In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic...
more...
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic...
more...
2 Public Posts - Fri Dec 23, 2016
Really useful info, thanks a lot. I hope along with electrification, they are doubling Bagratawa-Sontalai section as well...
4 Public Posts - Fri Dec 23, 2016
6 Public Posts - Sat Dec 24, 2016
2 Public Posts - Sun Dec 25, 2016
2 Public Posts - Mon Dec 26, 2016
2 Public Posts - Wed Jan 04, 2017
2 Public Posts - Thu Jan 05, 2017