Search Forum
Filters:
Page# 63388 Blog Entries next>>
Yesterday (23:26) 04718/Tirupati - Hisar SF Special Fare Special
SaiCharan^~
SaiCharan^~ 3443 blog postsHsr tpty hsr tod ( tpty hsr new slot) , some tod trains coach composition revised, cancellation of trains
Note : 07031/2 composition 2slr, 4 gs, 12sleeper, 1 third ac, 2 second ac, 1 first cum second ac instead of hybrid rake.
Note : 07031/2 composition 2slr, 4 gs, 12sleeper, 1 third ac, 2 second ac, 1 first cum second ac instead of hybrid rake.
Today (01:43) 12744/Vikramasimhapuri Amaravati Intercity Express
SaiCharan^~
SaiCharan^~ 3443 blog postsAddition of coaches of Vikramsimha Puri express should be regularised.
Jun 28 (12:23) 22107/Mumbai CSMT - Latur SF Express (PT) | DR/Dadar Central (7 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~ 482 blog postsRailways should merge 22107/08 Mumbai CSMT Latur express and 22143/44 Mumbai CSMT Bidar express and after merging both trains railways should extend it upto Kazipet jn and should run train as 22107/08 Mumbai CSMT Kazipet jn Daily Superfast express via Latur and for further information refer to these blogs - 6040597, 6040641 or refer to the links given below -
/train/226103
...
more...
/train/226103
...
more...
2 Posts
SCR may not agree considering, Devagiri exists for Nanded area and Hyderabad/HussainSagar also exists via Daund Wadi
Great idea 💯. We will get another train for Secunderabad via Bidar and Latur, and it will take around 13 hours time. My suggestion is extend upto Lingampalli as the Secunderabad platform availability is tough or can start from Charlapalli new railway terminal.
Currently upto Bidar it is taking 12 hours and by extending and cutting down slack time given, the train can reach Lingampalli in 13 hours.
Currently upto Bidar it is taking 12 hours and by extending and cutting down slack time given, the train can reach Lingampalli in 13 hours.
लातूर मुंबई एक्सप्रेस १६ घंटे लातूर में रुकी रहती है यह ट्रेन लातूर मिराज एक्सप्रेस चलनी चाहिए, ११४०५/०६ पुणे अमरावती एक्सप्रेस को इसे अहमदाबाद जंक्शन तक बढ़ाना चाहिए १७०१३/१४ हडपसर काजीपेट एक्सप्रेस रेलवे को इसे सूरत जंक्शन तक बढ़ाना चाहिए और ट्रेन चलानी चाहिए.
But if we extend this train upto Kazipet then this train will always be full between Mumbai and Kazipet because 18519/20 Mumbai LTT Visakhapatnam express and 11019/20 Mumbai LTT Bhubaneswar Konark express always run full between Mumbai and Kazipet so extension of 22107/08 upto Kazipet will benefit people who want to travel between Mumbai and Kazipet.
Source Drm Jhansi X Handle
Today on 29.6.24, under his 2-day tour program, CRS NE circle Shri Pranjeev Saxena along with CAO(C) Shri Vipin Kumar & DRM Shri Deepak Kumar Sinha, conducted a detailed inspection of the newly commissioned doubling work b/w Mauranipur-Ranipur rd, sec over Jhansi Div.
#Infra_NCR
Today on 29.6.24, under his 2-day tour program, CRS NE circle Shri Pranjeev Saxena along with CAO(C) Shri Vipin Kumar & DRM Shri Deepak Kumar Sinha, conducted a detailed inspection of the newly commissioned doubling work b/w Mauranipur-Ranipur rd, sec over Jhansi Div.
#Infra_NCR
Page# 63388 Blog Entries next>>