Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Eat-Sleep-Railfanning 🔄 Repeat - Shankar Mehani

Search News
Post PNR
Side View; EOG/SLR; Outside of Train; Moving Straight;
Entry# 3818842-0
Night Pic; Side View; Small TB; 3 AC; Outside of Train; Standing at Station;
Entry# 5459877-721


Availability Calendar
Search KPG to AD
Return# 12627
PDF Download

12628/Karnataka Express (PT)
Other Names: KK
कर्नाटक एक्सप्रेस

KPG/Kopargaon --> AD/Adoni

Updated: Aug 02 (17:34) by NamanL^~
Aug 02 (17:34)

Train News

Page#    123 News Items  next>>
read full article... Jhansi News: बारिश से झांसी-बीना रेलमार्ग जलमग्न, चार घंटे प्रभावित रहीं ट्रेनें

On Wednesday morning, heavy rainfall flooded the Jhansi-Bina railway line, causing disruption to train services. 16 passenger trains were stalled, along with 6 freight trains. Passenger trains were allowed to proceed at a slower pace. The up and down tracks were affected for 4 hours and 18 minutes due to the...
more...
rainfall. The Dhorra-Bina rail section, situated between hills, has a deeper track compared to others. This led to water accumulation due to the heavy rainfall starting at 4 am, eventually reaching a foot above the track level. Consequently, 16 express, superfast, and mail trains, including the Malwa and South Express, were impacted. 6 freight trains were also affected. The disruption to train services lasted from 5:10 am to 9:28 am, a total of 4 hours and 18 minutes.

Wednesday subah, Jhansi-Bina railway line pe bahut zyada baarish hone ki wajah se track paani me doob gaya. Isse 16 passenger trains aur 6 freight trains chalne se ruk gaye. Passenger trains ko slow speed pe aage badhaya gaya. Baarish ki wajah se up and down track 4 ghante 18 minute...
more...
tak band raha. Dhorra-Bina rail section, jo dono taraf se pahadon se ghira hua hai, dusre tracks se zyada gehrai wala hai. Is wajah se subah 4 baje se shuru hui baarish ki wajah se paani jama ho gaya aur track se ek foot upar tak aa gaya. Track pe paani hone ki wajah se Malwa, South Express aur 16 express, superfast aur mail trains ruk gayi. 6 freight trains bhi apna time pe nahi chal payi. Track pe paani hone ki wajah se subah 5:10 se 9:28 tak 4 ghante 18 minute tak train chalne se ruk gayi.
Jul 06 (19:52) Khandwa Railway Station Upgrades with Automated System, Train Schedules Affected (www.bhaskar.com)
IR Affairs
WR/Western
57867 views
0

News Entry# 559216   
  Past Edits
Jul 06 2024 (19:52)
Station Tag: Omkareshwar Road/OM added by Exynos9611~/2099623

Jul 06 2024 (19:52)
Station Tag: Sanawad/SWD added by Exynos9611~/2099623

Jul 06 2024 (19:52)
Station Tag: Khandwa Junction/KNW added by Exynos9611~/2099623
read full article... खंडवा में भुसावल-इटारसी रूट से जुड़ेगी अकोला-इंदौर रेल लाइन

The Khandwa railway station is undergoing installation of an automatic NI system for improved train operations. This system, expected to be operational by July 22nd, will connect the Akola-Indore rail line with the Bhusawal-Itarsi route via track interlocking. The new system aims to enhance efficiency, including connecting Platform 3 (Indore...
more...
route) to Platform 5 (Bhusawal-Sanawad route), enabling MEMU train operations between Bhusawal and Sanawad via Khandwa, a request made by local residents and MP Gyaneshwar Patil to the Railway Minister. Currently, MEMU trains are routed via Mathela to Bhusawal for maintenance. The new system will also allow trains to access Platforms 1, 3, and 6, reducing time spent on shunting and avoiding delays caused by manual operations. This computerized system is expected to significantly decrease the chances of accidents. The schedule for Khandwa-Sanawad MEMU and Bhir Shuttle trains has been suspended until July 22nd, with individual train schedules being adjusted daily. Trains traveling via Khandwa to Mumbai, Delhi, Uttar Pradesh, and Bihar will operate as per schedule until July 8th. However, six trains, including the 11057 CMS-Amritsar Express, 22177 CMS-Banaras, 12720 Hyderabad-Jaipur, 22538 LTT-Gorakhpur, 12628 Nanded, and 22130 Ayodhya Cantt-LTT will experience delays on July 8th and 9th.

Khandwa railway station pe automatic NI system lagane ka kaam shuru ho gaya hai, jiska matlab hai ki train operations bahut hi behtar honge. yeh system 22 July tak khul jaayega aur Akola-Indore rail line ko Bhusawal-Itarsi route se jod dega. Isse Platform 3 (Indore route) ko Platform 5 (Bhusawal-Sanawad...
more...
route) se jodne ka bhi fayda hoga, jisse Khandwa se Bhusawal aur Sanawad ke beech MEMU train chalane ka rasta khulega. yeh chahat local logo aur MP Gyaneshwar Patil ne Railway Minister se ki thi. Abhi MEMU trains ko maintenance ke liye Bhusawal jane ke liye Mathela se ho kar le jaana padta hai. Naya system Platforms 1, 3, aur 6 pe trains aaane jaane ki imkan dega, jisse shunting ke samay mein kami aayegi aur accident ke chances bhi bahut kam honge. 22 July tak Khandwa-Sanawad MEMU aur Bhir Shuttle trains band hain, aur har din ke liye alag alag trains ka schedule change kiya ja raha hai. 8 July tak Mumbai, Delhi, UP, aur Bihar jaane wali trains apne time pe chalengi, lekin 8-9 July ko 6 trains, jisme 11057 CMS-Amritsar Express, 22177 CMS-Banaras, 12720 Hyderabad-Jaipur, 22538 LTT-Gorakhpur, 12628 Nanded, aur 22130 Ayodhya Cantt-LTT, apne time se der se chalengi.
Jun 28 (19:30) IRCTC Launches Bengaluru-Shirdi Tour Package for Pilgrimage Journey (kannada.hindustantimes.com)
IR Affairs
SWR/South Western
17495 views
0

News Entry# 558052   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... ಐಆರ್‌ಸಿಟಿಸಿ ಟೂರ್ ಪ್ಯಾಕೇಜ್: ಜೂನ್ 27ಕ್ಕೆ ಬೆಂಗಳೂರು-ಶಿರಡಿ ರೈಲು ಪ್ರವಾಸ; ಟಿಕೆಟ್ ದರ ಸೇರಿ ಪ್ರಮುಖ ಮಾಹಿತಿ ಇಲ್ಲಿದೆ

IRCTC has launched a new tour package for a pilgrimage journey from Bengaluru to Shirdi. The package includes visits to Shirdi Sai Baba Temple and Shani Shingnapur Temple. The tour starts from Bengaluru on July 27th, 2024, and returns on July 30th, 2024. The cost of the tour varies depending on...
more...
the class of travel: Comfort Class (3AC) starts at INR 10,460 for a single traveler, Standard Class (SL) starts at INR 7,980. The tour includes travel by train (Train No. 12627 and 12628), hotel accommodation, and meals. The tour is organized by IRCTC and details can be found on their website irctc.com.

IRCTC ne Bengaluru se Shirdi tak ka ek nayaa tour package launch kiya hai. Is package mein Shirdi Sai Baba Temple aur Shani Shingnapur Temple ka darshan bhi shamil hai. Tour 27 July 2024 ko Bengaluru se start hoga aur 30 July 2024 ko khatam hoga. Tour ka price travel class...
more...
ke hisaab se alag-alag hai: Comfort Class (3AC) mein single traveler ke liye 10,460 INR se start hota hai, Standard Class (SL) mein 7,980 INR se start hota hai. Tour mein train (Train No. 12627 aur 12628), hotel stay aur khana shamil hai. Yeh tour IRCTC dwara organise kiya gaya hai aur iski details aap unki website irctc.com par dekh sakte hain.
read full article... Bina Railway News: इंजन के पेंटो में ओएचई वायर फंसकर टूटा, 20 से अधिक ट्रेनें हुईं घंटों लेट, यात्री परेशान

A broken overhead wire between Dhorra and Jakhalon stations on the Bina-Jhansi railway track caused major delays for over 20 trains. The wire snapped around 3 AM on Thursday when the pantograph of the Khajuraho-Ambedkar Nagar Express train got stuck. Trains were delayed by 5 to 10 hours, causing significant inconvenience...
more...
to passengers. This incident follows a transformer failure on the same track four days prior, which also disrupted train services for a few hours. Affected trains include the Sachkhand Express (12716), Jhelum Express (11078), Kerala Express (12626), H. Nizamuddin-Rani Kamalapati (12156), Tulsi Express (22130), Karnataka Express (12628), Malwa Express (12920), H. Nizamuddin-Sikandrabad (12184), Tiruvananthapuram-H. Nizamuddin, Samta Express (12807), and Chhattisgarh Express (18237).

Bina aur Jhansi railway track pe Dhorra aur Jakhalon station ke beech mein Wednesday raat ko overhead wire tut gaya. Yeh incident Khajuraho-Ambedkar Nagar Express ke pantograph se wire phansne ke wajah se hua. Is incident se 20 se zyada trains late hui, aur 5 se 10 hours tak passengers ko...
more...
problem hui. Isse pehle, chaar din pehle bhi same track pe transformer kharab ho gaya tha, jisse kuchh hours ke liye train services affected hui thi. Affected trains mein Sachkhand Express (12716), Jhelum Express (11078), Kerala Express (12626), H. Nizamuddin-Rani Kamalapati (12156), Tulsi Express (22130), Karnataka Express (12628), Malwa Express (12920), H. Nizamuddin-Sikandrabad (12184), Tiruvananthapuram-H. Nizamuddin, Samta Express (12807), and Chhattisgarh Express (18237) shamil hain.
Mar 02 (16:43) Indian Railways Forced to Pay Contractor 36 Lakh Rupees After Court Threatens to Seize Karnataka Express Engine (www.aajtak.in)
47165 views
0

News Entry# 543572   
  Past Edits
Mar 02 2024 (16:43)
Station Tag: Khandwa Junction/KNW added by AmitJha^~/737839

Mar 02 2024 (16:43)
Train Tag: Karnataka Express/12628 added by AmitJha^~/737839

Mar 02 2024 (16:43)
Train Tag: Karnataka Express/12627 added by AmitJha^~/737839
read full article... अजब-गजब है ये मामला...कर्नाटक एक्सप्रेस ट्रेन के इंजन की कुर्की का खौफ, Railway ने केटरिंग ठेकेदार को लौटाए ₹36.50 लाख

A catering contractor in Khandwa, Madhya Pradesh, was illegally charged 36.64 lakh rupees by the Indian Railways as rent for a kitchen and store room. The contractor challenged this in court, arguing that the rent was unjustified and the space had been provided for use since 1956 without any previous rent...
more...
demands. The court ruled in favor of the contractor, declaring the rent demand illegal. When the contractor demanded the money back, the Railways initially resisted but eventually paid the amount after the court threatened to seize assets, including the engine of the Karnataka Express (train number 12628), station master's office furniture, and air conditioners. This incident highlights the Railways' questionable practices in charging exorbitant fees and using pressure tactics against licensees.

Madhya Pradesh ke Khandwa mein ek catering contractor se Railway ne license fees ke alawa 36 lakh 64 hazar 128 rupees rent ke naam pe galat tarike se vasooli ki thi. Contractor ne court mein yeh case challange kiya aur bola ki yeh rent bekaar hai aur usse 1956 se yeh...
more...
space use karne ke liye diya gaya tha bina koi rent diye. Court ne contractor ka saath diya aur rent demand ko galat bola. Jab contractor ne paise vapis maange, toh Railway ne pehle mana kiya but fir court ne engine of Karnataka Express (train number 12628), station master ke office ke furniture aur air conditioners seize karne ki dhamki di, toh Railway ne paise de diye. Yeh case Railway ki galat practice ko highlight karta hai jismein woh bahut zyada fees lete hain aur licensees pe pressure daalte hain.
Page#    123 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy