Search Forum
Filters:
Page# 422008 Blog Entries next>>
Today (07:51) 04328/Kanpur Central - Sitapur City Passenger Special (UnReserved) | BLM/Balamau Junction (4 PFs)
AdityaUnnao
AdityaUnnao 39 blog postsI did a tweet on the pathetic timetable of this train. Kindly like and retweet for better response from railways.
click here
click here
Anyone having the proposals copy sent to RB for the new trains from Howrah via Masagram bankura route? Please share
Jun 21 (22:25) 12187/Jabalpur - Mumbai CSMT Garib Rath Express | JBP/Jabalpur (7 PFs)
K.K.^~
K.K.^~ 162104 blog posts8 Posts
I think they rolled back because of there would be less coaches in LHB as compared to ICF as it is running housefull
They could have alloted 18 + 1 extra 3E coach. The total number of berths would have been increased by 30 in that case.
I think LHB conversation has been put on hold for want of LHB 3E rake. It was announced to get 3A coaches.
I think LHB conversation has been put on hold for want of LHB 3E rake. It was announced to get 3A coaches.
ha but dher sara 3E pada hua hai idhar udhar.. rake nhi bana paye itna jldi notice par lag rha
The RSA Narayanadri had so far
1. Narayanadri - falaknuma with PM at TPTY
2. Narayadri as standalone ICF
3. Narayanadri as Standalone LHB
4....
more...
1. Narayanadri - falaknuma with PM at TPTY
2. Narayadri as standalone ICF
3. Narayanadri as Standalone LHB
4....
more...
Narayanadri used to have rsa with gouthami express before the RSA with falaknuma happened, it was for a short period of time
Ohh I never knew that ! Where was the PM during that time ? Was it TPTY or COA or SC ?
11 Posts
There is no possible to construct CCT - PAP mainline so SCR & RB Dropped
100% central government funding ani confirm ga chepalev state government may have to do some funding or atleast need to acquire land wherever required
Ippudu GDR - BZA - BPQ Tripling projects ke state government share eme ishtanda??
First BZA - DVD or SLO - NDD Tripling project Funds sanctioned ayna Travrta chudam le
Funds sanctioned...
more...
First BZA - DVD or SLO - NDD Tripling project Funds sanctioned ayna Travrta chudam le
Funds sanctioned...
more...
I know , its not easy as drawing on pic .
Main reason of not feasible is delaying from 30 years.
Still kakinada deserves better rail connectivity.
Main reason of not feasible is delaying from 30 years.
Still kakinada deserves better rail connectivity.
First Konaseema railway line complete ayita CCT nuchi new Train introduced cheyacchu
Page# 422008 Blog Entries next>>