Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

इस मंज़िल पर मिलने वाले, उस मंज़िल पर दोस्त बन जाते हैं

Search Forum
<<prev entry    next entry>>
Blog Entry# 2246900
Posted: Apr 23 2017 (11:12)

30 Responses
Last Response: Jul 31 2017 (00:27)
General Travel
13397 views
6

Apr 23 2017 (11:12)   HRI/Hardoi (5 PFs)
anna~
anna~   5521 blog posts
Entry# 2246900            Tags  
I was going through the U.P. map, and thought an idea about making this station as the junction station, as shown in the map. This new route can also be the alternative to congested NDLS-CNB route, especially for CNB terminating trains, coming from NDLS side.
Example Shram Shakti Express, via GZB-MB-BE-HRI-ON-CNB. This overall route may take 8 hours for a superfast, but will improve the timings for NDLS-CNB pax of this train.
Also the trains from Farukhhabad (like JP-LJN Express) can come to Hardoi directly from Farukhhabad, skipping CNB (JP-CNB section
...
more...
already have too many trains).
Among BSK, Vaishali, Gorakhdham etc, those take LKO-CNB-ETW-TDL route, a one or two can be diverted via LKO-HRI-FBD-SKB-TDL route. With so many trains from NDLS and Bihar to CNB, I dont think CNB will have any problem in diverting 1-2 trains.
In future, after electrification and speed upgradation of the section, Even a few Rajdhani's can also be diverted through this route.
Also, Can be an alternate NDLS-ALD route via: MB-BE-HRI-ON-UCR.
Suggestions please.

Translate to English
Translate to Hindi

6 Public Posts - Sun Apr 23, 2017

15 Public Posts - Tue Apr 25, 2017

4 Public Posts - Wed Apr 26, 2017

6234 views
0

Apr 26 2017 (21:29)
NAWABShatabdi~
NAWABShatabdi~   7642 blog posts
Re# 2246900-27              
Nothing other than NRs fault..NR is doing nothing for this region and LKO as well..1972 was the last time 2 platforms were added to LKO NR with 50 trains running..And now the count is 300+ trains and still the same number of platforms..Whose falt is this..?
The line for GKP BSB ALD anywhre passes through Dilkusha Cabin which still had just 1 incoming and 1 outgoing lines..still not any of the outer lines through here have 3rd 4th line..I wonder who neglcts a state capital by such margin..
LKO has a very
...
more...
good inter-state connectivity but for south regions u need to have a look at CNB NDLs for traveling..
And this is just Beacuse of NRs fault othrwise u wud have had half of the Rajdhanis Durantos running via LKO..
So for evrything it is just NRs fault for not doing anything for this region...
If even in 2017 a trains takes 90-100 min to cover 74Km LKO-CNB distance..This is a question mark on IR and NR..

Translate to English
Translate to Hindi

1 Public Posts - Wed Apr 26, 2017

1 Public Posts - Thu Apr 27, 2017

1 Public Posts - Mon Jul 31, 2017
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy