Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Start RailFanning NOW, learn to live - before you run out of time - Varun

Search Trains
Post PNR
Medium; Front-facing; Large TB; EOG/SLR; Outside of Train; Standing at Station;
HDR
Entry# 2331689-0
Medium; Side View; Small TB; 3 AC; Standing at Station;
Entry# 4221861-0


Availability Calendar
Search DGR to BSB
Return# 22324
PDF Download

22323/Shabd Bhedi Express (PT)
शब्दभेदी एक्सप्रेस

DGR/Durgapur --> BSB/Varanasi Junction

Updated: Apr 18 (20:14) by guest
Apr 18 (20:14)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between DGR and BSB is 1 km (0%) shorter.
Travel Time: 9h 7m     4 halts
Distance: 524 km     Avg Speed: 58 km/hr
Max Permissible Speed: 130 km/hr between DKAE/Dankuni Junction and FOCM/Flyover Cabin Mughal Sarai
Departs @ 00:58
Durgapur/DGR 
Platform# 3
 
 
 
 
 
Fri
 
Arrives @ 10:05
BSB/Varanasi Jn 
Platform# 1
 
 
 
 
 
Fri
 
Type: SuperFast
Rake Zone: ER/Eastern
Latest News
(You need to double-check/verify this info yourself)
One additional AC-3 tier Economy coach will be augmented with 22323/22324 Kolkata – Ghazipur City –Kolkata Shabdbhedi Express leaving Kolkata from 10.10.2024 to 31.10.2024 & leaving Ghazipur City from 11.10.2024 to 01.11.2024. Additional 80 berths will be generated in each trip. The train will run with 21...
more...
coaches instead of 20 coaches.
Thu Oct 10, 2024 (08:52AM)
News History
JCO 12th December, 2024 will be permanently diverted between Varanasi - Ghazipur City via Jaunpur with stoppage at Jaunpur.
Sun Aug 18, 2024 (06:20PM)
Will Remain Cancelled Due To Yard Remodeling At BSB On - 31/08/23, 07/09/23, 14/09/23, 21/09/23, 28/09/23, 05/10/23, 12/10/23
Sun Aug 27, 2023 (02:44PM)
Will Be Short Terminated At Varanasi City/BCY instead of Its Scheduled Destination Gazipur City/GCT, J.C.O;- 22.06.2023 (Thursday) For Yard Remodeling Of Aunrihar Station & Connection for Patch Doubling Work Of Aunrihar - Sadat (19 Km) in Aunrihar - Bhatni Section.
Wed Jun 21, 2023 (09:33PM)
Augmentation of One temporary SL coach and One temporary 3A coach from Kolkata w.e.f. 29/09/2022 to 27/10/2022.
Wed Sep 28, 2022 (10:18AM)
📢⚟ JCO 04.03.21, 11.03.21 & 18.03.21 will be short terminated at BCY due to pre-NI and NI work between NDJ and GCT.
Wed Mar 03, 2021 (08:20PM)
1 Follows
Rating: 4.8/5 (110 votes)
cleanliness - excellent (19)
punctuality - excellent (19)
food - good (16)
ticket avbl - excellent (19)
u/r coach - excellent (16)
railfanning - excellent (19)
safety - excellent (18)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Mon Nov 14, 2016
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
GEN
  5
GEN
  6
 S1
  7
 S2
  8
 S3
  9
 S4
 18
 B3
 17
 B2
 16
 B1
 15
 M3
 14
 M2
 13
 M1
 12
 S7
 11
 S6
 10
 S5
 19
 A1
 20
EOG
 BSB
Loco/Rake Reversals
BSB/Varanasi Junction

Show ALL intermediate Stations

4 halts. 111 intermediate Stations between Durgapur and Varanasi Junction
#1
-162.4 km
/==/
Zone: ER
PF# 4
Speed: 75
Elev: 6m

22:45
Day: 1
98.7 km
36 intermediate stations
01:19
#2
-63.8 km
/==/
Zone: ER
PF# 1,2
Speed: 77
Elev: 36m
00:04
00:06
Day: 2
63.8 km
9 intermediate stations
00:50
#3
0.0 km
/==/
Zone: ER
PF# 3
Speed: 77
Elev: 73m
00:56
00:58
Day: 2
42.2 km
15 intermediate stations
00:33
#4
42.2 km
/==/
Zone: ER
PF# 4
Speed: 47
Elev: 106m
01:31
01:36
Day: 2
58.3 km
11 intermediate stations
01:14
#5
100.6 km
/==/
Zone: ECR
PF# 3
Speed: 68
Elev: 232m
02:50
02:55
Day: 2
200.6 km
37 intermediate stations
02:58
#6
301.2 km
/==/
Zone: ECR
PF# 1
Speed: 74
Elev: 109m
05:53
05:58
Day: 2
Remote Location Quota Starting and Charting Station
205.0 km
39 intermediate stations
02:47
#7
506.2 km
/==/
Zone: ECR
PF# 7
Speed: 16
Elev: 79m
08:45
08:55
Day: 2
Overtaken by 03649/Ara - Banaras MEMU | Fri
18.1 km
5 intermediate stations
01:10
#8
524.3 km
/==/
Zone: NR
PF# 1
Speed: 39
Elev: 77m
10:05
10:30
Day: 2
Rake Reversal (the train reverses direction)
74.5 km
12 intermediate stations
01:55
#9
598.9 km
/==/
Zone: NER
PF# 2

Elev: 74m
12:25

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy