durg Express (15159-15160), Sealdah-Ballia-Sealdah Express (13105-13106), Chhapra-Varanasi City-Chhapra Intercity Express (15111-15112), Chhapra-Aurihar Passenger, Kolkata-Azamgarh-Kolkata Express (13137-13138), aur Chhapra-Jalna Special bhi shamil hain. Varanasi City-Darbhanga Express, Ahmedabad-Darbhanga-Ahmedabad Express (19165-19166), Lokmanya Tilak Terminus-Raxoul Express, aur Chhapra-Surat-Chhapra Special (09065-09066) ab badle hue route se nahi chalengi, balki Chhapra-Ballia se hoke chalengi. Chhapra-Lucknow aur Utsarg Express ka chalna abhi tak band hai.
फिर आई, स्टॉपेजेस के पुनर्बहाली करने की बहार!

Indian Railways is reintroducing many stops that were temporarily discontinued due to the transition period. Some stops are also being added based on passenger demand. This includes the addition of a stop at Gandhinagar Jaipur for the 20977/78 Ajmer Delhi Cant Ajmer Vande Bharat Express. The 12321/22 Howrah Chhatrapati Shivaji Maharaj...
more...
Terminus Mumbai Howrah Mail will have a stop at Parsabad in the Dhanbad division starting January 15, 2024, in both directions. Other additions include a stop at Mazhgava for the 15159/60 Chhapra Durg Chhapra Daily Express, and stops at Jatwar for the 11071/72 Lokmanya Tilak Terminus Ballia Lokmanya Tilak Terminus Kamayani Daily Express and the 15205/06 Lucknow Jabalpur Lucknow Chitrakoot Daily Express. The 18205/06 Durg Nautanwa Durg Weekly Express will have a stop at Maihar. These stops are temporary for a duration of 6 months. The 15053/54 Lucknow Chhapra Lucknow Daily Express will have a stop at Karimuddinpur station and the 15231/32 Barauni Gondia Barauni Daily Express will have a stop at Yusufpur. The exact dates for these stops will be announced by the local rail administration. Passengers can take advantage of these temporary stops, which are subject to review based on increased revenue at these stations. If the revenue increases sufficiently, these temporary stops may be made permanent.

Indian Railways transition period ke wajah se band kiye gaye kai stops ko fir se start kiya ja raha hai. Kuchh stops, passengers ke demand ke baad add kiye ja rahe hain. Isme 20977/78 Ajmer Delhi Cant Ajmer Vande Bharat Express ke liye Gandhinagar Jaipur me stop add karna bhi shamil...
more...
hai. 12321/22 Howrah Chhatrapati Shivaji Maharaj Terminus Mumbai Howrah Mail ko 15/1/2024 se dono directions me Dhanbad division ke Parsabad me stop milega. Iske alawa, 15159/60 Chhapra Durg Chhapra Daily Express ko Mazhgava me stop, aur 11071/72 Lokmanya Tilak Terminus Ballia Lokmanya Tilak Terminus Kamayani Daily Express aur 15205/06 Lucknow Jabalpur Lucknow Chitrakoot Daily Express ko Jatwar me stop milega. 18205/06 Durg Nautanwa Durg Weekly Express ko Maihar me stop milega. Ye sabhi stops 6 months ke liye temporary hain. 15053/54 Lucknow Chhapra Lucknow Daily Express ko Karimuddinpur station pe stop milega aur 15231/32 Barauni Gondia Barauni Daily Express ko Yusufpur me stop milega. In stops ki exact dates local rail administration announce karega. Passengers in temporary stops ka fayda uthaa sakte hain, aur ye stops revenue increase ke baad permanent bhi ho sakte hain.
सारनाथ एक्सप्रेस सहित अन्य ट्रेनों का छपरा जंक्शन से संचालन शुरू

The operation of trains including the Sarnath Express from Chhapra Junction has resumed. The doubling of the track between Chhapra and Gautamasthan stations and the construction of a third line between Chhapra Kachhari and Chhapra stations on the Chhapra-Varanasi route has been completed along with electrification. The Commissioner of Railway Safety,...
more...
Pranjeev Saxena, conducted a safety inspection of the new doubled rail section and third line on Sunday, along with the Chief Administrative Officer Construction, SC Srivastava, Divisional Railway Manager Vineet Kumar Srivastava, and other officials. After conducting trials at a speed of 120 kmph on the new line on Sunday evening, the operation of trains was allowed. All trains that had been suspended in the past few days have resumed operations from Chhapra Junction. This includes trains like the 15159-15160 Chhapra-Durg Express, 13105-13106 Sealdah-Ballia-Sealdah Express, 15111-15112 Chhapra-Varanasi City-Chhapra Intercity Express, Chhapra-Aurihar Passenger, 13137-13138 Kolkata-Azamgarh-Kolkata Express, Chhapra-Jalna Special Train, Varanasi City-Darbhanga Express, 19165-19166 Ahmedabad-Darbhanga-Ahmedabad Express, Lokmanya Tilak Terminus-Raxual Express, and 09065-09066 Chhapra-Surat-Chhapra Special Train. The Varanasi City-Darbhanga Express, 19165-19166 Ahmedabad-Darbhanga-Ahmedabad Express, Lokmanya Tilak Terminus-Raxual Express, and 09065-09066 Chhapra-Surat-Chhapra Special Train will now operate via Chhapra-Ballia instead of their previous route. The Public Relations Officer of the Varanasi Division, Ashok Kumar, has stated that the Chhapra-Lucknow and Utsarg Expresses will not operate for now.

Chhapra Junction se Sarnath Express aur dusre trains ka chalna start ho gaya hai. Chhapra-Varanasi route par chalne ke liye aasan banane ke liye Chhapra-Gautamasthan stations ke beech double track aur Chhapra Kachhari-Chhapra stations ke beech teesri line bana di gayi hai. Iske saath saath, electrification bhi poora ho gaya hai....
more...
R Sunday ko, Commissioner of Railway Safety, Pranjeev Saxena, ne nayi double line aur teesri line ka safety check kiya. Isme, Chief Administrative Officer Construction, SC Srivastava, Divisional Railway Manager Vineet Kumar Srivastava, aur aur bhi officials saath the. Sunday ki shaam ko, nayi line par 120 kmph ki speed se trials kiye gaye, aur uske baad trains chalane ki permission de di gayi. Iske saath, pehle kuchh dinon se band chal rahi sabhi trains Chhapra Junction se chalna shuru kar di gayi hain. Isme 15159- 15160 Chhapra-Durg Express, 13105- 13106 Sealdah-Ballia-Sealdah Express, 15111- 15112 Chhapra-Varanasi City-Chhapra Intercity Express, Chhapra-Aurihar Passenger, 13137-13138 Kolkata-Azamgarh-Kolkata Express, Chhapra-Jalna Special Train, Varanasi City-Darbhanga Express, 19165- 19166 Ahmedabad-Darbhanga-Ahmedabad Express, Lokmanya Tilak Terminus-Raxual Express, aur 09065- 09066 Chhapra-Surat-Chhapra Special Train bhi shamil hain. Varanasi City-Darbhanga Express, 19165- 19166 Ahmedabad-Darbhanga-Ahmedabad Express, Lokmanya Tilak Terminus-Raxual Express, aur 09065- 09066 Chhapra-Surat-Chhapra Special Train ab apne purane route ke bajay Chhapra-Ballia se hoke chalegi. Varanasi Division ke Public Relations Officer, Ashok Kumar, ne bataya hai ki abhi Chhapra-Lucknow aur Utsarg Expresses nahi chalengi.
Page#    280 News Items  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy