Mar 05 2019 (08:06) 12785/Kacheguda - Mysuru SF Express (PT) | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
krishnaprasad~
krishnaprasad~ 3088 blog posts12785 exp to Mysuru from today with RPM AC LOCO between SBC-MYS and back, Few snaps of the same
12 Posts
LC undi SBC lo ...still that's tooo much tupuk tupuk schedule between MYS-SBC...should have cut atleast 30-45min runtime ...20m should have been enough at SBC ...and another 20-25min they can cut between MYS-SBC ...
eemadya kotha concept vachindi ga...
oka section ki superfast ..inko section lo express ani...adi vachaka manodu vadilesi untadu...inthakamundu ilanti bokadia schedule isthadu dani SF tag pothundi ane kada oppukoledu..
eemadya kotha concept vachindi ga...
oka section ki superfast ..inko section lo express ani...adi vachaka manodu vadilesi untadu...inthakamundu ilanti bokadia schedule isthadu dani SF tag pothundi ane kada oppukoledu..
They are just trying to have a easy schedule with no Overtakes or such things.
If it starts later at MYS, then it will have to OT MYS-SBC passenger.
And at SBC, that is a busy time with lots of shunting going on for KK and other trains. So, LC will take some time. They just gave a schedule which makes their job easier.
If it starts later at MYS, then it will have to OT MYS-SBC passenger.
And at SBC, that is a busy time with lots of shunting going on for KK and other trains. So, LC will take some time. They just gave a schedule which makes their job easier.
As it is sf so it should cover SBC Mys in 2.30 minutes vice versa then it will be success as every time I travel from Mysore to Yelahanka in basava or hampi it takes 5 hours
yeah that is true.....they thoguht about making their life easier....but blocking a PF for 40min is also not a good thingd kada...anyhow now its 51/52 average after ext ....eeee partly SF and partly Express concept vachaka ilantivi ekkuvipoyayi bhaga..SWR lo ne idi rendodi after sur-has..
There are many trains in SWR that have this concept. MAS-SSPN, MYS-MV are examples.