Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

patri ke is taraf ya us taraf, zindagi mein hum sab RailFan ek taraf - Ananya D'Souza

Search Forum
Filters:
Page#    6 Blog Entries  <<prev  
1 Followers
General Travel
8929 views
0

Jan 02 2013 (14:44)  
 
rahulkumarjain^~
rahulkumarjain^~   16613 blog posts
Entry# 629343              
Updated list as per input given in #Entry /blog/post/623995
• CR Zone new railline under construction (574 Km)
.
2. Ahmednagar - Beed - Parli Vaijnath (250 km)
3. Baramati - Lonand (54
...
more...
km)
5. Wardha - Nanded (via Yevatmal-Pusood) (270 km)
=======================================================
• ECOR Zone new railline under construction (1172 Km)
.
1. Angul-Sukinda Road (98.7 km)
2. Daitari-Banspani (155 km)
3. Haridaspur-Paradeep (82 km)
4. Khurda Road-Bolangir (289 km)
5. Lanjigarh Road-Junagarh (56 km)
6. Talcher-Bimlagarh (154 km)
7. Talcher-Sambalpur (174 km)
8. Koraput-Rayagada (164 km)
=======================================================
ECR Zone new railline under construction (574 Km)
.
1. Sakri-Hasanpur (79 km)
2. Munger - Rail cum road bridge on river Ganga (14 km)
3. Patna - Ganga bridge with linking lines between Patna & Hajipur (rail cum road bridge)
(19 km)
5. Giridih-Koderma (102.5 km)
6. Muzaffarpur-Sitamarhi (63 km)
7. Khagaria-Kusheshwarsthan (44 km)
8. Rajgir-Hisua-Tilaya (46 km) & Natesar-Islampur (21 km)
9. Koderma-Ranchi (189 km)
10. Kosi Bridge
11. Koderma-Tilaiya (68 km)
12. Hajipur-Sagauli via Vaishali (148.3 km)
13. Chhapra-Muzaffarpur (84.65 km)
14. Darbhanga-Kusheshwar Asthan (70.14 km)
15. Motihari-Sitamarhi (76.7 km)
16. Bihta-Aurangabad via Anugrahanarayan Road (118.45 km)
17. Sitamarhi-Jaynagar-Nirmali via Susand (188 km)
18. Muzaffarpur-Katra-Oral-Janakpur Road (66.55 km)
19. Ara-Bhabhua Road (122 km)
20. Araria-Supaul (92 km)
21. Dehri on Sone-Banjari (36.4 km)
22. Gaya-Daltonganj via Rafiganj (136.88 km)
23. Gaya-Bodhgaya-Chatra, Gaya-Natesar (Nalanda)
24. Nawada-Laxmipur (137 km)
25. Kursela-Bihariganj (35 km)
26. Muzaffarpur-Darbhanga (66.9 km)
=======================================================
ER Zone new railline under construction (574 Km)
.
1. Lakshmikantapur-Namkhana-Chandanagar with new Material Modification for Kakadwip-
dakhali (5 km) & Chandanagar-Bakhali (17.2 km)
3. Deoghar-Sultanganj incl. Banka to Barhat & Banka to Bithia Road(147 km)
4. Tarakeswar-Bishnupur with extension upto Dhaniakhali, Arambagh-Irphala and new Material
Modification for Irphala-Ghatal (11.2 km)
5. Arambagh-Champadanga (23.3 km)
6. Rampurhat-Mandarhill via Dumka (130 km) with new Material
7. Modification for Rampurhat-Murarai (29.48 km) - 3rd line
8. Bariarpur-Mananpur via Kharagpur, Lachimpur-Barhat (67.78 km)
9. Sultanganj-Katuria via Asarganj, Tarapur & Belhar (74.8 km)
10. Tarkeshwar-Magra (51.95 km)
11. Hasnabad-Hingalganj (14 km)
12. Hansdiha-Godda (30 km)
=======================================================
NCR Zone new railline under construction (574 Km)
.
1. Guna-Etawah via Shivpur-Gwalior-Bhind (348.25 km)
2. Etawah-Mainpuri (57.5 km)
3. Lalitpur-Satna, Rewa-Singrauli & Mahoba-Khajuraho (541 km)
4. Agra-Etawah via Fatehabad & Bah (110 km)
=======================================================
NER Zone new railline under construction
.
1. Rampur-Lalkuan-Kathgodam - Road over bridge on National
2. Highway near Rampur
3. Kichha-Khatima (57.7 km)
4. Maharajganj-Masrakh (35.49 km) with material modification for new line between
5. Masrakh-Rewa Ghat (30 km)
6. Hathua-Bhatni
7. Chhitauni-Tumkuhi Road (58.88 km)
=======================================================
NFR Zone new railline under construction (574 Km)
.
1. Eklakhi-Balurghat (87.11 km), Gazol-Itahar (28 km) & new Material
2. Modification for Raiganj-Itahar (21.8 km)
3. Dudhnoi-Mendhipathar (19.75 km)
4. Kumarghat-Agartala (109 km)
5. Bogibeel bridge with linking lines between Dibrugarh & North Bank line (46 km)
6. Harmoti-Naharlagun (20 km)
7. Jiribam-Imphal (97.9 km)
8. New Moynaguri-Jogighopa with gauge conversion of New Mal-Moynaguri Road and New
Changrabanda-Changrabanda (3 km)
9. Araria-Galgalia (Thakurganj) (100 km)
10. Teteliya-Byrnihat (21.5 km)
11. Dimapur-Kohima (88 km)
12. Agartala-Sabroom (110 km)
13. Jalalgarh-Kishanganj (50.077 km)
14. Bhairabi-Sairang (51.38 km)
15. Sivok-Rangpo (44.39 km)
16. Jogbani-Biratnagar (Nepal) (18 km)
17. Byrnihat-Shillong (108.4 km)
18. Kaliyaganj-Buniadpur (33.13 km)
19. Balurghat-Hilli (29 km)
20. Murkongselek - Pasighat (30.617 km)
=======================================================
NR Zone new railline under construction (574 Km)
.
1. Nangal Dam-Talwara (83.74 km) - New broad gauge line & taking
2. over siding Mukerian-Talwara (29.16 km)
3. Abohar-Fazilka (42.717 km)
4. Tarantaran-Goindwal (21.5 km)
5. Chandigarh-Ludhiana (112 km)
6. Rewari-Rohtak (81.26 km)
7. Jind-Sonepat (88.9 km)
8. Jawarhar Lal Nehru Port-Tughlakabad-Dadri via Ahmedabad &Palanpur - Dedicated
multimodal high axle load freight corridor - LandacquisitionSonenagar-Ludhiana - Dedicated
multimodal high axle load freightcorridor - Land acquisition
9. Chandigarh-Baddi (33.23 km)
10. Deoband (Muzaffarnagar)-Roorkee (27.45 km)
11. Bhanupalli-Bilaspur-Beri
12. Rishikesh-Karnaprayag (125.09 km)
=======================================================
NWR Zone new railline under construction (574 Km)
.
1. Dausa-Gangapur City (92.67 km)
3. Kolayat-Phalodi (111.394 km)
4. Bangurgram-Ras (27.8 km)
=======================================================
SCR Zone new railline under construction (574 Km)
.
1. Peddapalli-Karimnagar-Nizamabad (177.49 km)
2. Nandyal-Yerraguntla (126 km)
3. Munirabad-Mahabubnagar (246 km)
4. Macherla-Nalgonda (92 km)
5. Gulbarga-Bidar (140 km)
6. Gadwal-Raichur (60 km)
7. Kakinada-Pithapuram (21.5 km)
8. Kotipalli-Narsapur (57.21 km)
9. Obulavaripalle-Krishnapattnam (113 km)
10. Manoharabad-Kotapalli (148.9 km)
11. Vishnupuram-Janapahar (11 km)
12. Jaggayyapet-Mallacheruvu (19.1 km) with new Material Modification
13. for Mallacheruvu-Janapahar (24 km)
14. Cuddapah-Bangalore (Bangarapet) (255.4 km)
15. Bhadrachalam Road-Sattupalli (56.25 km)
16. Gudur - Durgarajapatnam (41.55 km)
=======================================================
SER Zone new railline under construction (574 Km)
.
1. Howrah-Amta, Bargachia-Champadanga-Tarakeshwar, Amta-Bagnan& new Material Modification
for Janghipara-Furfura Sharif (12.3km)
2. Bowaichandi-Arambagh (31 km)
3. Digha-Jaleswar (41 km) with new Material Modification for Digha-
4. Egra (31 km)
5. Tamluk-Digha, Deshpran-Nandigram with new Material Modification
6. for Kanthi-Egra (26.2 km)
7. Badutola - Jhargram via Lalgarh (54 km)
=======================================================
SECR Zone new railline under construction (284.5 Km)
.
1. Dallirajahara-Jagdalpur (235 km)
2. Wadsa - Gadchiroli (49.5 km)
=======================================================
SR Zone new railline under construction (887.71 Km)
.
1. Tirunnavaya-Guruvayur (35 km)
2. Karur-Salem (85 km) with new Material Modification for Salem-
3. Mettur Dam (43.43 km) - doubling
4. Angamali-Sabarimala (116 km)
5. Tindivanam-Gingee-Tiruvannamalai (70 km)
6. Tindivanam-Nagari (179.2 km)
7. Attipattu-Puttur (88.30 km)
8. Erode-Palani (91.05 km)
9. Chennai-Cuddalore via Mahabalipuram (179.28 km)
=======================================================
SWR Zone new railline under construction (1106 Km)
.
1. Kottur-Harihar via Harpanhalli (65 km)
2. Kadur-Chickmagalur-Sakleshpur (93 km)
3. Hassan-Bangalore via Shravanabelgola (166 km)
4. Hubli-Ankola (167 km)
5. Bangalore-Satyamangalam (260 km)
6. Rayadurg-Tumkur via Kalyandurg (213 km)
7. Bagalkot-Kudachi (142 km)
=======================================================
SWR Zone new railline under construction (262 Km)
.
1. Ramganj Mandi-Bhopal (262 km)
=======================================================
WR Zone new railline under construction (357.97 Km)
.
1. Dahod-Indore via Sardarpur, Jhabua & Dhar (200.97 km)
2. Chhota Udepur-Dhar (157 km)

Translate to English
Translate to Hindi

3 Public Posts - Wed Jan 02, 2013
Page#    6 Blog Entries  <<prev  

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy