Search Forum
Blog Entry# 1033958
Posted: Mar 23 2014 (21:28)
14 Responses
Last Response: Mar 29 2014 (14:49)
14 Responses
Last Response: Mar 29 2014 (14:49)
Mar 23 2014 (21:28) 12867/Howrah - Puducherry SF Express (PT) | PDY/Puducherry (Pondicherry) (5 PFs)
adi11bgsg
adi11bgsg 7 blog postsHello Friends, I've joined the Forum Today.
A small query: Does the 12867 HWH-PDY Superfast Exp. runs on(hauled) by a WAP-4(mainly SRC) uptill PDY?
Or is there a loco change (WDM-series) from KPD to PDY?
Since,the whole of route through VM till PDY is already electrified under 25kV A.C.
A small query: Does the 12867 HWH-PDY Superfast Exp. runs on(hauled) by a WAP-4(mainly SRC) uptill PDY?
Or is there a loco change (WDM-series) from KPD to PDY?
Since,the whole of route through VM till PDY is already electrified under 25kV A.C.
10 Posts
Hi good evening
For reply to your query, VM-KPD section is unelectrified- hence the trains change loco at KPD
You can see in attached pic a SRC loco idling at KPD section
For reply to your query, VM-KPD section is unelectrified- hence the trains change loco at KPD
You can see in attached pic a SRC loco idling at KPD section
Thanks Friend.
It is really disheartening that inspite of all the Railway network in the Southern India more or less Electrified,why the KPD-VM section remains non-electrified???!!!
It is really disheartening that inspite of all the Railway network in the Southern India more or less Electrified,why the KPD-VM section remains non-electrified???!!!
After GC it was thrown open for traffic recently and there are lot more lines especially towards Delta region that have to be electrified still- so this will get priority after that owing to lesser number of trains