Search Forum
Blog Entry# 3683211
Posted: Aug 04 2018 (08:10)
3 Responses
Last Response: Aug 04 2018 (09:15)
3 Responses
Last Response: Aug 04 2018 (09:15)
Aug 04 2018 (08:10) 22692/Hazrat Nizamuddin - K.S.R. Bengaluru Rajdhani Express | DHQ/Dharakhoh (3 PFs)
susmits~
susmits~ 337 blog postsNoticed something odd about the technical halts today.
1. The train halted at Dharakhoh, but on the mainline itself and *outside* of the calling on signal (i. e. before Dharakhoh). One of the LPs deboarded and inspected something behind the head engine.
2....
more...
1. The train halted at Dharakhoh, but on the mainline itself and *outside* of the calling on signal (i. e. before Dharakhoh). One of the LPs deboarded and inspected something behind the head engine.
2....
more...
With wap7 in charge bankers attachment is not compulsorily done every time.
In July , when I travelled in ksk only break inspection was done in main line that too in darakhoh and maramjhiri was skipped
In July , when I travelled in ksk only break inspection was done in main line that too in darakhoh and maramjhiri was skipped
2 Public Posts - Sat Aug 04, 2018