Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Kanchan Kanya Express: ডুয়ার্সের রাণী - Joydeep Roy

Search Trains
Post PNR
Availability Calendar
Search OKHA to MMM
Return# 16733
PDF Download

16734/Okha - Rameswaram Weekly Express (PT)
ओखा - रामेश्वरम साप्ताहिक एक्सप्रेस

OKHA/Okha --> MMM/Mandapam

Updated: Aug 24 (13:26) by SatavahanaSFExp^
Aug 24 (13:26)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between OKHA and MMM is 564 km (18%) shorter.
Travel Time: 57h 13m     45 halts
Distance: 3136 km     Avg Speed: 55 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 08:40
Okha/OKHA 
Platform# --
 
 
Tue
 
 
 
 
Arrives @ 17:53 +2 nights
MMM/Mandapam 
Platform# 2
 
 
 
 
Thu
 
 
Type: Mail/Express
Rake Zone: SR/Southern
Latest News
(You need to double-check/verify this info yourself)
T.No.16734 OKHA-RMM Exp JCO 08.10.24 is Diverted via KRR-TPJ-PDKT-KKDI-MNM. Skipping stoppages: DG,MDU, Additional stoppages: TPJ, KKDI. ▪️Reduction of One 3 AC coach and Permanent Augmentation of two UR coaches w.e.f 10/12/2024 ex: OKHA
Mon Sep 30, 2024 (07:24PM)
News History
Reduction of one 3 AC coach and permanent augmentation of two GN coaches wef 10.12.24 ex OKHA
Mon Aug 26, 2024 (12:32PM)
Run with LHB Coaches w.e.f. 12/03/2024 including 2 AC II TIER, 8 AC III TIER, 6 Sleeper, 2 General Class, 1 Pantry Car, 1 SLR, 1 EOG, Total 21 LHB Coaches
Tue Mar 05, 2024 (10:34PM)
This train is partially cancelled between MMM to RMM, New Destination is MMM.
Thu Nov 23, 2023 (06:03PM)
Train No 16734 Okha – Rameswaram Express JCO 22.11.2022 & 29.11.2022 via Surat- Vasai Road- Kalyan Jn- Igatpuri- Manmad Jn-Ankai
Thu Nov 24, 2022 (04:32PM)
.
Wed Jan 19, 2022 (08:58AM)
◉ JCF 13.07.2021 to 14.09.2021 will be short terminated at Mandapam due to ongoing maintenance works on Pamban Bridge
Mon Jul 12, 2021 (03:37PM)
3 Follows
Rating: 3.8/5 (81 votes)
cleanliness - good (13)
punctuality - good (14)
food - good (13)
ticket avbl - good (15)
u/r coach - good (7)
railfanning - good (13)
safety - good (13)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Tue Nov 14, 2006
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at JAM, RJT, SUNR, ADI, ND, ANND, BRC,...
more...
ST, NED, NZB, KCG, MBNR, KRNT, KPD, SA, DG, MDU & RMD.
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 UR
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 PC
 18
 A2
 17
 B1
 16
 B2
 15
 B3
 14
 B4
 13
 B5
 12
 B6
 11
 B7
 10
BE1
 19
 A1
 20
 UR
 21
EOG
  JL
RSA - Rake Sharing
No RSA. Single Dedicated Rake. PM @ MDU & SM @ OKHA.
Loco/Rake Reversals
JL/Jalgaon Junction

Show ALL intermediate Stations

45 halts. 476 intermediate Stations between Okha and Mandapam
#1
0.0 km
/--/
Zone: WR
Speed: 56
Elev: 0m

08:40
Day: 1
29.0 km
3 intermediate stations
00:31
#2
29.0 km
/--/
Zone: WR
PF# 1
Speed: 74
Elev: 7m
09:11
09:16
Day: 1
41.8 km
3 intermediate stations
00:34
#3
70.8 km
/--/
Zone: WR
Speed: 87
09:50
09:51
Day: 1
42.3 km
4 intermediate stations
00:29
#4
113.1 km
/--/
Zone: WR
Speed: 65
10:20
10:22
Day: 1
54.4 km
7 intermediate stations
00:50
#5
167.4 km
%==%
Zone: WR
PF# 1
Speed: 17
Elev: 8m
11:12
11:17
Day: 1
8.6 km
0 intermediate stations
00:31
#6
176.0 km
%==%
Zone: WR
Speed: 54
Elev: 15m
11:48
11:50
Day: 1
76.0 km
8 intermediate stations
01:25
#7
251.9 km
/==/
Zone: WR
PF# 3
Speed: 66
Elev: 119m
13:15
13:20
Day: 1
42.0 km
7 intermediate stations
00:38
#8
293.9 km
/==/
Zone: WR
PF# 2
Speed: 72
Elev: 86m
13:58
14:00
Day: 1
74.1 km
9 intermediate stations
01:02
#9
368.0 km
/==/
Zone: WR
PF# 3
Speed: 59
Elev: 72m
15:02
15:04
Day: 1
65.4 km
12 intermediate stations
01:06
#10
433.4 km
/==/
Zone: WR
PF# 2
Speed: 50
16:10
16:12
Day: 1
65.2 km
14 intermediate stations
01:18
#11
498.6 km
/==/
Zone: WR
PF# 7
Speed: 54
Elev: 52m
17:30
17:40
Day: 1
Remote Location Quota Starting and Charting Station.
45.8 km
11 intermediate stations
00:51
#12
544.4 km
/==/
Zone: WR
PF# 1
Speed: 94
Elev: 37m
18:31
18:33
Day: 1
Experimental basis halt w.e.f 19.03.24 to Till further advice.
18.8 km
3 intermediate stations
00:12
#13
563.1 km
/==/
Zone: WR
PF# 4
Speed: 63
Elev: 40m
18:45
18:47
Day: 1
35.5 km
9 intermediate stations
00:34
#14
598.6 km
/==/
Zone: WR
PF# 1
Speed: 75
Elev: 36m
19:21
19:31
Day: 1
129.7 km
25 intermediate stations
01:44
#15
728.3 km
/==/
Zone: WR
PF# 2
Speed: 74
Elev: 59m
21:15
21:20
Day: 1
Remote Location Quota Starting and Charting Station.
160.8 km
25 intermediate stations
02:10
#16
889.2 km
/==/
Zone: WR
Speed: 55
Elev: 203m
23:30
23:40
Day: 1
150.0 km
18 intermediate stations
02:45
#17
1039.1 km
/==/
Zone: CR
PF# 5
Speed: 66
Elev: 209m
02:25
02:35
Day: 2
Rake Reversal (the train reverses direction)
Remote Location Quota Starting and Charting Station.
160.0 km
19 intermediate stations
02:25
#18
1199.1 km
/==/
Zone: CR
PF# 4
Speed: 32
Elev: 558m
05:00
05:05
Day: 2
22.9 km
4 intermediate stations
00:48
#19
1222.0 km
%==%
Zone: SCR
PF# 1
Speed: 51
05:53
05:55
Day: 2
88.8 km
7 intermediate stations
01:45
#20
1310.8 km
%==%
Zone: SCR
Speed: 60
Elev: 556m
07:40
07:45
Day: 2
Remote Location Quota Starting and Charting Station.
62.7 km
6 intermediate stations
01:03
#21
1373.5 km
/--/
Zone: SCR
Speed: 64
Elev: 502m
08:48
08:50
Day: 2
Xing with 17688/Marathwada Express | Wed
114.4 km
12 intermediate stations
01:48
#22
1487.9 km
/--/
Zone: SCR
Speed: 49
Elev: 412m
10:38
10:40
Day: 2
Xing with 12715/Sachkhand Express | Wed
28.4 km
2 intermediate stations
00:35
#23
1516.4 km
/==/
Zone: SCR
Speed: 52
Elev: 382m
11:15
11:20
Day: 2
30.4 km
3 intermediate stations
00:35
#24
1546.8 km
/==/
Zone: SCR
Speed: 23
Elev: 362m
11:55
12:00
Day: 2
Remote Location Quota Starting and Charting Station.
22.4 km
3 intermediate stations
00:58
#25
1569.2 km
/==/
Zone: SCR
Speed: 68
Elev: 372m
12:58
13:00
Day: 2
88.3 km
12 intermediate stations
01:18
#26
1657.5 km
%==%
Zone: SCR
Speed: 71
Elev: 383m
14:18
14:20
Day: 2
52.1 km
4 intermediate stations
00:44
#27
1709.6 km
/--/
Zone: SCR
Speed: 47
15:04
15:05
Day: 2
113.9 km
34 intermediate stations
02:25
#28
1823.5 km
/==/
Zone: SCR
Speed: 65
Elev: 489m
17:30
17:40
Day: 2
Remote Location Quota Starting and Charting Station.
105.9 km
21 intermediate stations
01:38
#29
1929.4 km
%==%
Zone: SCR
Speed: 61
Elev: 509m
19:18
19:20
Day: 2
130.6 km
22 intermediate stations
02:08
#30
2060.0 km
%==%
Zone: SCR
Speed: 28
Elev: 294m
21:28
21:30
Day: 2
54.1 km
6 intermediate stations
01:55
#31
2114.1 km
%==%
Zone: SCR
Speed: 69
Elev: 424m
23:25
23:30
Day: 2
172.2 km
22 intermediate stations
02:29
#32
2286.2 km
/==/
Zone: SCR
PF# 1
Speed: 62
Elev: 166m
01:59
02:00
Day: 3
39.4 km
4 intermediate stations
00:38
#33
2325.6 km
/==/
Zone: SCR
Speed: 44
Elev: 137m
02:38
02:40
Day: 3
125.4 km
16 intermediate stations
02:50
#34
2451.0 km
/==/
Zone: SCR
Speed: 20
Elev: 115m
05:30
05:35
Day: 3
9.8 km
1 intermediate stations
00:30
#35
2460.8 km
/==/
Zone: SCR
Speed: 51
Elev: 163m
06:05
06:10
Day: 3
Remote Location Quota Starting and Charting Station.
104.7 km
13 intermediate stations
02:03
#36
2565.6 km
/--/
Zone: SR
PF# 4
Speed: 61
Elev: 215m
08:13
08:15
Day: 3
84.5 km
12 intermediate stations
01:23
#37
2650.0 km
/==/
Zone: SR
Speed: 72
Elev: 400m
09:38
09:40
Day: 3
120.5 km
19 intermediate stations
01:40
#38
2770.5 km
/==/
Zone: SR
PF# 1,3
Speed: 54
Elev: 280m
11:20
11:30
Day: 3
25.9 km
1 intermediate stations
00:29
#39
2796.4 km
/--/
Zone: SR
PF# 1
Speed: 53
Elev: 222m
11:59
12:00
Day: 3
25.7 km
2 intermediate stations
00:29
#40
2822.1 km
/--/
Zone: SR
PF# 2
Speed: 53
Elev: 186m
12:29
12:30
Day: 3
33.9 km
3 intermediate stations
00:38
#41
2856.0 km
/--/
Zone: SR
PF# 4
Speed: 54
Elev: 120m
13:08
13:10
Day: 3
74.0 km
5 intermediate stations
01:22
#42
2929.9 km
/--/
Zone: SR
PF# 4
Speed: 83
Elev: 280m
14:32
14:35
Day: 3
Remote Location Quota Starting and Charting Station.
62.3 km
9 intermediate stations
00:45
#43
2992.2 km
/==/
Zone: SR
PF# 2
Speed: 52
Elev: 133m
15:20
15:25
Day: 3
Remote Location Quota Starting and Charting Station.
47.8 km
5 intermediate stations
00:55
#44
3040.0 km
/--/
Zone: SR
PF# 2
Speed: 60
Elev: 67m
16:20
16:25
Day: 3
Loco change from Electric to Diesel.
23.9 km
1 intermediate stations
00:24
#45
3063.9 km
/--/
Zone: SR
PF# 1
Speed: 77
Elev: 42m
16:49
16:50
Day: 3
35.7 km
1 intermediate stations
00:28
#46
3099.7 km
%--%
Zone: SR
PF# 1,2
Speed: 66
Elev: 7m
17:18
17:20
Day: 3
36.4 km
4 intermediate stations
00:33
#47
3136.1 km
%--%
Zone: SR
PF# 2

Elev: 4m
17:53

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy