Search Forum
Filters:
Jun 16 (21:37) MDU/Madurai Junction (7 PFs)
sivaprakashofficial^~
sivaprakashofficial^~ 6828 blog posts6 Posts
Why via TPJ is not understood.
I feel it should start from MDU by 0630 and reach SMVB/ BNC by 1300. Return 1400 MDU 2030. Should be via DG KRR.
I feel it should start from MDU by 0630 and reach SMVB/ BNC by 1300. Return 1400 MDU 2030. Should be via DG KRR.
Yes, I agree. via TPJ is a foolish decision. If needed, separate VB can be introduced to delta side (TJ) from SBC via TPJ. This is of no use for MDU peeps!!
This is only demand Tj to SBC
Mdu to SBC via karur people have to pay more money and more time waste .
Mdu to SBC via karur people have to pay more money and more time waste .
Given that BNC has additional pf now , they could have tried terminating train over there as compared to SMVT.
Today (20:33) 17230/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123 157 blog posts𝙏𝙚𝙧𝙢𝙞𝙣𝙖𝙡 𝘾𝙝𝙖𝙣𝙜𝙚 𝙐𝙥𝙙𝙖𝙩𝙚
The following trains are subjected for the terminal change from "Secunderabad" to Charlapalli(CHZ)
12731/32 - SC TPTY Exp
12763/64 - Padmavati SF
17229/30 - Sabari Exp
Operating...
more...
The following trains are subjected for the terminal change from "Secunderabad" to Charlapalli(CHZ)
12731/32 - SC TPTY Exp
12763/64 - Padmavati SF
17229/30 - Sabari Exp
Operating...
more...
4 Posts
what about snsi sc exp hyd awb exp will these trains terminal get shifted at CHZ
Need to wait until the TAG 24(July 1st) is released to public, the info will be clear with it. Soon the PR will be out.
No I don't think these trains get terminated at chz,even if they terminate at chz it should/will touch SC/HYB
regarding 17001/02 Sc Snsi Exp Im Sure That This Trains Terminal Might Get Shifted To CHZ
HYB AWB exp is merged with GNT SC exp and to run as GNT AWB exp via- Nandyal, KRNT, KCG, SC, LPI from
30/06/2024 ex-GNT
01/07/2024 ex-AWB
No Idea about SC SNSI exp as far as now
30/06/2024 ex-GNT
01/07/2024 ex-AWB
No Idea about SC SNSI exp as far as now
Sir please update the track status to Signle Line Electrification as OHE poles are already installed in AGTL SBRM section.
So please do the needful.
So please do the needful.