Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Purvanchal Express - Poorvottar ka Sikandar

Search Forum
Filters:
Page#    421153 Blog Entries  <<prev  next>>
General Travel
6770 views
5

Yesterday (10:58)   19667/Palace Queen Humsafar Express
VIVEKEXPRESS^~
VIVEKEXPRESS^~   40384 blog posts
Entry# 6082903            Tags   Past Edits
2 compliments
Agree Agree
Agar Railways ko Humsafar Express trains mein Sleeper class coach lagane ही है तो फिर सभी Humsafar trains mein lagane चाहिए फिर....

Atleast minimum 5 Sleeper class coach toh लगानी चाहिए
3AC k minimum 12 coach kr Dena chahiye
...
more...

Ab
उदयपुर - दिल्ली Sarai Rohilla Humsafar
Udaipur - Maysore Humsafar mein
1 ONE Sleeper class k coach hain
Single coach k kya sense hain yaar .......

Translate to English
Translate to Hindi

6233 views
1

Yesterday (11:04)
SCRrailfan
SCRrailfan   122 blog posts
Re# 6082903-1              
Yes,even tpty-jat Humsafar needs atleast 5 sleepers
Translate to English
Translate to Hindi

2174 views
0

Today (12:20)
KnightWarrior21
KnightWarrior21   46 blog posts
Re# 6082903-2              
Same goes for the 3AC coaches in Humsafar also. 20497 - RMM - FZR Humsafar EXP. has 3E coaches in the name of 3AC and charges the same price of 3AC. If they want to add 3E class, then they need to add it as a separate class, not under 3AC class. 3E is a disappointment in the name of comfort. Hope they don't bring 2E and 1E in the future.
Translate to English
Translate to Hindi
General Travel
11472 views
10

May 24 (16:03)   MMCT/Mumbai Central (5 PFs)
Vijayawada^
Vijayawada^   610 blog posts
Entry# 6074654            Tags  
4 compliments
Useful Great _/\_ Useful
Pitlines in various Coaching Depots in Western Railway Zone:

1. Mumbai Central Coaching Depot - 6 Pitlines
• Pitline-1 557m 24 ICF/23 LHB
• Pitline-2 540m 24 ICF/22 LHB
...
more...
Pitline-3 570m 24 ICF/22 LHB
• Pitline-4 465m 25 ICF/23 LHB
• Pitline-5 540m 24 ICF/22 LHB
• Pitline-6 540m 24 ICF/22 LHB

2. Bandra (T) Coaching Depot - 5 Pitlines
• Pitline-1 540m 24 ICF/22 LHB
• Pitline-2 540m 24 ICF/22 LHB
• Pitline-3 540m 24 ICF/22 LHB
• Pitline-4 540m 24 ICF/22 LHB
• Pitline-5 540m 24 ICF/22 LHB

3. Valsad Coaching Depot - 2 Pitlines
• Pitline-1 540m 24 ICF/22 LHB
• Pitline-2 540m 24 ICF/22 LHB

4. Surat Coaching Depot - 3 Pitlines
• Pitline-1 555m 25 ICF/23 LHB
• Pitline-2 555m 25 ICF/23 LHB
• Pitline-3 573m 26 ICF/24 LHB

5. Udhana (Surat) Coaching Depot - 2 Pitlines
• Pitline-1 594m 26 ICF/24 LHB
• Pitline-2 538m 24 ICF/22 LHB

6. Ahmedabad Coaching Depot - 4 Pitlines
• Pitline-1 490m 21 ICF/20 LHB
• Pitline-2 383m 17 ICF/15 LHB
• Pitline-3 383m 17 ICF/15 LHB
• Pitline-4 383m 17 ICF/15 LHB

7. Kankaria Coaching Depot - 5 Pitlines
• Pitline-1 605m 26 ICF/24 LHB
• Pitline-2 605m 26 ICF/24 LHB
• Pitline-3 605m 26 ICF/24 LHB
• Pitline-4 605m 26 ICF/24 LHB
• Pitline-5 605m 26 ICF/24 LHB

8. Sabarmati Coaching Depot - 4 Pitlines
• Pitline-1 610m 26 ICF/24 LHB
• Pitline-2 610m 26 ICF/24 LHB
• Pitline-3 610m 26 ICF/24 LHB (Under Construction)
• Pitline-4 610m 26 ICF/24 LHB (Under Construction)

9. Gandhidham Coaching Depot - 2 Pitlines
• Pitline-1 560m 25 ICF/23 LHB
• Pitline-2 535m 24 ICF/22 LHB

10. Bhuj Coaching Depot - 1 Pitline
• Pitline-1 535m 24 ICF/22 LHB

11. Indore Coaching Depot - 5 Pitlines
• Pitline-1 210m 9 ICF
• Pitline-2 540m 24 ICF/22 LHB
• Pitline-3 540m 24 ICF/22 LHB
• Pitline-4 540m 24 ICF/22 LHB
• Pitline-5 540m 24 ICF/22 LHB

12. Dr. Ambedkar Nagar Coaching Depot - 3 Pitlines
• Pitline-1 595m 26 ICF/24 LHB
• Pitline-2 595m 26 ICF/24 LHB
• Pitline-3 565m 24 ICF/22 LHB

13. Pratapnagar Vadodara Coaching Depot - 1 Pitline
• Pitline-1 580m 26 ICF/24 LHB

14. Rajkot Coaching Depot - 2 Pitlines
• Pitline-1 540m 24 ICF/22 LHB
• Pitline-2 620m 26 ICF/24 LHB

15. Hapa Coaching Depot - 1 Pitline
• Pitline-1 600m 26 ICF/24 LHB

16. Okha Coaching Depot - 1 Pitline
Pitline-1 555m 25 ICF/23 LHB

17. Bhavnagar Coaching Depot - 2 Pitlines
• Pitline-1 595m 26 ICF/24 LHB
• Pitline-2 595m 26 ICF/24 LHB

18. Porbandar Coaching Depot - 1 Pitline
• Pitline-1 540m 24 ICF/22 LHB

19. Veraval Coaching Depot - 1 Pitline
• Pitline-1 590m 26 ICF/24 LHB

Source: RTI filed by me

Translate to English
Translate to Hindi

8057 views
1

May 24 (18:05)
PankajMishra^~
PankajMishra^~   59118 blog posts
Re# 6074654-1              
VRL has 1 MG Pit also
Translate to English
Translate to Hindi

3682 views
0

Today (10:50)
AbhishekVivek^~
AbhishekVivek^~   35444 blog posts
Re# 6074654-2              
Can you attach Mumbai Central Washing Line/Pit Line Occupancy Chart here.
I doubt all of them are 24ICF at MMCT
Translate to English
Translate to Hindi

2746 views
0

Today (12:00)
Vijayawada^
Vijayawada^   610 blog posts
Re# 6074654-3              
Except 1 remaining all are 24 coaches
Translate to English
Translate to Hindi

2225 views
1

Today (12:05)
AbhishekVivek^~
AbhishekVivek^~   35444 blog posts
Re# 6074654-4              
1 compliments
Thanks
Thanks for this Information
Translate to English
Translate to Hindi
General Travel
1927 views
0

Today (12:03)  
rail_hub_lmp
rail_hub_lmp   0 blog posts
Entry# 6084178               Past Edits
How to upload my imaginary train
Translate to English
Translate to Hindi
06217/ YPR GAYA is #Overtaken by
12269/Chennai Chhapra BiWeekly SF

06217 Looped for 10 min At
NARSINGHPUR :-
17:31,
...
more...
02 Jun (-58m Late arrived)
17:43 departed after #OT.

Shridham (running 10 min Behind) :-
17:58 = 12669
18:08 = 06217 / YPR GAYA Weekly special

Translate to English
Translate to Hindi

late by 3:44 Hours
VINDHYACHAL (BDL) = 05:43 03-Jun-2024

late by 3:51 Hours
CHUNAR (CAR) = 06:14
...
more...

32 km to arrive (No #Race till DDU)
DDU/Mughal Sarai= 6:45 AM [expected arrival]

GAYA= 9:30 AM [ Expected 2 hours Late]

Translate to English
Translate to Hindi

4565 views
0

Today (07:02)
Bodhgaya^~
Bodhgaya^~   3108 blog posts
Re# 6083284-2               Past Edits
Mughal Sarai (DDU) = 06:47 - 07:02.
[ late by 3:32 Hours arrived]

NEW WEST CABIN (NEWC) = 06:42
Covered in 5 min 1 km to DDU = 06:50
...
more...

Path was clear till DDU

Translate to English
Translate to Hindi

2243 views
0

Today (11:54)
Bodhgaya^~
Bodhgaya^~   3108 blog posts
Re# 6083284-3              
reached destination
GAYA JN (GAYA) at 10:23 03-Jun-2024.

Late by (-2:53h)

...
more...

Translate to English
Translate to Hindi
General Travel
2053 views
0

Today (11:53)   08475/Puri - Hazrat Nizamuddin Special Fare Summer Special
VENKETESWAR~
VENKETESWAR~   938 blog posts
Entry# 6084175            Tags  
Railway should be regular this express train
Translate to English
Translate to Hindi
Page#    421153 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy