Search Forum
Filters:
Jun 14 (10:04) JMP/Jamalpur Junction (4 PFs)
LHBfied1307172SUPEREXPRES~
LHBfied1307172SUPEREXPRES~ 284 blog postsLatest update about doubling of JMP-MGR-KGG rail line including new rail bridge beside Shri Krishna Setu....
The current bridge is wide enough to hold 2 tracks, why do they need to build a new bridge.
Munger Ganga bridge is wider than Patna Digha bridge that is 2 lanes.
Munger Ganga bridge is wider than Patna Digha bridge that is 2 lanes.
Railway track is fitted in middle of bridge. For doubling in same bridge, current railway track must be re arranged to either left or right in bridge to create some space for second track
Jun 10 (16:53) 17230/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123 157 blog postsSabari Exp to be permanently short terminated at KCVL once the KCVL terminal works are completed
Source- TAG 2023-24
As the works are running with full swing at KCVL. Soon we can see sabari exp till KCVL
Source- TAG 2023-24
As the works are running with full swing at KCVL. Soon we can see sabari exp till KCVL
Less chance as daily commuters oppose this.The same messages was there for the last few TT as well
This is there in every TT book - from start. It was the first train that was supposed to be shifted to KCVL but they never did.
Today (08:50) 13178/Jangipur Road - Sealdah Express (UnReserved) | JRLE/Jangipur Road (3 PFs) | SRC/WAP-4/22936
RailfanRanga~
RailfanRanga~ 191 blog posts13063/Howrah Balurghat Express slowly skips Jangipur Road and meets 13178/Jangipur Sealdah Express.
Video link
click here
Video link
click here
Today (08:21) 06595/KSR Bengaluru - Dharmavaram MEMU | YNK/Yelahanka Junction (5 PFs)
Harsha_12627^~
Harsha_12627^~ 5134 blog postsMore Posts