Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

दौड़ती है हिमालय तट से सागर, हमसफ़र हर राह पर, हवाई जहाज़ों को त्याग कर, करो अक्सर, भारतीय रेल में सफर. - Arpit P

Search Trains
Post PNR
Medium; Side View; Small TB; 3 AC; Outside of Train; Standing at Station;
Entry# 3611511-0
Medium; Small TB;
Entry# 3611979-2


Availability Calendar
Search GHY to NCB
Return# 15625
PDF Download

15626/Agartala - Deoghar Weekly Express (PT)
Other Names: Satsang Express
अगरतला - देवघर साप्ताहिक एक्सप्रेस

GHY/Guwahati --> NCB/New Cooch Behar

Updated: Feb 29 (20:08) by guest
Feb 29 (20:08)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between GHY and NCB.
Travel Time: 6h 20m     3 halts
Distance: 282 km     Avg Speed: 45 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 08:55
Guwahati/GHY 
Platform# 6
Sun
 
 
 
 
 
 
Arrives @ 15:15
NCB/New Cooch Behar 
Platform# 1,3
Sun
 
 
 
 
 
 
Type: Mail/Express
Rake Zone: NFR/Northeast Frontier
Latest News
(You need to double-check/verify this info yourself)
JCO 23/12/2023 will be diverted via Kamakhya-Goalpara Town-New Bongaigaon.
Sat Dec 16, 2023 (05:52PM)
News History
JCO upto 20/05/2023 will be diverted via Kamakhya-Goalpara Town-New Bongaigaon.
Sun May 14, 2023 (01:33AM)
JCO 27.08.2022 will remain cancelled.
Tue Aug 23, 2022 (08:34PM)
It has been decided to provide TWO MINUTES additional stoppage of 15626 Agartala - Deoghar Express at Sultanganj due to Shravani Mela. Arrival and Departure timings of these express at Sultanganj is as under; 15626 Agartala - Deoghar Express (Journey commence on 23rd, 30th July, 6th, & 13th Aug2022) Arrival...
more...
02;07 Departure 02;09.
Tue Jul 19, 2022 (10:00PM)
दिनांक 23 july 2022 se चलेगी
Sat Jul 16, 2022 (07:56PM)
दिनांक 26 जून 2022 तक अगरतला से निरस्त रहेगी।
Thu May 19, 2022 (01:29PM)
* JCO 02.10.2021 diverted via Samuktala road - Alipur Duar Jn. - Siliguri Jn. with 5 min stoppage at Alipur Duar Jn. * Remain cancelled on 09.10.2021.
Fri Oct 01, 2021 (07:40AM)
1 Follows
Rating: 4.8/5 (36 votes)
cleanliness - excellent (7)
punctuality - excellent (7)
food - excellent (1)
ticket avbl - excellent (7)
u/r coach - excellent (7)
railfanning - excellent (7)
safety - good (7)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Jul 06, 2018
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
 S1
  5
 S2
  6
 S3
  7
 S4
  8
 S5
  9
 B1
 18
 S9
 17
 S8
 16
 S7
 15
 S6
 14
 PC
 13
 B5
 12
 B4
 11
 B3
 10
 B2
 19
S10
 20
 GS
 21
EOG
 LMG
RSA - Rake Sharing
05627/05628 , Single Rake with PM at AGTL/NFR.


Loco/Rake Reversals
LMG/Lumding Junction

Show ALL intermediate Stations

3 halts. 37 intermediate Stations between Guwahati and New Cooch Behar
#1
-570.8 km
%--%
Zone: NFR
PF# 1,3
Speed: 63
Elev: 22m

19:00
Day: 1
37.6 km
2 intermediate stations
00:36
#2
-533.1 km
%--%
Zone: NFR
PF# 1
Speed: 49
Elev: 47m
19:36
19:38
Day: 1
29.3 km
1 intermediate stations
00:36
#3
-503.8 km
/--/
Zone: NFR
Speed: 49
Elev: 90m
20:14
20:16
Day: 1
72.5 km
7 intermediate stations
01:29
#4
-431.3 km
/--/
Zone: NFR
PF# 1
Speed: 53
Elev: 30m
21:45
21:47
Day: 1
81.7 km
17 intermediate stations
01:33
#5
-349.6 km
/--/
Zone: NFR
Speed: 35
Elev: 20m
23:20
23:30
Day: 1
Bankers Attached.
71.0 km
9 intermediate stations
02:02
#6
-278.6 km
%--%
Zone: NFR
PF# 1
Speed: 29
Elev: 437m
01:32
01:34
Day: 2
98.0 km
16 intermediate stations
03:26
#7
-180.5 km
/--/
Zone: NFR
Speed: 58
Elev: 138m
05:00
05:15
Day: 2
Rake Reversal (the train reverses direction)
Bankers Detached.
89.6 km
10 intermediate stations
01:33
#8
-91.0 km
/==/
Zone: NFR
PF# 1
Speed: 47
06:48
06:50
Day: 2
Loco Change : Diesel to Electric
91.0 km
16 intermediate stations
01:55
#9
0.0 km
/==/
Zone: NFR
PF# 6
Speed: 27
Elev: 59m
08:45
08:55
Day: 2
Remote Location Quota Starting and Charting Station.
6.8 km
0 intermediate stations
00:15
#10
6.8 km
/==/
Zone: NFR
PF# 1,2
Speed: 31
Elev: 56m
09:10
09:12
Day: 2
40.8 km
4 intermediate stations
01:18
#11
47.6 km
%==%
Zone: NFR
PF# 1
Speed: 41
Elev: 58m
10:30
10:35
Day: 2
Remote Location Quota Starting and Charting Station
109.1 km
14 intermediate stations
02:40
#12
156.7 km
/==/
Zone: NFR
PF# 1,3
Speed: 65
Elev: 60m
13:15
13:20
Day: 2
125.2 km
16 intermediate stations
01:55
#13
282.0 km
/==/
Zone: NFR
PF# 1,3
Speed: 46
Elev: 49m
15:15
15:20
Day: 2
Remote Location Quota Starting and Charting Station.
125.5 km
17 intermediate stations
02:45
#14
407.5 km
/==/
Zone: NFR
PF# 3,5
Speed: 60
Elev: 114m
18:05
18:15
Day: 2
Remote Location Quota Starting and Charting Station.
183.8 km
34 intermediate stations
03:05
#15
591.2 km
/==/
Zone: NFR
Speed: 73
Elev: 32m
21:20
21:35
Day: 2
58.6 km
9 intermediate stations
00:48
#16
649.9 km
/==/
Zone: ECR
PF# 2
Speed: 52
Elev: 39m
22:23
22:25
Day: 2
67.0 km
10 intermediate stations
01:18
#17
716.9 km
%≡≡%
Zone: ECR
PF# 1
Speed: 12
Elev: 39m
23:43
23:45
Day: 2
19.5 km
2 intermediate stations
01:35
#18
736.4 km
/--/
Zone: ER
PF# 1
Speed: 57
Elev: 59m
01:20
01:25
Day: 3
34.2 km
11 intermediate stations
00:36
#19
770.6 km
/==/
Zone: ER
Speed: 45
Elev: 44m
02:01
02:03
Day: 3
Experimental basis halt w.e.f 4.03.24
24.2 km
6 intermediate stations
00:32
#20
794.8 km
/==/
Zone: ER
PF# 3
Speed: 32
Elev: 43m
02:35
02:45
Day: 3
52.8 km
13 intermediate stations
01:40
#21
847.6 km
/--/
Zone: ER
PF# 1
Speed: 35
Elev: 89m
04:25
04:27
Day: 3
54.8 km
6 intermediate stations
01:33
#22
902.4 km
/--/
Zone: ER
PF# 3

Elev: 257m
06:00

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy